X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565052414000

Well Details

Well ID: 0565052414000
Loading map...
Location: 00/14-24-056-05W5/0
Location Alias: 00/14-24-56-05 W5M
Location Alias 2: 00/14-24-056-05 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 05
Section: 24
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 14-24-56-5
Operator Name: Journey Energy Inc.
License Number: 0030979
License Date: 1966-09-14
License Status: Issued
Spud Date: 1966-10-01
Final Drill Date: 1966-10-11
Well Total Depth: 1360.90 m
Surface Hole Latitude: 53.858823
Surface Hole Longitude: -114.612395

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-14 Obtained License
1966-10-07 Drill Stem Test Performed
1966-10-09 Drill Stem Test Performed
1966-10-10 Drill Stem Test Performed
1966-10-11 Finished Drilling
1966-10-11 Well Mode changed to Drilled and Cased
1966-10-12 Production Casing Operation Performed
1966-10-26 Perforation Treatment Performed - Jet Perforation
1966-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-27 Perforation Treatment Performed - Acid Wash - No Pressure
1966-10-28 Well Began Production
1966-10-28 Well Fluid changed to Crude Oil
1966-10-28 Well Mode changed to Flowing
1966-11-01 Perforation Treatment Performed - Jet Perforation
1966-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-19 Perforation Treatment Performed - Cement Squeeze
1967-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-24 Perforation Treatment Performed - Cement Squeeze
1967-08-25 Perforation Treatment Performed - Cement Squeeze
1967-08-28 Perforation Treatment Performed - Jet Perforation
1967-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-31 Perforation Treatment Performed - Jet Perforation
1967-09-03 Perforation Treatment Performed - Jet Perforation
1967-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-02-09 Well Fluid changed to Crude Oil
1968-02-09 Well Mode changed to Suspended
1975-10-01 Well Began Injection
1975-10-01 Well Fluid changed to Gas
1975-10-01 Well Type changed to Injection
1977-07-06 Well Fluid changed to Water
1977-07-06 Well Type changed to Injection
1977-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-22 Perforation Treatment Performed - Jet Perforation
1977-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-17 Perforation Treatment Performed - Cement Squeeze
1980-01-21 Perforation Treatment Performed - Jet Perforation
1980-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-24 Perforation Treatment Performed - Cement Squeeze
1982-07-23 Perforation Treatment Performed - Cement Squeeze
1982-07-24 Perforation Treatment Performed - Cement Squeeze
1982-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-29 Perforation Treatment Performed - Jet Perforation
1982-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-18 Well Log Performed
1988-05-19 Well Log Performed
1988-05-30 Well Log Performed
1988-05-31 Perforation Treatment Performed - Jet Perforation
1988-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-02 Well Log Performed
1988-06-06 Perforation Treatment Performed - Cement Squeeze
1988-06-09 Well Log Performed
1988-06-10 Perforation Treatment Performed - Jet Perforation
1988-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-11 Well Log Performed
1992-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-08-11 Perforation Treatment Performed - Jet Perforation
2013-08-11 Well Log Performed
2013-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-26 Perforation 1318.60 1324.70 13
1967-08-25 Cement Squeeze 1308.80 1315.80 0
1967-08-28 Perforation 1321.90 1323.70 7
1967-08-29 Acid Treatment 1321.90 1323.70 0
1967-08-31 Perforation 1313.40 1314.30 0
1967-09-03 Perforation 1308.80 1310.30 7
1967-09-04 Acid Treatment 1308.80 1310.30 0
1967-09-08 Packing Device Capped w/Cement 1312.50 1312.50 0
1977-09-09 Acid Treatment 1308.80 1310.30 0
1977-12-22 Perforation 1303.00 1304.20 13
1977-12-22 Perforation 1311.60 1313.40 13
1966-10-27 Acid Wash 1318.60 1324.70 0
1977-12-22 Perforation 1320.70 1322.50 13
1977-12-22 Perforation 1324.40 1325.00 13
1977-12-22 Perforation 1330.50 1332.30 13
1977-12-29 Acid Treatment 1303.00 1332.30 0
1978-01-25 Acid Treatment 1303.00 1332.30 0
1980-01-17 Cement Squeeze 1303.00 1332.30 0
1980-01-21 Perforation 1329.80 1332.80 13
1980-01-21 Perforation 1319.30 1326.00 13
1980-01-21 Perforation 1312.50 1315.00 13
1980-01-21 Perforation 1308.50 1310.30 13
1966-10-27 Acid Treatment 1318.60 1324.70 0
1980-01-22 Acid Treatment 1308.50 1332.80 0
1980-01-24 Cement Squeeze 1308.50 1315.00 0
1982-07-23 Cement Squeeze 1329.80 1332.80 0
1982-07-24 Cement Squeeze 1329.80 1332.80 0
1982-07-25 Acid Treatment 1319.30 1326.00 0
1982-07-28 Acid Treatment 1319.30 1326.00 0
1982-07-29 Perforation 1318.80 1325.90 13
1982-08-03 Acid Treatment 1318.80 1325.90 0
1988-05-31 Perforation 1335.00 1341.00 13
1988-06-02 Acid Treatment 1335.00 1341.00 0
1966-11-01 Perforation 1308.80 1310.60 13
1988-06-06 Cement Squeeze 1318.80 1325.90 0
1988-06-10 Perforation 1335.00 1341.00 13
1988-06-11 Acid Treatment 1335.00 1341.00 0
1992-11-15 Acid Treatment 1335.00 1341.00 0
2013-08-11 Perforation 1335.00 1341.00 20
2013-08-11 Perforation 1340.20 1344.20 20
2013-08-15 Acid Treatment 1335.00 1344.20 0
1966-11-01 Perforation 1313.10 1314.00 13
1966-11-02 Acid Treatment 1308.80 1314.00 0
1967-08-19 Cement Squeeze 1308.80 1324.70 0
1967-08-23 Acid Treatment 1317.30 1324.70 0
1967-08-24 Cement Squeeze 1315.80 1324.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References