If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 279: | Line 279: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0595191001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.082536,"lon":-116.756545,"icon":""}]} |
Location: 00/01-10-059-19W5/0 | |
Location Alias: 00/01-10-59-19 W5M | |
Location Alias 2: 00/01-10-059-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 19 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: POCO ET AL KAYBOBS 1-10-59-19 | |
Operator Name: ConocoPhillips Canada Operations ULC | |
License Number: 0180995 | |
License Date: 1995-09-26 | |
License Status: RecCertified | |
Spud Date: 1995-09-30 | |
Final Drill Date: 1995-10-08 | |
Well Total Depth: 1735.00 m | |
Surface Hole Latitude: 54.082536 | |
Surface Hole Longitude: -116.756545 |
Date | Event |
---|---|
1995-09-26 | Obtained License |
1995-10-01 | Surface Casing Operation Performed |
1995-10-08 | Finished Drilling |
1995-10-08 | Well Log Performed |
1995-10-08 | Well Mode changed to Drilled and Cased |
1995-10-09 | Production Casing Operation Performed |
1995-10-09 | Rig Released |
1995-11-19 | Perforation Treatment Performed - Jet Perforation |
1995-11-19 | Well Began Production |
1995-11-19 | Well Fluid changed to Crude Oil |
1995-11-19 | Well Log Performed |
1995-11-19 | Well Mode changed to Pumping |
1997-06-09 | Perforation Treatment Performed - Chemical Squeeze |
2001-06-19 | Well Fluid changed to Crude Oil |
2001-06-19 | Well Mode changed to Abandoned Zone |
2001-06-21 | Well Fluid changed to Crude Oil |
2001-06-21 | Well Mode changed to Abandoned |
2002-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-19 | Plug Back Performed |
2002-06-19 | Well Log Performed |
2002-06-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-11-19 | Perforation | 1672.00 | 1687.50 | 17 |
1997-06-09 | Chemical Squeeze | 1672.00 | 1687.50 | 0 |
2002-06-19 | Packing Device Capped w/Cement | 1655.00 | 1663.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 824 | 0.0 | 0.0 | 0.0 |
1996 | 4498 | 0.0 | 0.0 | 0.0 |
1997 | 2367 | 0.0 | 0.0 | 0.0 |
1998 | 1348 | 0.0 | 0.0 | 0.0 |
1999 | 1415 | 0.0 | 0.0 | 0.0 |
2000 | 3741 | 0.0 | 0.0 | 0.0 |
For data sources see[5]