If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0586012401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.022264,"lon":-118.001899,"icon":""}]} |
Location: 00/01-24-058-01W6/0 | |
Location Alias: 00/01-24-58-01 W6M | |
Location Alias 2: 00/01-24-058-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 6 | |
Range: 01 | |
Section: 24 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HORSE 1-24-58-1 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0426595 | |
License Date: 2010-11-29 | |
License Status: Issued | |
Spud Date: 2011-02-10 | |
Final Drill Date: 2011-03-02 | |
Well Total Depth: 3430.00 m | |
Surface Hole Latitude: 54.022264 | |
Surface Hole Longitude: -118.001899 |
Date | Event |
---|---|
2010-11-29 | Obtained License |
2011-02-10 | Lost Circulation Occurred |
2011-02-13 | Surface Casing Operation Performed |
2011-03-02 | Finished Drilling |
2011-03-02 | Well Mode changed to Drilled and Cased |
2011-03-03 | Well Log Performed |
2011-03-04 | Production Casing Operation Performed |
2011-03-04 | Well Log Performed |
2011-03-05 | Rig Released |
2011-03-10 | Well Log Performed |
2011-03-12 | Perforation Treatment Performed - Jet Perforation |
2011-03-12 | Well Log Performed |
2011-03-18 | Perforation Treatment Performed - Fractured |
2011-03-18 | Perforation Treatment Performed - Jet Perforation |
2011-03-18 | Well Log Performed |
2011-03-19 | Perforation Treatment Performed - Fractured |
2011-03-19 | Perforation Treatment Performed - Jet Perforation |
2011-03-19 | Well Log Performed |
2011-03-20 | Perforation Treatment Performed - Fractured |
2011-03-20 | Perforation Treatment Performed - Jet Perforation |
2011-03-20 | Well Log Performed |
2011-03-21 | Perforation Treatment Performed - Fractured |
2011-03-21 | Perforation Treatment Performed - Jet Perforation |
2011-03-21 | Well Log Performed |
2011-03-22 | Perforation Treatment Performed - Fractured |
2011-03-22 | Perforation Treatment Performed - Jet Perforation |
2011-08-19 | Well Began Production |
2011-08-19 | Well Fluid changed to Gas |
2011-08-19 | Well Mode changed to Flowing |
2012-11-04 | Well Fluid changed to Gas |
2012-11-04 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-12 | Perforation | 3415.50 | 3416.50 | 6 |
2011-03-19 | Perforation | 3189.00 | 3190.00 | 6 |
2011-03-19 | Perforation | 3141.00 | 3142.00 | 6 |
2011-03-20 | Fracture | 3141.00 | 3245.50 | 0 |
2011-03-20 | Perforation | 3105.00 | 3106.00 | 6 |
2011-03-20 | Perforation | 3095.00 | 3096.00 | 6 |
2011-03-20 | Perforation | 3074.00 | 3075.00 | 6 |
2011-03-20 | Perforation | 2996.00 | 2997.00 | 9 |
2011-03-21 | Fracture | 2996.00 | 3106.00 | 0 |
2011-03-21 | Perforation | 2831.50 | 2832.50 | 6 |
2011-03-21 | Perforation | 2798.00 | 2799.00 | 6 |
2011-03-12 | Perforation | 3397.00 | 3398.00 | 9 |
2011-03-22 | Fracture | 2798.00 | 2832.50 | 0 |
2011-03-22 | Perforation | 2402.00 | 2403.00 | 6 |
2011-03-22 | Perforation | 2359.00 | 2360.00 | 6 |
2011-03-22 | Perforation | 2289.00 | 2290.00 | 6 |
2011-03-22 | Fracture | 2289.00 | 2403.00 | 0 |
2011-03-18 | Fracture | 3397.00 | 3416.50 | 0 |
2011-03-18 | Perforation | 3369.50 | 3370.50 | 12 |
2011-03-18 | Perforation | 3331.00 | 3332.00 | 6 |
2011-03-18 | Perforation | 3287.00 | 3288.00 | 9 |
2011-03-19 | Fracture | 3287.00 | 3370.50 | 0 |
2011-03-19 | Perforation | 3244.50 | 3245.50 | 9 |
2011-03-19 | Perforation | 3214.00 | 3215.00 | 6 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3246 | 0.0 | 0.0 | 0.0 |
2012 | 8647 | 0.0 | 0.0 | 0.0 |
2013 | 8021 | 0.0 | 0.0 | 0.0 |
2014 | 7762 | 0.0 | 0.0 | 0.0 |
2015 | 7987 | 0.0 | 0.0 | 0.0 |
2016 | 6847 | 0.0 | 0.0 | 0.0 |
2017 | 7199 | 0.0 | 0.0 | 0.0 |
2018 | 8536 | 0.0 | 0.0 | 0.0 |
2019 | 7888 | 0.0 | 0.0 | 0.0 |
2020 | 636 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-02-10 | Lost Circulation | 122.00 | 140.00 |
For data sources see[6]