X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605180605000

Well Details

Well ID: 0605180605000
Loading map...
Location: 00/05-06-060-18W5/0
Location Alias: 00/05-06-60-18 W5M
Location Alias 2: 00/05-06-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 5-6-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0443549
License Date: 2012-01-31
License Status: Issued
Spud Date: 2012-02-19
Final Drill Date: 2012-03-07
Well Total Depth: 3520.00 m
Surface Hole Latitude: 54.167953
Surface Hole Longitude: -116.684538

For data sources see[1][2]

Well History

Date Event
2012-01-31 Obtained License
2012-02-21 Surface Casing Operation Performed
2012-02-23 Direction Drilling Operation Performed - Deviate
2012-02-27 Direction Drilling Operation Performed - Horizontal
2012-02-27 Well Log Performed
2012-02-28 Production Casing Operation Performed
2012-03-07 Finished Drilling
2012-03-07 Well Log Performed
2012-03-07 Well Mode changed to Drilled and Cased
2012-03-09 Liner Casing Operation Performed
2012-03-09 Perforation Treatment Performed - Open-Hole Completion
2012-03-10 Rig Released
2012-03-15 Well Log Performed
2012-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-20 Well Fluid changed to Gas
2012-03-20 Well Mode changed to Testing
2012-04-10 Well Began Production
2012-04-10 Well Fluid changed to Gas
2012-04-10 Well Mode changed to Flowing
2014-02-14 Well Fluid changed to Gas
2014-02-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-19 Precision Drilling Corporation 430 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-23 1506.10 Deviate (5 - 79 degrees)
2012-02-27 2293.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-09 Open Hole/Barefoot Completion 3510.00 3520.00 0
2012-03-19 Multi-Stage Fracture 2645.90 2647.50 0
2012-03-19 Multi-Stage Fracture 2526.80 2528.40 0
2012-03-19 Multi-Stage Fracture 2421.50 2423.10 0
2012-03-19 Multi-Stage Fracture 2331.00 2332.60 0
2012-03-19 Multi-Stage Fracture 3504.90 3505.80 0
2012-03-19 Multi-Stage Fracture 3415.80 3417.40 0
2012-03-19 Multi-Stage Fracture 3309.00 3310.60 0
2012-03-19 Multi-Stage Fracture 3202.70 3204.30 0
2012-03-19 Multi-Stage Fracture 3095.70 3097.30 0
2012-03-19 Multi-Stage Fracture 2989.90 2991.50 0
2012-03-19 Multi-Stage Fracture 2884.20 2885.80 0
2012-03-19 Multi-Stage Fracture 2765.80 2767.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6006 0.0 0.0 0.0
2013 6343 0.0 0.0 0.0
2014 4751 0.0 0.0 0.0
2015 7913 0.0 0.0 0.0
2016 8189 0.0 0.0 0.0
2017 7273 0.0 0.0 0.0
2018 7024 0.0 0.0 0.0
2019 6716 0.0 0.0 0.0
2020 2010 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-19 No Incident Encountered 0.00 0.00

For data sources see[8]

References