If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635101412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.454988,"lon":-115.385297,"icon":""}]} |
Location: 00/12-14-063-10W5/0 | |
Location Alias: 00/12-14-63-10 W5M | |
Location Alias 2: 00/12-14-063-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 10 | |
Section: 14 | |
County/Municipality: Woodlands County | |
Well Name: CPEC JUDYCK 12-14-63-10 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0421233 | |
License Date: 2010-06-17 | |
License Status: Suspension | |
Spud Date: 2010-11-06 | |
Final Drill Date: 2010-11-20 | |
Well Total Depth: 2855.00 m | |
Surface Hole Latitude: 54.454988 | |
Surface Hole Longitude: -115.385297 |
Date | Event |
---|---|
2010-06-17 | Obtained License |
2010-11-07 | Surface Casing Operation Performed |
2010-11-08 | Well Log Performed |
2010-11-09 | Direction Drilling Operation Performed - Horizontal |
2010-11-14 | Intermediate Casing Operation Performed |
2010-11-20 | Finished Drilling |
2010-11-20 | Well Mode changed to Drilled and Cased |
2010-11-21 | Liner Casing Operation Performed |
2010-11-22 | Rig Released |
2010-11-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-29 | Perforation Treatment Performed - Open-Hole Completion |
2010-11-30 | Well Log Performed |
2011-03-07 | Well Began Production |
2011-03-07 | Well Fluid changed to Crude Oil |
2011-03-07 | Well Mode changed to Pumping |
2019-03-01 | Well Fluid changed to Crude Oil |
2019-03-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-09 | 1195.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-29 | Multi-Stage Fracture | 1889.00 | 1889.10 | 0 |
2010-11-29 | Multi-Stage Fracture | 2804.00 | 2804.10 | 0 |
2010-11-29 | Open Hole/Barefoot Completion | 2841.50 | 2855.00 | 0 |
2010-11-29 | Multi-Stage Fracture | 1985.60 | 1985.70 | 0 |
2010-11-29 | Multi-Stage Fracture | 2083.70 | 2083.80 | 0 |
2010-11-29 | Multi-Stage Fracture | 2180.30 | 2180.40 | 0 |
2010-11-29 | Multi-Stage Fracture | 2286.80 | 2286.90 | 0 |
2010-11-29 | Multi-Stage Fracture | 2392.40 | 2392.50 | 0 |
2010-11-29 | Multi-Stage Fracture | 2496.50 | 2496.60 | 0 |
2010-11-29 | Multi-Stage Fracture | 2599.20 | 2599.30 | 0 |
2010-11-29 | Multi-Stage Fracture | 2701.50 | 2701.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5424 | 0.0 | 0.0 | 0.0 |
2012 | 5768 | 0.0 | 0.0 | 0.0 |
2013 | 7780 | 0.0 | 0.0 | 0.0 |
2014 | 7904 | 0.0 | 0.0 | 0.0 |
2015 | 8511 | 0.0 | 0.0 | 0.0 |
2016 | 6290 | 0.0 | 0.0 | 0.0 |
For data sources see[6]