X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0765072216000"

m
 
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0765072216000
 
| Well ID: 0765072216000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.602299, -114.962058 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.601972, -114.962058 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-22-076-07W5/0
 
| Location: 00/16-22-076-07W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/16-22-076-07 W5/00
 
| Location Alias 2: 00/16-22-076-07 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 076
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 07
 +
|-
 +
| Section: 22
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Lesser Slave River No. 124,_Alberta|Municipal District of Lesser Slave River No. 124]]
 
| County/Municipality: [[Municipal District of Lesser Slave River No. 124,_Alberta|Municipal District of Lesser Slave River No. 124]]
Line 17: Line 27:
 
| Well Name: PRED NIPISI 16-22-76-7
 
| Well Name: PRED NIPISI 16-22-76-7
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Highwood Oil Company Ltd.]]
 
|-
 
|-
 
| License Number: 0492772
 
| License Number: 0492772
Line 23: Line 33:
 
| License Date: 2018-12-14
 
| License Date: 2018-12-14
 
|-
 
|-
| License Status: Issued
+
| License Status: Amended
 
|-
 
|-
| Spud Date:  
+
| Spud Date: 2019-10-07
 
|-
 
|-
| Final Drill Date:  
+
| Final Drill Date: 2019-10-20
 
|-
 
|-
| Well Total Depth: N/A m
+
| Well Total Depth: 2465.00 m
 
|-
 
|-
| Surface Hole Latitude: 55.602299
+
| Surface Hole Latitude: 55.601972
 
|-
 
|-
 
| Surface Hole Longitude: -114.962058
 
| Surface Hole Longitude: -114.962058
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
<!--== Spud Table ==
+
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2018-12-14
 +
| Obtained License
 +
|-
 +
| 2019-10-07
 +
| Drill To LD
 +
|-
 +
| 2019-10-08
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2019-10-09
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2019-10-09
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2019-10-09
 +
| Well Log Performed
 +
|-
 +
| 2019-10-10
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 2019-10-12
 +
| Well Log Performed
 +
|-
 +
| 2019-10-20
 +
| Finished Drilling
 +
|-
 +
| 2019-10-20
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2019-10-20
 +
| Rig Released
 +
|-
 +
| 2019-10-20
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2019-11-17
 +
| Well Began Production
 +
|-
 +
| 2019-11-17
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2019-11-17
 +
| Well Mode changed to Pumping
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Spud Date
 
!scope="col" | Spud Date
Line 54: Line 121:
 
!scope="col" | Activity Type
 
!scope="col" | Activity Type
 
|-
 
|-
|}-->
+
| 2019-10-07
 
+
| [[Stampede Drilling A Division Of Matrix Energy Technologi]]
<!--== Directional Drilling ==
+
| style="text-align: right;" | 12
 +
| style="text-align: right;" |
 +
| Drill To LD
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =ST49: Daily Spud and Drilling Activity List
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-30
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-09 }}</ref>
 +
== Directional Drilling ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Start Date
 
!scope="col" | Start Date
Line 62: Line 140:
 
!scope="col" | Reason
 
!scope="col" | Reason
 
|-
 
|-
|}-->
+
| 2019-10-09
 
+
| style="text-align: right;" | 329.20
<!--== Perforation Treatments ==
+
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2019-10-09
 +
| style="text-align: right;" | 844.60
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Perforation Date
 
!scope="col" | Perforation Date
Line 71: Line 162:
 
!scope="col" style="text-align: right;" | Interval Base (m)
 
!scope="col" style="text-align: right;" | Interval Base (m)
 
!scope="col" style="text-align: right;" | Number of Shots
 
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2019-10-20
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 928.00
 +
| style="text-align: right;" | 2465.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 
|}-->
 
|}-->
 
+
<!--==== Fluid Composition Data ====
<!--== Fracking Activities ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 94: Line 210:
 
|}-->
 
|}-->
 
   
 
   
<!--== Production Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
Line 102: Line 218:
 
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 
|-
 
|-
|}-->
+
| 2019
 
+
| style="text-align: right;" | 776
<!--== Occurences ==
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2161
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Occurence Date
 
!scope="col" | Occurence Date
Line 111: Line 244:
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
|}-->
+
| 2019-10-20
 
+
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 08:04, 18 January 2021

Well Details

Well ID: 0765072216000
Loading map...
Location: 00/16-22-076-07W5/0
Location Alias: 00/16-22-76-07 W5M
Location Alias 2: 00/16-22-076-07 W5/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 5
Range: 07
Section: 22
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: PRED NIPISI 16-22-76-7
Operator Name: Highwood Oil Company Ltd.
License Number: 0492772
License Date: 2018-12-14
License Status: Amended
Spud Date: 2019-10-07
Final Drill Date: 2019-10-20
Well Total Depth: 2465.00 m
Surface Hole Latitude: 55.601972
Surface Hole Longitude: -114.962058

For data sources see[1][2]

Well History

Date Event
2018-12-14 Obtained License
2019-10-07 Drill To LD
2019-10-08 Surface Casing Operation Performed
2019-10-09 Direction Drilling Operation Performed - Deviate
2019-10-09 Direction Drilling Operation Performed - Horizontal
2019-10-09 Well Log Performed
2019-10-10 Intermediate Casing Operation Performed
2019-10-12 Well Log Performed
2019-10-20 Finished Drilling
2019-10-20 Perforation Treatment Performed - Open-Hole Completion
2019-10-20 Rig Released
2019-10-20 Well Mode changed to Drilled and Cased
2019-11-17 Well Began Production
2019-11-17 Well Fluid changed to Crude Oil
2019-11-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-07 Stampede Drilling A Division Of Matrix Energy Technologi 12 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-10-09 329.20 Deviate (5 - 79 degrees)
2019-10-09 844.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-20 Open Hole/Barefoot Completion 928.00 2465.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 776 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References