If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0626050209003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.338845,"lon":-118.63309,"icon":""}]} |
Location: 00/09-02-062-05W6/3 | |
Location Alias: 00/09-02-62-05 W6M | |
Location Alias 2: 00/09-02-062-05 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 6 | |
Range: 05 | |
Section: 02 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG KAKWA 9-2-62-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0373769 | |
License Date: 2007-02-06 | |
License Status: Issued | |
Spud Date: 2007-02-22 | |
Final Drill Date: 2007-03-16 | |
Well Total Depth: 3206.00 m | |
Surface Hole Latitude: 54.338845 | |
Surface Hole Longitude: -118.633090 |
Date | Event |
---|---|
2007-02-06 | Obtained License |
2007-02-25 | Surface Casing Operation Performed |
2007-02-26 | Direction Drilling Operation Performed - Deviate |
2007-03-03 | Direction Drilling Operation Performed - Sidetrack Fish |
2007-03-09 | Intermediate Casing Operation Performed |
2007-03-09 | Well Log Performed |
2007-03-16 | Finished Drilling |
2007-03-16 | Well Mode changed to Drilled and Cased |
2007-03-17 | Well Log Performed |
2007-03-18 | Production Casing Operation Performed |
2007-03-19 | Rig Released |
2007-03-25 | Well Log Performed |
2007-03-28 | Perforation Treatment Performed - Jet Perforation |
2007-03-28 | Well Log Performed |
2007-03-29 | Perforation Treatment Performed - Fractured |
2007-03-31 | Perforation Treatment Performed - Jet Perforation |
2007-03-31 | Well Log Performed |
2007-04-02 | Perforation Treatment Performed - Fractured |
2007-04-03 | Perforation Treatment Performed - Jet Perforation |
2007-04-03 | Well Log Performed |
2007-04-04 | Perforation Treatment Performed - Fractured |
2007-04-04 | Well Fluid changed to Gas |
2007-04-04 | Well Mode changed to Testing |
2007-04-06 | Perforation Treatment Performed - Jet Perforation |
2007-04-06 | Well Log Performed |
2007-04-07 | Perforation Treatment Performed - Fractured |
2007-04-09 | Perforation Treatment Performed - Jet Perforation |
2007-04-09 | Well Log Performed |
2007-04-11 | Well Log Performed |
2007-04-13 | Perforation Treatment Performed - Fractured |
2007-04-16 | Perforation Treatment Performed - Jet Perforation |
2007-04-17 | Perforation Treatment Performed - Fractured |
2007-04-19 | Perforation Treatment Performed - Jet Perforation |
2007-04-19 | Well Log Performed |
2007-04-24 | Perforation Treatment Performed - Fractured |
2007-04-29 | Well Log Performed |
2007-05-13 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-02-26 | 431.50 | Deviate (5 - 79 degrees) |
2007-03-03 | 970.00 | Sidetrack fish |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-03-28 | Perforation | 3156.00 | 3157.00 | 10 |
2007-04-04 | Fracture | 2995.00 | 2995.50 | 0 |
2007-04-04 | Fracture | 2958.50 | 2959.00 | 0 |
2007-04-06 | Perforation | 2898.00 | 2898.50 | 10 |
2007-04-06 | Perforation | 2887.50 | 2888.00 | 10 |
2007-04-06 | Perforation | 2884.00 | 2885.00 | 10 |
2007-04-06 | Perforation | 2877.50 | 2878.50 | 10 |
2007-04-06 | Perforation | 2872.00 | 2873.00 | 10 |
2007-04-07 | Fracture | 2872.00 | 2898.50 | 0 |
2007-04-09 | Perforation | 2738.00 | 2740.00 | 10 |
2007-04-13 | Fracture | 2738.00 | 2740.00 | 0 |
2007-03-28 | Perforation | 3146.00 | 3147.00 | 10 |
2007-04-16 | Perforation | 2537.00 | 2537.50 | 10 |
2007-04-16 | Perforation | 2535.00 | 2535.50 | 10 |
2007-04-16 | Perforation | 2520.50 | 2521.00 | 10 |
2007-04-16 | Perforation | 2517.50 | 2518.00 | 10 |
2007-04-16 | Perforation | 2501.50 | 2502.00 | 10 |
2007-04-16 | Perforation | 2494.50 | 2495.00 | 10 |
2007-04-17 | Fracture | 2494.50 | 2537.50 | 0 |
2007-04-19 | Perforation | 2040.00 | 2042.00 | 10 |
2007-04-19 | Perforation | 2035.00 | 2035.50 | 10 |
2007-04-24 | Fracture | 2035.00 | 2042.00 | 0 |
2007-03-29 | Fracture | 3146.00 | 3157.00 | 0 |
2007-03-31 | Perforation | 3076.00 | 3077.00 | 10 |
2007-04-02 | Fracture | 3076.00 | 3077.00 | 0 |
2007-04-03 | Perforation | 3007.50 | 3008.00 | 10 |
2007-04-03 | Perforation | 2995.00 | 2995.50 | 10 |
2007-04-03 | Perforation | 2958.50 | 2959.00 | 10 |
2007-04-04 | Fracture | 3007.50 | 3008.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 3 | 0.0 | 0.0 | 0.0 |
For data sources see[6]