X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595202614000

Well Details

Well ID: 0595202614000
Loading map...
Location: 00/14-26-059-20W5/0
Location Alias: 00/14-26-59-20 W5M
Location Alias 2: 00/14-26-059-20 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 20
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 14-26-59-20
Operator Name: Paramount Resources Ltd.
License Number: 0422184
License Date: 2010-07-27
License Status: Issued
Spud Date: 2010-10-08
Final Drill Date: 2010-11-02
Well Total Depth: 4176.00 m
Surface Hole Latitude: 54.122268
Surface Hole Longitude: -116.896952

For data sources see[1][2]

Well History

Date Event
2010-07-27 Obtained License
2010-10-11 Surface Casing Operation Performed
2010-10-21 Well Log Performed
2010-10-22 Intermediate Casing Operation Performed
2010-10-23 Direction Drilling Operation Performed - Horizontal
2010-11-02 Finished Drilling
2010-11-02 Well Mode changed to Drilled and Cased
2010-11-07 Well Log Performed
2010-11-09 Liner Casing Operation Performed
2010-11-10 Rig Released
2010-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-29 Perforation Treatment Performed - Open-Hole Completion
2010-12-03 Well Log Performed
2010-12-19 Well Log Performed
2010-12-23 Well Began Production
2010-12-23 Well Fluid changed to Gas
2010-12-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-23 2645.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-29 Open Hole/Barefoot Completion 4172.00 4176.00 0
2010-11-29 Multi-Stage Fracture 3588.40 3664.40 0
2010-11-29 Multi-Stage Fracture 3524.00 3588.30 0
2010-11-29 Multi-Stage Fracture 3448.20 3523.90 0
2010-11-29 Multi-Stage Fracture 3373.00 3448.10 0
2010-11-29 Multi-Stage Fracture 3297.10 3372.90 0
2010-11-29 Multi-Stage Fracture 3221.30 3297.00 0
2010-11-29 Multi-Stage Fracture 3145.80 3221.20 0
2010-11-29 Multi-Stage Fracture 3070.30 3145.70 0
2010-11-29 Multi-Stage Fracture 2995.20 3070.20 0
2010-11-29 Multi-Stage Fracture 2931.70 2995.10 0
2010-11-29 Multi-Stage Fracture 4162.70 4172.00 0
2010-11-29 Multi-Stage Fracture 2856.40 2931.60 0
2010-11-29 Multi-Stage Fracture 2780.50 2856.30 0
2010-11-29 Multi-Stage Fracture 2705.00 2780.40 0
2010-11-29 Multi-Stage Fracture 2641.10 2704.90 0
2010-11-29 Multi-Stage Fracture 4107.80 4162.60 0
2010-11-29 Multi-Stage Fracture 4031.70 4107.70 0
2010-11-29 Multi-Stage Fracture 3967.50 4031.60 0
2010-11-29 Multi-Stage Fracture 3892.00 3967.40 0
2010-11-29 Multi-Stage Fracture 3816.10 3891.90 0
2010-11-29 Multi-Stage Fracture 3740.60 3816.00 0
2010-11-29 Multi-Stage Fracture 3664.50 3740.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 197 0.0 0.0 0.0
2011 8064 0.0 0.0 0.0
2012 8327 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 6336 0.0 0.0 0.0
2015 7943 0.0 0.0 0.0
2016 8040 0.0 0.0 0.0
2017 7512 0.0 0.0 0.0
2018 8135 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 1992 0.0 0.0 0.0

For data sources see[6]

References