X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595182807000

Well Details

Well ID: 0595182807000
Loading map...
Location: 00/07-28-059-18W5/0
Location Alias: 00/07-28-59-18 W5M
Location Alias 2: 00/07-28-059-18 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 18
Section: 28
County/Municipality: Woodlands County
Well Name: TRILOGY BHLU 3 KAYBOBS 7-28-59-18
Operator Name: Paramount Resources Ltd.
License Number: 0158019
License Date: 1993-04-29
License Status: Suspension
Spud Date: 1993-05-06
Final Drill Date: 1993-05-30
Well Total Depth: 3322.00 m
Surface Hole Latitude: 54.131013
Surface Hole Longitude: -116.631101

For data sources see[1][2]

Well History

Date Event
1993-04-29 Obtained License
1993-05-07 Lost Circulation Occurred
1993-05-09 Surface Casing Operation Performed
1993-05-20 Direction Drilling Operation Performed - Deviate
1993-05-30 Finished Drilling
1993-05-30 Well Log Performed
1993-05-30 Well Mode changed to Drilled and Cased
1993-06-02 Production Casing Operation Performed
1993-06-03 Rig Released
1993-06-27 Well Log Performed
1993-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-29 Perforation Treatment Performed - Jet Perforation
1993-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-07 Well Began Production
1993-07-07 Well Fluid changed to Gas
1993-07-07 Well Mode changed to Flowing
2006-09-16 Well Fluid changed to Gas
2006-09-16 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-05-20 2554.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-28 Packing Device Capped w/Cement 3316.00 3317.00 0
1993-06-29 Perforation 3284.00 3288.00 17
1993-06-29 Perforation 3292.00 3296.00 17
1993-06-29 Perforation 3300.00 3303.00 17
1993-06-29 Perforation 3310.00 3314.00 17
1993-06-30 Acid Treatment 3284.00 3314.00 0
1993-07-02 Acid Treatment 3284.00 3314.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 4261 0.0 0.0 0.0
1994 8235 0.0 0.0 0.0
1995 8397 0.0 0.0 0.0
1996 7521 0.0 0.0 0.0
1997 8328 0.0 0.0 0.0
1998 8440 0.0 0.0 0.0
1999 8711 0.0 0.0 0.0
2000 7907 0.0 0.0 0.0
2001 8014 0.0 0.0 0.0
2002 6519 0.0 0.0 0.0
2003 4329 0.0 0.0 0.0
2004 152 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-05-07 Lost Circulation 43.00 459.00

For data sources see[7]

References