X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0625201304000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0625201304000
 
| Well ID: 0625201304000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.357787, -116.873852 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.357787, -116.873852 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/04-13-062-20W5/0
 
| Location: 00/04-13-062-20W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/04-13-062-20 W5/00
 
| Location Alias 2: 00/04-13-062-20 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 062
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 13
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
Line 17: Line 27:
 
| Well Name: ACL KAYBOBS 4-13-62-20
 
| Well Name: ACL KAYBOBS 4-13-62-20
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Paramount Resources Ltd.]]
 
|-
 
|-
 
| License Number: 0050817
 
| License Number: 0050817
Line 29: Line 39:
 
| Final Drill Date: 1974-09-12
 
| Final Drill Date: 1974-09-12
 
|-
 
|-
| Well Total Depth: 2139.7 m
+
| Well Total Depth: 2139.70 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.357787
 
| Surface Hole Latitude: 54.357787
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1974-08-13
 +
| Obtained License
 +
|-
 +
| 1974-09-12
 +
| Finished Drilling
 +
|-
 +
| 1974-09-12
 +
| Well Log Performed
 +
|-
 +
| 1974-09-13
 +
| Production Casing Operation Performed
 +
|-
 +
| 1974-09-14
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1975-07-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1975-07-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-08-06
 +
| Well Began Injection
 +
|-
 +
| 1975-08-06
 +
| Well Fluid changed to Water
 +
|-
 +
| 1975-08-06
 +
| Well Type changed to Injection
 +
|-
 +
| 1977-07-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1986-07-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1986-07-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-07-04
 +
| Well Log Performed
 +
|-
 +
| 1989-05-20
 +
| Well Log Performed
 +
|-
 +
| 1995-07-31
 +
| Well Log Performed
 +
|-
 +
| 1995-08-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1995-08-11
 +
| Plug Back Performed
 +
|-
 +
| 1995-08-11
 +
| Well Fluid changed to Water
 +
|-
 +
| 1995-08-11
 +
| Well Log Performed
 +
|-
 +
| 1995-08-11
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1995-08-11
 +
| Well Type changed to Injection
 +
|-
 +
| 1995-08-12
 +
| Well Log Performed
 +
|-
 +
| 1995-08-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1995-08-13
 +
| Plug Back Performed
 +
|-
 +
| 1995-08-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-08-23
 +
| Well Log Performed
 +
|-
 +
| 1995-12-15
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 183:
 
| 1975-07-11
 
| 1975-07-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2106.2
+
| style="text-align: right;" | 2106.20
| style="text-align: right;" | 2108
+
| style="text-align: right;" | 2108.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 +
|-
 +
| 1995-08-23
 +
| Perforation
 +
| style="text-align: right;" | 1991.00
 +
| style="text-align: right;" | 1995.80
 +
| style="text-align: right;" | 20
 +
|-
 +
| 1995-12-15
 +
| Fracture
 +
| style="text-align: right;" | 1991.00
 +
| style="text-align: right;" | 2008.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1975-07-11
 
| 1975-07-11
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2106.2
+
| style="text-align: right;" | 2106.20
| style="text-align: right;" | 2108
+
| style="text-align: right;" | 2108.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1977-07-07
 
| 1977-07-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2106.2
+
| style="text-align: right;" | 2106.20
| style="text-align: right;" | 2108
+
| style="text-align: right;" | 2108.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1986-07-04
 
| 1986-07-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2112.9
+
| style="text-align: right;" | 2112.90
| style="text-align: right;" | 2117.8
+
| style="text-align: right;" | 2117.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1986-07-04
 
| 1986-07-04
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2106.2
+
| style="text-align: right;" | 2106.20
| style="text-align: right;" | 2117.8
+
| style="text-align: right;" | 2117.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995-08-11
 
| 1995-08-11
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2071.6
+
| style="text-align: right;" | 2071.60
| style="text-align: right;" | 2083.6
+
| style="text-align: right;" | 2083.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995-08-13
 
| 1995-08-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2053.9
+
| style="text-align: right;" | 2053.90
| style="text-align: right;" | 2061.9
+
| style="text-align: right;" | 2061.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1995-08-23
 
| 1995-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2005
+
| style="text-align: right;" | 2005.00
| style="text-align: right;" | 2008.5
+
| style="text-align: right;" | 2008.50
| style="text-align: right;" | 20
 
|-
 
| 1995-08-23
 
| Perforation
 
| style="text-align: right;" | 1995.8
 
| style="text-align: right;" | 2000
 
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 1995-08-23
 
| 1995-08-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1991
+
| style="text-align: right;" | 1995.80
| style="text-align: right;" | 1995.8
+
| style="text-align: right;" | 2000.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
|-
 
| 1995-12-15
 
| Fracture
 
| style="text-align: right;" | 1991
 
| style="text-align: right;" | 2008.5
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 142: Line 251:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 177: Line 300:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 10838.1
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1976
 
| 1976
Line 183: Line 306:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 27126.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1977
 
| 1977
Line 189: Line 312:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 60693.7
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1978
 
| 1978
Line 195: Line 318:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 38378.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1979
 
| 1979
Line 201: Line 324:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 28416.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1980
 
| 1980
Line 207: Line 330:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 71477.4
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1981
 
| 1981
Line 213: Line 336:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 71937.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1982
 
| 1982
Line 219: Line 342:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 10494.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1983
 
| 1983
Line 225: Line 348:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 56018.7
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1984
 
| 1984
Line 231: Line 354:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 91508.3
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1985
 
| 1985
Line 237: Line 360:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 84823.1
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1986
 
| 1986
Line 243: Line 366:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 81552.3
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1987
 
| 1987
Line 249: Line 372:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 127002.5
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1988
 
| 1988
Line 255: Line 378:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 96888.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1989
 
| 1989
Line 261: Line 384:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 100075.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1990
 
| 1990
Line 267: Line 390:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 130990.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1991
 
| 1991
Line 273: Line 396:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 107894.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1992
 
| 1992
Line 279: Line 402:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 44573.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1993
 
| 1993
Line 285: Line 408:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 61288.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1994
 
| 1994
Line 291: Line 414:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 14705.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 297: Line 420:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 312: Line 435:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 19:19, 17 January 2021

Well Details

Well ID: 0625201304000
Loading map...
Location: 00/04-13-062-20W5/0
Location Alias: 00/04-13-62-20 W5M
Location Alias 2: 00/04-13-062-20 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 20
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL KAYBOBS 4-13-62-20
Operator Name: Paramount Resources Ltd.
License Number: 0050817
License Date: 1974-08-13
License Status: Issued
Spud Date: 1974-08-31
Final Drill Date: 1974-09-12
Well Total Depth: 2139.70 m
Surface Hole Latitude: 54.357787
Surface Hole Longitude: -116.873852

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-08-13 Obtained License
1974-09-12 Finished Drilling
1974-09-12 Well Log Performed
1974-09-13 Production Casing Operation Performed
1974-09-14 Well Mode changed to Drilled and Cased
1975-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-11 Perforation Treatment Performed - Jet Perforation
1975-08-06 Well Began Injection
1975-08-06 Well Fluid changed to Water
1975-08-06 Well Type changed to Injection
1977-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-04 Perforation Treatment Performed - Jet Perforation
1986-07-04 Well Log Performed
1989-05-20 Well Log Performed
1995-07-31 Well Log Performed
1995-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-11 Plug Back Performed
1995-08-11 Well Fluid changed to Water
1995-08-11 Well Log Performed
1995-08-11 Well Mode changed to Abandoned Zone
1995-08-11 Well Type changed to Injection
1995-08-12 Well Log Performed
1995-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-13 Plug Back Performed
1995-08-23 Perforation Treatment Performed - Jet Perforation
1995-08-23 Well Log Performed
1995-12-15 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-11 Perforation 2106.20 2108.00 7
1995-08-23 Perforation 1991.00 1995.80 20
1995-12-15 Fracture 1991.00 2008.50 0
1975-07-11 Acid Treatment 2106.20 2108.00 0
1977-07-07 Acid Treatment 2106.20 2108.00 0
1986-07-04 Perforation 2112.90 2117.80 13
1986-07-04 Acid Treatment 2106.20 2117.80 0
1995-08-11 Packing Device Capped w/Cement 2071.60 2083.60 0
1995-08-13 Packing Device Capped w/Cement 2053.90 2061.90 0
1995-08-23 Perforation 2005.00 2008.50 20
1995-08-23 Perforation 1995.80 2000.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References