X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0624170507002"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0624170507002
 
| Well ID: 0624170507002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.33226899999999659, -112.50743399999998928 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.332269, -112.507434 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-05-062-17W4/2
 
| Location: 00/07-05-062-17W4/2
 +
|-
 +
| Location Alias: 00/07-05-62-17 W4M
 +
|-
 +
| Location Alias 2: 00/07-05-062-17 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 062
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 17
 +
|-
 +
| Section: 05
 +
|-
 +
| County/Municipality: [[Smoky Lake County,_Alberta|Smoky Lake County]]
 
|-
 
|-
 
| Well Name: ACL FIGURE LAKE 7-5-62-17
 
| Well Name: ACL FIGURE LAKE 7-5-62-17
 +
|-
 +
| Operator Name: [[Paramount Resources Ltd.]]
 +
|-
 +
| License Number: 0132409
 
|-
 
|-
 
| License Date: 1988-02-19
 
| License Date: 1988-02-19
 
|-
 
|-
| Final Drilling Date: 1988-02-23
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1988-02-21
 +
|-
 +
| Final Drill Date: 1988-02-23
 +
|-
 +
| Well Total Depth: 691.30 m
 +
|-
 +
| Surface Hole Latitude: 54.332269
 +
|-
 +
| Surface Hole Longitude: -112.507434
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1988-02-19
 +
| Obtained License
 +
|-
 +
| 1988-02-21
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1988-02-23
 +
| Drill Stem Test Performed
 +
|-
 +
| 1988-02-23
 +
| Finished Drilling
 +
|-
 +
| 1988-02-23
 +
| Well Log Performed
 +
|-
 +
| 1988-02-24
 +
| Drill Stem Test Performed
 +
|-
 +
| 1988-02-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 1988-02-25
 +
| Rig Released
 +
|-
 +
| 1988-03-03
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1989-06-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1989-07-08
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1992-09-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1992-09-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-09-12
 +
| Plug Back Performed
 +
|-
 +
| 1992-09-12
 +
| Well Abandoned
 +
|-
 +
| 1992-09-12
 +
| Well Mode changed to Abandoned
 
|-
 
|-
| Total Depth: 691.3m
+
| 1992-09-14
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1992-09-14
 +
| Plug Back Performed
 
|-
 
|-
| Status: Abandoned
+
| 1992-09-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Well Type: Not Applicable
+
| 1992-09-16
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Configuration: Vertical
+
| 1992-09-16
 +
| Plug Back Performed
 
|-
 
|-
| Latitude: 54.33226899999999659
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Longitude: -112.50743399999998928
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1988-03-03
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 689.50
 +
| style="text-align: right;" | 691.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1989-06-16
 +
| Perforation
 +
| style="text-align: right;" | 607.00
 +
| style="text-align: right;" | 610.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1989-07-08
 +
| Fracture
 +
| style="text-align: right;" | 607.00
 +
| style="text-align: right;" | 610.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1992-09-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 666.00
 +
| style="text-align: right;" | 674.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1992-09-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 593.00
 +
| style="text-align: right;" | 601.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1992-09-12
 +
| Perforation
 +
| style="text-align: right;" | 562.50
 +
| style="text-align: right;" | 565.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1992-09-14
 +
| Cement Squeeze
 +
| style="text-align: right;" | 562.50
 +
| style="text-align: right;" | 565.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1992-09-16
 +
| Perforation
 +
| style="text-align: right;" | 562.50
 +
| style="text-align: right;" | 564.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1992-09-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 547.00
 +
| style="text-align: right;" | 555.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 17:04, 17 January 2021

Well Details

Well ID: 0624170507002
Loading map...
Location: 00/07-05-062-17W4/2
Location Alias: 00/07-05-62-17 W4M
Location Alias 2: 00/07-05-062-17 W4/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 17
Section: 05
County/Municipality: Smoky Lake County
Well Name: ACL FIGURE LAKE 7-5-62-17
Operator Name: Paramount Resources Ltd.
License Number: 0132409
License Date: 1988-02-19
License Status: Abandoned
Spud Date: 1988-02-21
Final Drill Date: 1988-02-23
Well Total Depth: 691.30 m
Surface Hole Latitude: 54.332269
Surface Hole Longitude: -112.507434

For data sources see[1][2]

Well History

Date Event
1988-02-19 Obtained License
1988-02-21 Surface Casing Operation Performed
1988-02-23 Drill Stem Test Performed
1988-02-23 Finished Drilling
1988-02-23 Well Log Performed
1988-02-24 Drill Stem Test Performed
1988-02-25 Production Casing Operation Performed
1988-02-25 Rig Released
1988-03-03 Perforation Treatment Performed - Open-Hole Completion
1989-06-16 Perforation Treatment Performed - Jet Perforation
1989-07-08 Perforation Treatment Performed - Fractured
1992-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-12 Perforation Treatment Performed - Jet Perforation
1992-09-12 Plug Back Performed
1992-09-12 Well Abandoned
1992-09-12 Well Mode changed to Abandoned
1992-09-14 Perforation Treatment Performed - Cement Squeeze
1992-09-14 Plug Back Performed
1992-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-16 Perforation Treatment Performed - Jet Perforation
1992-09-16 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-03 Open Hole/Barefoot Completion 689.50 691.30 0
1989-06-16 Perforation 607.00 610.00 13
1989-07-08 Fracture 607.00 610.00 0
1992-09-12 Packing Device Capped w/Cement 666.00 674.00 0
1992-09-12 Packing Device Capped w/Cement 593.00 601.00 0
1992-09-12 Perforation 562.50 565.00 13
1992-09-14 Cement Squeeze 562.50 565.00 0
1992-09-16 Perforation 562.50 564.00 13
1992-09-16 Packing Device Capped w/Cement 547.00 555.00 0

For data sources see[4]



References