X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0595210805000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0595210805000
 
| Well ID: 0595210805000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.08700800000002573, -117.12000799999998435 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.087008, -117.120008 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/05-08-059-21W5/0
 
| Location: 00/05-08-059-21W5/0
 +
|-
 +
| Location Alias: 00/05-08-59-21 W5M
 +
|-
 +
| Location Alias 2: 00/05-08-059-21 W5/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 
|-
 
|-
 
| Well Name: TALISMAN ET AL FIR 5-8-59-21
 
| Well Name: TALISMAN ET AL FIR 5-8-59-21
 +
|-
 +
| Operator Name: [[Repsol Oil & Gas Canada Inc.]]
 +
|-
 +
| License Number: 0379449
 
|-
 
|-
 
| License Date: 2007-07-18
 
| License Date: 2007-07-18
 
|-
 
|-
| Final Drilling Date: 2007-10-09
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2007-09-30
 +
|-
 +
| Final Drill Date: 2007-10-09
 +
|-
 +
| Well Total Depth: 2686 m
 +
|-
 +
| Surface Hole Latitude: 54.087008
 +
|-
 +
| Surface Hole Longitude: -117.120008
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2007-10-04
 +
| style="text-align: right;" | 1590
 +
 
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2007-11-24
 +
| Perforation
 +
| style="text-align: right;" | 2652
 +
| style="text-align: right;" | 2656
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2007-11-26
 +
| Fracture
 +
| style="text-align: right;" | 2652
 +
| style="text-align: right;" | 2656
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 2686.0m
+
| 2007-12-01
 +
| Perforation
 +
| style="text-align: right;" | 2616.5
 +
| style="text-align: right;" | 2619
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Fluid Type: Gas
+
| 2007-12-01
 +
| Perforation
 +
| style="text-align: right;" | 2613
 +
| style="text-align: right;" | 2615
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Status: Pumping
+
| 2007-12-01
 +
| Perforation
 +
| style="text-align: right;" | 2611
 +
| style="text-align: right;" | 2612
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Well Type: Not Applicable
+
| 2007-12-02
 +
| Fracture
 +
| style="text-align: right;" | 2616.5
 +
| style="text-align: right;" | 2619
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2007-12-02
 +
| Fracture
 +
| style="text-align: right;" | 2613
 +
| style="text-align: right;" | 2615
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 54.08700800000002573
+
| 2007-12-02
 +
| Fracture
 +
| style="text-align: right;" | 2611
 +
| style="text-align: right;" | 2612
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -117.12000799999998435
+
| 2007-12-05
 +
| Perforation
 +
| style="text-align: right;" | 2429
 +
| style="text-align: right;" | 2433
 +
| style="text-align: right;" | 17
 
|-
 
|-
 +
| 2007-12-06
 +
| Fracture
 +
| style="text-align: right;" | 2429
 +
| style="text-align: right;" | 2433
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2008
 +
| style="text-align: right;" | 8639
 +
| style="text-align: right;" | 5476.6
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 131.8
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 7079
 +
| style="text-align: right;" | 2522.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 71.7
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8639
 +
| style="text-align: right;" | 2634.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 60.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 8641
 +
| style="text-align: right;" | 2125.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 54.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 8757
 +
| style="text-align: right;" | 1821.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 64.3
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8591
 +
| style="text-align: right;" | 1745.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 63.5
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8244
 +
| style="text-align: right;" | 1567.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 62.9
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8575
 +
| style="text-align: right;" | 1522.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 40.9
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8161
 +
| style="text-align: right;" | 1378.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 23.4
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8423
 +
| style="text-align: right;" | 1259.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 48.7
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 7945
 +
| style="text-align: right;" | 1265.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 61.4
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 1663
 +
| style="text-align: right;" | 280.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 15.6
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 02:59, 10 June 2019

Well Details

Well ID: 0595210805000
Loading map...
Location: 00/05-08-059-21W5/0
Location Alias: 00/05-08-59-21 W5M
Location Alias 2: 00/05-08-059-21 W5/00
Province: Alberta
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL FIR 5-8-59-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0379449
License Date: 2007-07-18
License Status: Issued
Spud Date: 2007-09-30
Final Drill Date: 2007-10-09
Well Total Depth: 2686 m
Surface Hole Latitude: 54.087008
Surface Hole Longitude: -117.120008

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
2007-10-04 1590

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-11-24 Perforation 2652 2656 17
2007-11-26 Fracture 2652 2656 0
2007-12-01 Perforation 2616.5 2619 17
2007-12-01 Perforation 2613 2615 17
2007-12-01 Perforation 2611 2612 17
2007-12-02 Fracture 2616.5 2619 0
2007-12-02 Fracture 2613 2615 0
2007-12-02 Fracture 2611 2612 0
2007-12-05 Perforation 2429 2433 17
2007-12-06 Fracture 2429 2433 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 8639 5476.6 0.0 131.8
2009 7079 2522.5 0.0 71.7
2010 8639 2634.8 0.0 60.0
2011 8641 2125.8 0.0 54.0
2012 8757 1821.1 0.0 64.3
2013 8591 1745.2 0.0 63.5
2014 8244 1567.5 0.0 62.9
2015 8575 1522.4 0.0 40.9
2016 8161 1378.1 0.0 23.4
2017 8423 1259.9 0.0 48.7
2018 7945 1265.0 0.0 61.4
2019 1663 280.9 0.0 15.6

For data sources see[5]

References