X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0686073002002"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0686073002002
 
| Well ID: 0686073002002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.9105421, -119.0526331 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.919175, -119.064045 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/02-30-068-07W6/2
 +
|-
 +
| Location Alias: 00/02-30-68-07 W6M
 +
|-
 +
| Location Alias 2: 00/02-30-068-07 W6/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 068
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 07
 +
|-
 +
| Section: 30
 +
|-
 +
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 
|-
 
|-
 
| Well Name: SDEL HZ WAPITI 2-30-68-7
 
| Well Name: SDEL HZ WAPITI 2-30-68-7
 
|-
 
|-
| Operator:
+
| Operator Name: [[Sinopec Daylight Energy Ltd.]]
 +
|-
 +
| License Number: 0447406
 
|-
 
|-
 
| License Date: 2012-07-26
 
| License Date: 2012-07-26
 
|-
 
|-
| Final Drilling Date: 2012-10-24
+
| License Status: Amended
 +
|-
 +
| Spud Date: 2012-09-15
 +
|-
 +
| Final Drill Date: 2012-10-24
 +
|-
 +
| Well Total Depth: 3814.00 m
 +
|-
 +
| Surface Hole Latitude: 54.919175
 +
|-
 +
| Surface Hole Longitude: -119.064045
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-07-26
 +
| Obtained License
 +
|-
 +
| 2012-09-17
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2012-09-24
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2012-09-28
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 2012-10-12
 +
| Well Log Performed
 +
|-
 +
| 2012-10-13
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2012-10-14
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2012-10-24
 +
| Finished Drilling
 +
|-
 +
| 2012-10-24
 +
| Well Log Performed
 +
|-
 +
| 2012-10-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2012-10-25
 +
| Well Log Performed
 
|-
 
|-
| Total Depth: 3814.0m
+
| 2012-10-26
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Gas
+
| 2012-10-27
 +
| Liner Casing Operation Performed
 
|-
 
|-
| Status: Flowing
+
| 2012-10-28
 +
| Rig Released
 
|-
 
|-
| Well Type: Not Applicable
+
| 2013-07-19
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 
|-
 
|-
| Configuration: Horizontal
+
| 2013-07-19
 +
| Perforation Treatment Performed - Open-Hole Completion
 
|-
 
|-
| Violations:
+
| 2013-08-01
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 
|-
 
|-
| Latitude: 54.9105421
+
| 2013-08-02
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 
|-
 
|-
| Longitude: -119.0526331
+
| 2014-01-04
 +
| Well Began Production
 +
|-
 +
| 2014-01-04
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2014-01-04
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2017-08-15
 +
| Well Log Performed
 +
|-
 +
| 2018-02-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2018-02-01
 +
| Well Mode changed to Pumping
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2012-09-24
 +
| style="text-align: right;" | 2425.30
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2012-10-13
 +
| style="text-align: right;" | 2708.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2012-10-14
 +
| style="text-align: right;" | 2776.10
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2013-07-19
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 3812.30
 +
| style="text-align: right;" | 3814.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-02
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3055.60
 +
| style="text-align: right;" | 3055.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-02
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2957.10
 +
| style="text-align: right;" | 2957.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-02
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2857.70
 +
| style="text-align: right;" | 2857.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-02
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2758.90
 +
| style="text-align: right;" | 2759.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-07-19
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3800.70
 +
| style="text-align: right;" | 3800.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3722.30
 +
| style="text-align: right;" | 3722.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3624.20
 +
| style="text-align: right;" | 3624.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3524.70
 +
| style="text-align: right;" | 3524.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3426.10
 +
| style="text-align: right;" | 3426.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3340.80
 +
| style="text-align: right;" | 3340.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3241.60
 +
| style="text-align: right;" | 3241.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-08-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3142.10
 +
| style="text-align: right;" | 3142.20
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2013-07-19
 +
| 2013-08-02
 +
| style="text-align: right;" | 2,673
 +
| style="text-align: right;" | 7,850
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="21"| 1
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| Water
 +
| Not Available
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 86.109
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Prime Plus (30/50)
 +
| rowspan="1"| Canyon
 +
| rowspan="1"|
 +
| No specific ingredients
 +
| Not Available
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 2.6983
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| Sand (30/50)
 +
| rowspan="4"| Canyon
 +
| rowspan="4"|
 +
| Aluminum Oxide
 +
| 1344-28-1
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 6.7458
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Crystalline silica. quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 6.7458
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Iron Oxide
 +
| 1309-37-1
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 6.7458
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Titanium Oxide
 +
| 13463-67-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 6.7458
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| Sand (40/70)
 +
| rowspan="4"| Canyon
 +
| rowspan="4"|
 +
| Aluminum Oxide
 +
| 1344-28-1
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 3.3729
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Crystalline silica. quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 3.3729
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Iron Oxide
 +
| 1309-37-1
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 3.3729
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Titanium Oxide
 +
| 13463-67-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 3.3729
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| SB Prime (20/40)
 +
| rowspan="2"| Canyon
 +
| rowspan="2"|
 +
| Crystalline silica. quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.6745
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Phenol formaldehyde resin
 +
| 9003-35-4
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.6745
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| Tolcide PS75LT
 +
| rowspan="2"| Canyon
 +
| rowspan="2"| Bactericide/Biocide
 +
| Tetrakis (Hydroxymethyl) Phosphonium Sulfate
 +
| 55566-30-8
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0259
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0259
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| CAN-1912 Clay Stabilizer (HT)
 +
| rowspan="1"| Canyon
 +
| rowspan="1"| Clay Control
 +
| No hazardous ingredients
 +
| Not Available
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.1882
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| CAN-2056 Gellant (G50 Microtox EC50)
 +
| rowspan="3"| Canyon
 +
| rowspan="3"| Gelling Agent
 +
| Ammonium Chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0927
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Hydrotreated Kerosene
 +
| 64742-47-8
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0927
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0927
 +
| style="text-align: right;" | N/A
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| CAN-2400 Surface Tension Reducer
 +
| rowspan="3"| Canyon
 +
| rowspan="3"| Surfactant
 +
| Citrus Terpenes
 +
| 94266-47-4
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0923
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Isopropanol
 +
| 67-63-0
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0923
 +
| style="text-align: right;" | N/A
 +
|-
 +
| Triethylene Glycol
 +
| 112-27-6
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0923
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Hydraulic Fracturing Water Use Data (Annual)
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-05-05
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-10 }}</ref>
 +
== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
| 2013-07-26
 +
| 2013-08-01
 +
| Surface Water - Runoff
 +
| style="text-align: right;" | 10632
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Hydraulic Fracturing Water Source Data (Annual)
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-12-31
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-10}}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 3629
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 7743
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 683
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 820
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 1323
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 5264
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 1678
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-10-28
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2013-08-22
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2016-12-23
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 11:56, 19 January 2021

Well Details

Well ID: 0686073002002
Loading map...
Location: 00/02-30-068-07W6/2
Location Alias: 00/02-30-68-07 W6M
Location Alias 2: 00/02-30-068-07 W6/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 07
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: SDEL HZ WAPITI 2-30-68-7
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0447406
License Date: 2012-07-26
License Status: Amended
Spud Date: 2012-09-15
Final Drill Date: 2012-10-24
Well Total Depth: 3814.00 m
Surface Hole Latitude: 54.919175
Surface Hole Longitude: -119.064045

For data sources see[1][2]

Well History

Date Event
2012-07-26 Obtained License
2012-09-17 Surface Casing Operation Performed
2012-09-24 Direction Drilling Operation Performed - Deviate
2012-09-28 Intermediate Casing Operation Performed
2012-10-12 Well Log Performed
2012-10-13 Direction Drilling Operation Performed - Deviate
2012-10-14 Direction Drilling Operation Performed - Horizontal
2012-10-24 Finished Drilling
2012-10-24 Well Log Performed
2012-10-24 Well Mode changed to Drilled and Cased
2012-10-25 Well Log Performed
2012-10-26 Well Log Performed
2012-10-27 Liner Casing Operation Performed
2012-10-28 Rig Released
2013-07-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-07-19 Perforation Treatment Performed - Open-Hole Completion
2013-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-04 Well Began Production
2014-01-04 Well Fluid changed to Gas
2014-01-04 Well Mode changed to Flowing
2017-08-15 Well Log Performed
2018-02-01 Well Fluid changed to Gas
2018-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-09-24 2425.30 Deviate (5 - 79 degrees)
2012-10-13 2708.00 Deviate (5 - 79 degrees)
2012-10-14 2776.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-07-19 Open Hole/Barefoot Completion 3812.30 3814.00 0
2013-08-02 Multi-Stage Fracture 3055.60 3055.70 0
2013-08-02 Multi-Stage Fracture 2957.10 2957.20 0
2013-08-02 Multi-Stage Fracture 2857.70 2857.80 0
2013-08-02 Multi-Stage Fracture 2758.90 2759.00 0
2013-07-19 Multi-Stage Fracture 3800.70 3800.80 0
2013-08-01 Multi-Stage Fracture 3722.30 3722.40 0
2013-08-01 Multi-Stage Fracture 3624.20 3624.30 0
2013-08-01 Multi-Stage Fracture 3524.70 3524.80 0
2013-08-01 Multi-Stage Fracture 3426.10 3426.20 0
2013-08-01 Multi-Stage Fracture 3340.80 3340.90 0
2013-08-01 Multi-Stage Fracture 3241.60 3241.70 0
2013-08-01 Multi-Stage Fracture 3142.10 3142.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-19 2013-08-02 2,673 7,850 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.109 N/A
Prime Plus (30/50) Canyon No specific ingredients Not Available 100 2.6983 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 6.7458 N/A
Crystalline silica. quartz 14808-60-7 100 6.7458 N/A
Iron Oxide 1309-37-1 100 6.7458 N/A
Titanium Oxide 13463-67-7 100 6.7458 N/A
Sand (40/70) Canyon Aluminum Oxide 1344-28-1 100 3.3729 N/A
Crystalline silica. quartz 14808-60-7 100 3.3729 N/A
Iron Oxide 1309-37-1 100 3.3729 N/A
Titanium Oxide 13463-67-7 100 3.3729 N/A
SB Prime (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 0.6745 N/A
Phenol formaldehyde resin 9003-35-4 100 0.6745 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0259 N/A
Water 7732-18-5 100 0.0259 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.1882 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0927 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0927 N/A
Water 7732-18-5 100 0.0927 N/A
CAN-2400 Surface Tension Reducer Canyon Surfactant Citrus Terpenes 94266-47-4 100 0.0923 N/A
Isopropanol 67-63-0 100 0.0923 N/A
Triethylene Glycol 112-27-6 100 0.0923 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-07-26 2013-08-01 Surface Water - Runoff 10632

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3629 0.0 0.0 0.0
2015 7743 0.0 0.0 0.0
2016 683 0.0 0.0 0.0
2017 820 0.0 0.0 0.0
2018 1323 0.0 0.0 0.0
2019 5264 0.0 0.0 0.0
2020 1678 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-28 No Incident Encountered 0.00 0.00
2013-08-22 No Incident Encountered 0.00 0.00
2016-12-23 No Incident Encountered 0.00 0.00

For data sources see[9]

References