X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565082307000

Well Details

Well ID: 0565082307000
Loading map...
Location: 00/07-23-056-08W5/0
Location Alias: 00/07-23-56-08 W5M
Location Alias 2: 00/07-23-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 23
County/Municipality: Lac Ste. Anne County
Well Name: RICHLAND ET AL PADDLER 7-23-56-8
Operator Name: Pembina NGL Corporation
License Number: 0013791
License Date: 1957-08-09
License Status: RecCertified
Spud Date: 1957-08-21
Final Drill Date: 1957-09-19
Well Total Depth: 1630.70 m
Surface Hole Latitude: 53.851498
Surface Hole Longitude: -115.077236

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-08-09 Obtained License
1957-08-26 Drill Stem Test Performed
1957-09-02 Drill Stem Test Performed
1957-09-19 Drill Stem Test Performed
1957-09-19 Finished Drilling
1957-09-21 Production Casing Operation Performed
1958-05-02 Well Mode changed to Drilled and Cased
1958-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-03 Perforation Treatment Performed - Bullet Perforation
1958-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-07 Perforation Treatment Performed - Jet Perforation
1958-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-14 Perforation Treatment Performed - Cement Squeeze
1958-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-05-15 Perforation Treatment Performed - Jet Perforation
1961-05-18 Perforation Treatment Performed - Fractured
1961-08-28 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-11 Perforation Treatment Performed - Fractured
1997-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-04 Plug Back Performed
1997-10-05 Perforation Treatment Performed - Jet Perforation
1997-10-05 Perforation Treatment Performed - Remedial Casing
1997-10-07 Well Mode changed to Abandoned
1997-10-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-05-03 Bullet Perforation 1558.70 1560.60 13
1961-08-28 Hydra Jet Perforation 1531.60 1531.60 0
1961-08-28 Acid Treatment 1529.50 1531.90 0
1961-09-11 Acid Treatment 1529.50 1531.90 0
1961-09-11 Fracture 1529.50 1531.90 0
1997-10-04 Packing Device Capped w/Cement 1508.00 1516.00 0
1997-10-05 Perforation 212.00 212.30 13
1997-10-05 Remedial Casing Cementing 212.00 212.30 0
1958-05-03 Acid Treatment 1558.70 1560.60 0
1958-05-05 Acid Treatment 1558.70 1560.60 0
1958-05-07 Perforation 1530.10 1535.60 13
1958-05-08 Acid Treatment 1530.10 1535.60 0
1958-05-14 Cement Squeeze 1530.10 1535.60 0
1958-05-15 Perforation 1529.50 1531.90 13
1958-05-15 Packing Device Capped w/Cement 1548.70 1548.70 0
1961-05-18 Fracture 1529.50 1531.90 0

For data sources see[4]



References