If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0764062413020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.596514,"lon":-110.816981,"icon":""}]} |
Location: 02/13-24-076-06W4/0 | |
Location Alias: 02/13-24-76-06 W4M | |
Location Alias 2: 02/13-24-076-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 4 | |
Range: 06 | |
Section: 24 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: CVE FCCL L09P09 HARDY 13-24-76-6 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0474410 | |
License Date: 2015-01-27 | |
License Status: Amended | |
Spud Date: 2015-06-26 | |
Final Drill Date: 2015-08-09 | |
Well Total Depth: 1352.00 m | |
Surface Hole Latitude: 55.596514 | |
Surface Hole Longitude: -110.816981 |
Date | Event |
---|---|
2015-01-27 | Obtained License |
2015-06-26 | Direction Drilling Operation Performed - Deviate |
2015-06-26 | Well Mode changed to Preset |
2015-06-27 | Surface Casing Operation Performed |
2015-07-14 | Direction Drilling Operation Performed - Horizontal |
2015-07-14 | Well Log Performed |
2015-07-15 | Intermediate Casing Operation Performed |
2015-08-09 | Finished Drilling |
2015-08-09 | Perforation Treatment Performed - Open-Hole Completion |
2015-08-09 | Well Log Performed |
2015-08-09 | Well Structure changed to Drain |
2015-08-11 | Rig Released |
2015-09-01 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-07-14 | Akita Drilling Ltd. | 26 | N/A | Resumption |
2015-06-26 | Akita Drilling Ltd. | 26 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-06-26 | 82.60 | Deviate (5 - 79 degrees) |
2015-07-14 | 630.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-08-09 | Open Hole/Barefoot Completion | 706.00 | 1352.00 | 0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-07-15 | No Incident Encountered | 0.00 | 0.00 |
2015-08-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]