X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0595233514002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0595233514002
 
| Well ID: 0595233514002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.149011, -117.34478 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.149011, -117.344780 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/14-35-059-23W5/2
 
| Location: 00/14-35-059-23W5/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/14-35-059-23 W5/02
 
| Location Alias 2: 00/14-35-059-23 W5/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 059
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 23
 +
|-
 +
| Section: 35
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
Line 17: Line 27:
 
| Well Name: TALISMAN ET AL BERLR 14-35-59-23
 
| Well Name: TALISMAN ET AL BERLR 14-35-59-23
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Repsol Oil & Gas Canada Inc.]]
 
|-
 
|-
 
| License Number: 0169636
 
| License Number: 0169636
Line 29: Line 39:
 
| Final Drill Date: 1994-10-22
 
| Final Drill Date: 1994-10-22
 
|-
 
|-
| Well Total Depth: 2275 m
+
| Well Total Depth: 2275.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.149011
 
| Surface Hole Latitude: 54.149011
 
|-
 
|-
| Surface Hole Longitude: -117.34478
+
| Surface Hole Longitude: -117.344780
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1994-08-18
 +
| Obtained License
 +
|-
 +
| 1994-10-12
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1994-10-22
 +
| Finished Drilling
 +
|-
 +
| 1994-10-22
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1994-10-23
 +
| Well Log Performed
 +
|-
 +
| 1994-10-24
 +
| Drill Stem Test Performed
 +
|-
 +
| 1994-10-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 1994-10-26
 +
| Rig Released
 +
|-
 +
| 1994-11-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-11-06
 +
| Well Log Performed
 +
|-
 +
| 1994-11-10
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1994-12-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1994-12-10
 +
| Well Log Performed
 +
|-
 +
| 1994-12-15
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-12-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-12-05
 +
| Plug Back Performed
 +
|-
 +
| 2006-12-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-12-11
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2018-02-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2018-02-20
 +
| Plug Back Performed
 +
|-
 +
| 2018-02-20
 +
| Well Log Performed
 +
|-
 +
| 2018-02-20
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 162:
 
| 1994-11-06
 
| 1994-11-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2233.5
+
| style="text-align: right;" | 2233.50
| style="text-align: right;" | 2240
+
| style="text-align: right;" | 2240.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 +
|-
 +
| 2018-02-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1902.00
 +
| style="text-align: right;" | 1910.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-11-10
 
| 1994-11-10
| Fracture  
+
| Fracture
| style="text-align: right;" | 2233.5
+
| style="text-align: right;" | 2233.50
| style="text-align: right;" | 2240
+
| style="text-align: right;" | 2240.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1994-12-10
 
| 1994-12-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2222.8
+
| style="text-align: right;" | 2222.80
| style="text-align: right;" | 2226
+
| style="text-align: right;" | 2226.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-12-15
 
| 1994-12-15
| Fracture  
+
| Fracture
| style="text-align: right;" | 2222.8
+
| style="text-align: right;" | 2222.80
| style="text-align: right;" | 2226
+
| style="text-align: right;" | 2226.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-12-05
 
| 2006-12-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2205
+
| style="text-align: right;" | 2205.00
| style="text-align: right;" | 2213
+
| style="text-align: right;" | 2213.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-12-07
 
| 2006-12-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1925
+
| style="text-align: right;" | 1925.00
| style="text-align: right;" | 1927
+
| style="text-align: right;" | 1927.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2006-12-07
 
| 2006-12-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1920
+
| style="text-align: right;" | 1920.00
| style="text-align: right;" | 1922
+
| style="text-align: right;" | 1922.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2006-12-11
 
| 2006-12-11
| Fracture  
+
| Fracture
| style="text-align: right;" | 1925
+
| style="text-align: right;" | 1925.00
| style="text-align: right;" | 1927
+
| style="text-align: right;" | 1927.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-12-11
 
| 2006-12-11
| Fracture  
+
| Fracture
| style="text-align: right;" | 1920
+
| style="text-align: right;" | 1920.00
| style="text-align: right;" | 1922
+
| style="text-align: right;" | 1922.00
| style="text-align: right;" | 0
 
|-
 
| 2018-02-20
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1902
 
| style="text-align: right;" | 1910
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 136: Line 224:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 177: Line 279:
 
|-
 
|-
 
| 2018-02-20
 
| 2018-02-20
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 185: Line 287:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:00, 19 January 2021

Well Details

Well ID: 0595233514002
Loading map...
Location: 00/14-35-059-23W5/2
Location Alias: 00/14-35-59-23 W5M
Location Alias 2: 00/14-35-059-23 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 23
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL BERLR 14-35-59-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0169636
License Date: 1994-08-18
License Status: Suspension
Spud Date: 1994-10-11
Final Drill Date: 1994-10-22
Well Total Depth: 2275.00 m
Surface Hole Latitude: 54.149011
Surface Hole Longitude: -117.344780

For data sources see[1][2]

Well History

Date Event
1994-08-18 Obtained License
1994-10-12 Surface Casing Operation Performed
1994-10-22 Finished Drilling
1994-10-22 Well Mode changed to Drilled and Cased
1994-10-23 Well Log Performed
1994-10-24 Drill Stem Test Performed
1994-10-25 Production Casing Operation Performed
1994-10-26 Rig Released
1994-11-06 Perforation Treatment Performed - Jet Perforation
1994-11-06 Well Log Performed
1994-11-10 Perforation Treatment Performed - Fractured
1994-12-10 Perforation Treatment Performed - Jet Perforation
1994-12-10 Well Log Performed
1994-12-15 Perforation Treatment Performed - Fractured
2006-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-05 Plug Back Performed
2006-12-07 Perforation Treatment Performed - Jet Perforation
2006-12-11 Perforation Treatment Performed - Fractured
2018-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-20 Plug Back Performed
2018-02-20 Well Log Performed
2018-02-20 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-06 Perforation 2233.50 2240.00 14
2018-02-20 Packing Device Capped w/Cement 1902.00 1910.00 0
1994-11-10 Fracture 2233.50 2240.00 0
1994-12-10 Perforation 2222.80 2226.00 13
1994-12-15 Fracture 2222.80 2226.00 0
2006-12-05 Packing Device Capped w/Cement 2205.00 2213.00 0
2006-12-07 Perforation 1925.00 1927.00 20
2006-12-07 Perforation 1920.00 1922.00 20
2006-12-11 Fracture 1925.00 1927.00 0
2006-12-11 Fracture 1920.00 1922.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-20 No Incident Encountered 0.00 0.00

For data sources see[5]

References