If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595222604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.153243,"lon":-117.199269,"icon":""}]} |
Location: 00/04-26-059-22W5/0 | |
Location Alias: 00/04-26-59-22 W5M | |
Location Alias 2: 00/04-26-059-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 22 | |
Section: 26 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CELTIC HZ FIR 4-26-59-22 | |
Operator Name: XTO Energy Canada ULC | |
License Number: 0446626 | |
License Date: 2012-06-19 | |
License Status: Issued | |
Spud Date: 2012-07-21 | |
Final Drill Date: 2012-08-15 | |
Well Total Depth: 5086.00 m | |
Surface Hole Latitude: 54.153243 | |
Surface Hole Longitude: -117.199269 |
Date | Event |
---|---|
2012-06-19 | Obtained License |
2012-07-24 | Surface Casing Operation Performed |
2012-07-28 | Well Log Performed |
2012-07-29 | Direction Drilling Operation Performed - Deviate |
2012-08-01 | Production Casing Operation Performed |
2012-08-02 | Direction Drilling Operation Performed - Horizontal |
2012-08-15 | Finished Drilling |
2012-08-15 | Well Mode changed to Drilled and Cased |
2012-08-16 | Well Log Performed |
2012-08-18 | Liner Casing Operation Performed |
2012-08-18 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-19 | Rig Released |
2012-08-24 | Well Fluid changed to Crude Oil |
2012-08-24 | Well Mode changed to Potential |
2012-08-29 | Well Log Performed |
2012-09-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-02 | Well Began Production |
2012-09-02 | Well Fluid changed to Crude Oil |
2012-09-02 | Well Mode changed to Flowing |
2015-04-06 | Well Fluid changed to Crude Oil |
2015-04-06 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-21 | Excalibur Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-29 | 1871.60 | Deviate (5 - 79 degrees) |
2012-08-02 | 2269.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-18 | Open Hole/Barefoot Completion | 5081.00 | 5086.00 | 0 |
2012-09-01 | Multi-Stage Fracture | 3954.70 | 3955.50 | 0 |
2012-09-01 | Multi-Stage Fracture | 3800.70 | 3801.50 | 0 |
2012-09-01 | Multi-Stage Fracture | 3673.80 | 3674.20 | 0 |
2012-09-01 | Multi-Stage Fracture | 3546.90 | 3547.70 | 0 |
2012-09-02 | Multi-Stage Fracture | 3406.40 | 3407.20 | 0 |
2012-09-02 | Multi-Stage Fracture | 3279.30 | 3280.10 | 0 |
2012-09-02 | Multi-Stage Fracture | 3139.80 | 3140.60 | 0 |
2012-09-02 | Multi-Stage Fracture | 3012.90 | 3013.70 | 0 |
2012-09-02 | Multi-Stage Fracture | 2872.40 | 2873.20 | 0 |
2012-09-02 | Multi-Stage Fracture | 2731.90 | 2732.70 | 0 |
2012-09-01 | Multi-Stage Fracture | 5057.50 | 5058.90 | 0 |
2012-09-02 | Multi-Stage Fracture | 2606.10 | 2606.90 | 0 |
2012-09-02 | Multi-Stage Fracture | 2479.30 | 2480.10 | 0 |
2012-09-02 | Multi-Stage Fracture | 2352.40 | 2353.20 | 0 |
2012-09-02 | Multi-Stage Fracture | 2279.60 | 2280.40 | 0 |
2012-09-01 | Multi-Stage Fracture | 4969.10 | 4969.90 | 0 |
2012-09-01 | Multi-Stage Fracture | 4743.00 | 4743.80 | 0 |
2012-09-01 | Multi-Stage Fracture | 4616.30 | 4617.10 | 0 |
2012-09-01 | Multi-Stage Fracture | 4489.40 | 4490.20 | 0 |
2012-09-01 | Multi-Stage Fracture | 4349.00 | 4349.80 | 0 |
2012-09-01 | Multi-Stage Fracture | 4208.50 | 4209.30 | 0 |
2012-09-01 | Multi-Stage Fracture | 4081.60 | 4082.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1878 | 0.0 | 0.0 | 0.0 |
2013 | 7096 | 0.0 | 0.0 | 0.0 |
2014 | 4979 | 0.0 | 0.0 | 0.0 |
2015 | 7285 | 0.0 | 0.0 | 0.0 |
2016 | 7508 | 0.0 | 0.0 | 0.0 |
2017 | 6447 | 0.0 | 0.0 | 0.0 |
2018 | 7284 | 0.0 | 0.0 | 0.0 |
2019 | 7835 | 0.0 | 0.0 | 0.0 |
2020 | 1836 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]