X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0764070113100"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0764070113100
 
| Well ID: 0764070113100
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.571673, -110.95959 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.571673, -110.959590 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 10/13-01-076-07W4/0
 
| Location: 10/13-01-076-07W4/0
Line 43: Line 43:
 
| Surface Hole Latitude: 55.571673
 
| Surface Hole Latitude: 55.571673
 
|-
 
|-
| Surface Hole Longitude: -110.95959
+
| Surface Hole Longitude: -110.959590
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 270: Line 270:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 06:36, 18 January 2021

Well Details

Well ID: 0764070113100
Loading map...
Location: 10/13-01-076-07W4/0
Location Alias: 10/13-01-76-07 W4M
Location Alias 2: 10/13-01-076-07 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 07
Section: 01
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: HARVEST HZ 102 P4A LEISMER 13-1-76-7
Operator Name: Harvest Operations Corp.
License Number: 0444754
License Date: 2012-03-07
License Status: Issued
Spud Date: 2012-03-10
Final Drill Date: 2012-03-26
Well Total Depth: 1520.00 m
Surface Hole Latitude: 55.571673
Surface Hole Longitude: -110.959590

For data sources see[1][2]

Well History

Date Event
2012-03-07 Obtained License
2012-03-10 Direction Drilling Operation Performed - Deviate
2012-03-10 Well Log Performed
2012-03-11 Surface Casing Operation Performed
2012-03-13 Direction Drilling Operation Performed - Horizontal
2012-03-14 Well Log Performed
2012-03-15 Intermediate Casing Operation Performed
2012-03-26 Finished Drilling
2012-03-26 Well Log Performed
2012-03-26 Well Mode changed to Drilled and Cased
2012-03-27 Liner Casing Operation Performed
2012-03-27 Perforation Treatment Performed - Open-Hole Completion
2012-03-27 Perforation Treatment Performed - Slotted Liner or Casing
2012-03-27 Rig Released
2018-06-24 Well Began Production
2018-06-24 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-10 Nabors Drilling Limited 103AC N/A Set Surface
2012-03-25 Nabors Drilling Limited 103 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-10 108.00 Deviate (5 - 79 degrees)
2012-03-13 496.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-27 Slotted Liner 658.00 1516.00 0
2012-03-27 Open Hole/Barefoot Completion 1516.00 1520.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4096 0.0 0.0 0.0
2019 8219 0.0 0.0 0.0
2020 1894 0.0 0.0 0.0

For data sources see[7]

References