X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684040306020

Well Details

Well ID: 0684040306020
Loading map...
Location: 02/06-03-068-04W4/0
Location Alias: 02/06-03-68-04 W4M
Location Alias 2: 02/06-03-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 03
County/Municipality: Improvement District No. 349
Well Name: CNRL 8A31 PRIMROSE 6-3-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0301747
License Date: 2004-01-15
License Status: Issued
Spud Date: 2004-03-13
Final Drill Date: 2004-07-21
Well Total Depth: 2234.00 m
Surface Hole Latitude: 54.850426
Surface Hole Longitude: -110.506568

For data sources see[1][2]

Well History

Date Event
2004-01-15 Obtained License
2004-03-13 Surface Casing Operation Performed
2004-06-05 Direction Drilling Operation Performed - Horizontal
2004-06-06 Well Log Performed
2004-06-08 Intermediate Casing Operation Performed
2004-07-21 Finished Drilling
2004-07-21 Well Log Performed
2004-07-21 Well Mode changed to Drilled and Cased
2004-07-22 Well Log Performed
2004-07-23 Liner Casing Operation Performed
2004-07-23 Perforation Treatment Performed - Open-Hole Completion
2004-07-23 Perforation Treatment Performed - Slotted Liner or Casing
2004-07-23 Rig Released
2005-07-05 Well Began Production
2005-07-05 Well Fluid changed to Crude Bitumen
2005-07-05 Well Type changed to Cyclical
2013-09-26 Perforation Treatment Performed - Jet Perforation
2018-10-01 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-06-05 165.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-07-23 Slotted Liner 963.00 2219.00 0
2013-09-26 Perforation 1032.50 1033.50 6
2013-09-26 Perforation 964.60 965.60 6
2004-07-23 Open Hole/Barefoot Completion 2219.00 2234.00 0
2013-09-26 Perforation 1508.40 1509.40 6
2013-09-26 Perforation 1454.20 1455.20 6
2013-09-26 Perforation 1400.10 1401.10 6
2013-09-26 Perforation 1346.70 1347.60 6
2013-09-26 Perforation 1292.30 1293.30 6
2013-09-26 Perforation 1237.70 1238.70 6
2013-09-26 Perforation 1169.40 1170.40 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 3149 0.0 0.0 0.0
2006 7177 0.0 0.0 0.0
2007 6584 0.0 0.0 0.0
2008 8630 0.0 0.0 0.0
2009 8136 0.0 0.0 0.0
2010 5239 0.0 0.0 0.0
2011 8543 0.0 0.0 0.0
2012 8450 0.0 0.0 0.0
2013 8338 0.0 0.0 0.0
2014 8321 0.0 0.0 0.0
2015 8122 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 7022 0.0 0.0 0.0
2018 4208 0.0 0.0 0.0
2019 5638 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-05-03 No Incident Encountered 0.00 0.00
2013-09-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References