X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705112008000

Well Details

Well ID: 0705112008000
Loading map...
Location: 00/08-20-070-11W5/0
Location Alias: 00/08-20-70-11 W5M
Location Alias 2: 00/08-20-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 20
County/Municipality: Big Lakes County
Well Name: ACL HZ SWANH 8-20-70-11
Operator Name: Cardinal Energy Ltd.
License Number: 0437634
License Date: 2011-10-13
License Status: Issued
Spud Date: 2011-11-02
Final Drill Date: 2011-11-21
Well Total Depth: 3529.00 m
Surface Hole Latitude: 55.084681
Surface Hole Longitude: -115.643238

For data sources see[1][2]

Well History

Date Event
2011-10-13 Obtained License
2011-11-04 Surface Casing Operation Performed
2011-11-10 Direction Drilling Operation Performed - Deviate
2011-11-10 Well Log Performed
2011-11-13 Direction Drilling Operation Performed - Horizontal
2011-11-15 Intermediate Casing Operation Performed
2011-11-16 Well Log Performed
2011-11-21 Finished Drilling
2011-11-21 Well Log Performed
2011-11-21 Well Mode changed to Drilled and Cased
2011-11-25 Liner Casing Operation Performed
2011-11-25 Perforation Treatment Performed - Open-Hole Completion
2011-11-26 Rig Released
2011-12-02 Well Log Performed
2011-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-22 Well Began Production
2011-12-22 Well Fluid changed to Crude Oil
2011-12-22 Well Mode changed to Pumping
2012-01-06 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-10 1946.00 Deviate (5 - 79 degrees)
2011-11-13 2425.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-25 Open Hole/Barefoot Completion 3509.00 3529.00 0
2011-12-11 Multi-Stage Fracture 2861.20 2861.30 0
2011-12-11 Multi-Stage Fracture 2875.90 2876.00 0
2011-12-11 Multi-Stage Fracture 3260.90 3261.00 0
2011-12-11 Multi-Stage Fracture 3313.20 3313.30 0
2011-12-11 Multi-Stage Fracture 3327.30 3327.40 0
2011-12-11 Multi-Stage Fracture 3341.90 3342.00 0
2011-12-11 Multi-Stage Fracture 3356.60 3356.70 0
2011-12-11 Multi-Stage Fracture 2542.80 2542.90 0
2011-12-11 Multi-Stage Fracture 2583.90 2584.00 0
2011-12-11 Multi-Stage Fracture 2612.30 2612.40 0
2011-12-11 Multi-Stage Fracture 2641.00 2641.10 0
2011-12-11 Multi-Stage Fracture 2707.80 2707.90 0
2011-12-11 Multi-Stage Fracture 2736.70 2736.80 0
2011-12-11 Multi-Stage Fracture 2765.10 2765.20 0
2011-12-11 Multi-Stage Fracture 2793.70 2793.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 216 0.0 0.0 0.0
2012 7608 0.0 0.0 0.0
2013 8587 0.0 0.0 0.0
2014 804 0.0 0.0 0.0
2015 8191 0.0 0.0 0.0
2016 8078 0.0 0.0 0.0
2017 8717 0.0 0.0 0.0
2018 8545 0.0 0.0 0.0
2019 8484 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[6]

References