If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0606042804000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.199074,"lon":-118.540184,"icon":""}]} |
Location: 00/04-28-060-04W6/0 | |
Location Alias: 00/04-28-60-04 W6M | |
Location Alias 2: 00/04-28-060-04 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 6 | |
Range: 04 | |
Section: 28 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: STRATH SMOKY 4-28-60-4 | |
Operator Name: Strath Resources Ltd. | |
License Number: 0413429 | |
License Date: 2009-10-27 | |
License Status: Issued | |
Spud Date: 2010-01-10 | |
Final Drill Date: 2010-02-13 | |
Well Total Depth: 4031.00 m | |
Surface Hole Latitude: 54.199074 | |
Surface Hole Longitude: -118.540184 |
Date | Event |
---|---|
2009-10-27 | Obtained License |
2010-01-15 | Surface Casing Operation Performed |
2010-02-01 | Direction Drilling Operation Performed - Horizontal |
2010-02-03 | Intermediate Casing Operation Performed |
2010-02-13 | Finished Drilling |
2010-02-13 | Well Mode changed to Drilled and Cased |
2010-02-14 | Well Log Performed |
2010-02-18 | Liner Casing Operation Performed |
2010-02-18 | Perforation Treatment Performed - Open-Hole Completion |
2010-02-19 | Rig Released |
2010-07-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-07-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-07-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-07-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-07-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-07-21 | Well Began Production |
2010-07-21 | Well Fluid changed to Gas |
2010-07-21 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-01 | 2723.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-18 | Open Hole/Barefoot Completion | 4026.00 | 4031.00 | 0 |
2010-07-10 | Multi-Stage Fracture | 3444.40 | 3445.20 | 0 |
2010-07-12 | Multi-Stage Fracture | 3371.60 | 3372.40 | 0 |
2010-07-12 | Multi-Stage Fracture | 3299.50 | 3300.30 | 0 |
2010-07-12 | Multi-Stage Fracture | 3240.40 | 3241.20 | 0 |
2010-07-12 | Multi-Stage Fracture | 3181.20 | 3182.00 | 0 |
2010-07-12 | Multi-Stage Fracture | 3136.50 | 3137.30 | 0 |
2010-07-12 | Multi-Stage Fracture | 3050.30 | 3051.10 | 0 |
2010-07-13 | Multi-Stage Fracture | 2964.40 | 2965.20 | 0 |
2010-07-13 | Multi-Stage Fracture | 2878.40 | 2879.20 | 0 |
2010-07-13 | Multi-Stage Fracture | 2806.20 | 2807.00 | 0 |
2010-07-09 | Multi-Stage Fracture | 4016.80 | 4017.60 | 0 |
2010-07-18 | Multi-Stage Fracture | 2730.00 | 2735.00 | 0 |
2010-07-09 | Multi-Stage Fracture | 3977.80 | 3978.60 | 0 |
2010-07-09 | Multi-Stage Fracture | 3918.70 | 3919.50 | 0 |
2010-07-09 | Multi-Stage Fracture | 3847.20 | 3848.00 | 0 |
2010-07-09 | Multi-Stage Fracture | 3760.90 | 3761.70 | 0 |
2010-07-09 | Multi-Stage Fracture | 3688.30 | 3689.10 | 0 |
2010-07-10 | Multi-Stage Fracture | 3601.90 | 3602.70 | 0 |
2010-07-10 | Multi-Stage Fracture | 3529.50 | 3530.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2309 | 0.0 | 0.0 | 0.0 |
2011 | 7601 | 0.0 | 0.0 | 0.0 |
2012 | 7554 | 0.0 | 0.0 | 0.0 |
2013 | 7461 | 0.0 | 0.0 | 0.0 |
2014 | 4787 | 0.0 | 0.0 | 0.0 |
2015 | 6690 | 0.0 | 0.0 | 0.0 |
2016 | 5431 | 0.0 | 0.0 | 0.0 |
2017 | 4193 | 0.0 | 0.0 | 0.0 |
2018 | 5560 | 0.0 | 0.0 | 0.0 |
2019 | 8133 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]