X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0764070113100"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0764070113100
 
| Well ID: 0764070113100
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.5608628, -110.9600686 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.571673, -110.959590 | width=100% | height=100% }}
 +
|-
 +
| Location: 10/13-01-076-07W4/0
 +
|-
 +
| Location Alias: 10/13-01-76-07 W4M
 +
|-
 +
| Location Alias 2: 10/13-01-076-07 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 076
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 07
 +
|-
 +
| Section: 01
 +
|-
 +
| County/Municipality: [[Regional Municipality of Wood Buffalo,_Alberta|Regional Municipality of Wood Buffalo]]
 
|-
 
|-
 
| Well Name: HARVEST HZ 102 P4A LEISMER 13-1-76-7
 
| Well Name: HARVEST HZ 102 P4A LEISMER 13-1-76-7
 
|-
 
|-
| Operator:
+
| Operator Name: [[Harvest Operations Corp.]]
 +
|-
 +
| License Number: 0444754
 
|-
 
|-
 
| License Date: 2012-03-07
 
| License Date: 2012-03-07
 
|-
 
|-
| Final Drilling Date: 2012-03-26
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 1520.0m
+
| Spud Date: 2012-03-10
 
|-
 
|-
| Fluid Type: Not Applicable
+
| Final Drill Date: 2012-03-26
 
|-
 
|-
| Status: Drilling and Cased
+
| Well Total Depth: 1520.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 55.571673
 
|-
 
|-
| Configuration: Horizontal
+
| Surface Hole Longitude: -110.959590
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Violations:
+
| 2012-03-07
 +
| Obtained License
 
|-
 
|-
| Latitude: 55.5608628
+
| 2012-03-10
 +
| Direction Drilling Operation Performed - Deviate
 
|-
 
|-
| Longitude: -110.9600686
+
| 2012-03-10
 +
| Well Log Performed
 +
|-
 +
| 2012-03-11
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2012-03-13
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2012-03-14
 +
| Well Log Performed
 +
|-
 +
| 2012-03-15
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 2012-03-26
 +
| Finished Drilling
 +
|-
 +
| 2012-03-26
 +
| Well Log Performed
 +
|-
 +
| 2012-03-26
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2012-03-27
 +
| Liner Casing Operation Performed
 +
|-
 +
| 2012-03-27
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2012-03-27
 +
| Perforation Treatment Performed - Slotted Liner or Casing
 +
|-
 +
| 2012-03-27
 +
| Rig Released
 +
|-
 +
| 2018-06-24
 +
| Well Began Production
 +
|-
 +
| 2018-06-24
 +
| Well Type changed to Steam Assisted Gravity Drain
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
| 2012-03-10
 +
| [[Nabors Drilling Limited]]
 +
| style="text-align: right;" | 103AC
 +
| style="text-align: right;" | N/A
 +
| Set Surface
 +
|-
 +
| 2012-03-25
 +
| [[Nabors Drilling Limited]]
 +
| style="text-align: right;" | 103
 +
| style="text-align: right;" | N/A
 +
| Drill To LD
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =ST49: Daily Spud and Drilling Activity List
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-30
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-09 }}</ref>
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2012-03-10
 +
| style="text-align: right;" | 108.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2012-03-13
 +
| style="text-align: right;" | 496.00
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2012-03-27
 +
| Slotted Liner
 +
| style="text-align: right;" | 658.00
 +
| style="text-align: right;" | 1516.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-03-27
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1516.00
 +
| style="text-align: right;" | 1520.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 4096
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8219
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 1894
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 06:36, 18 January 2021

Well Details

Well ID: 0764070113100
Loading map...
Location: 10/13-01-076-07W4/0
Location Alias: 10/13-01-76-07 W4M
Location Alias 2: 10/13-01-076-07 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 07
Section: 01
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: HARVEST HZ 102 P4A LEISMER 13-1-76-7
Operator Name: Harvest Operations Corp.
License Number: 0444754
License Date: 2012-03-07
License Status: Issued
Spud Date: 2012-03-10
Final Drill Date: 2012-03-26
Well Total Depth: 1520.00 m
Surface Hole Latitude: 55.571673
Surface Hole Longitude: -110.959590

For data sources see[1][2]

Well History

Date Event
2012-03-07 Obtained License
2012-03-10 Direction Drilling Operation Performed - Deviate
2012-03-10 Well Log Performed
2012-03-11 Surface Casing Operation Performed
2012-03-13 Direction Drilling Operation Performed - Horizontal
2012-03-14 Well Log Performed
2012-03-15 Intermediate Casing Operation Performed
2012-03-26 Finished Drilling
2012-03-26 Well Log Performed
2012-03-26 Well Mode changed to Drilled and Cased
2012-03-27 Liner Casing Operation Performed
2012-03-27 Perforation Treatment Performed - Open-Hole Completion
2012-03-27 Perforation Treatment Performed - Slotted Liner or Casing
2012-03-27 Rig Released
2018-06-24 Well Began Production
2018-06-24 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-10 Nabors Drilling Limited 103AC N/A Set Surface
2012-03-25 Nabors Drilling Limited 103 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-10 108.00 Deviate (5 - 79 degrees)
2012-03-13 496.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-27 Slotted Liner 658.00 1516.00 0
2012-03-27 Open Hole/Barefoot Completion 1516.00 1520.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4096 0.0 0.0 0.0
2019 8219 0.0 0.0 0.0
2020 1894 0.0 0.0 0.0

For data sources see[7]

References