X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0554142610000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0554142610000
 
| Well ID: 0554142610000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.783639, -111.967953 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.783639, -111.967953 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-26-055-14W4/0
 
| Location: 00/10-26-055-14W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/10-26-055-14 W4/00
 
| Location Alias 2: 00/10-26-055-14 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 055
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 14
 +
|-
 +
| Section: 26
 
|-
 
|-
 
| County/Municipality: [[County of Two Hills No. 21,_Alberta|County of Two Hills No. 21]]
 
| County/Municipality: [[County of Two Hills No. 21,_Alberta|County of Two Hills No. 21]]
Line 17: Line 27:
 
| Well Name: BRASCAN HB HAIRY 10-26-55-14
 
| Well Name: BRASCAN HB HAIRY 10-26-55-14
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Nyrstar Myra Falls Ltd.]]
 
|-
 
|-
 
| License Number: 0050933
 
| License Number: 0050933
Line 29: Line 39:
 
| Final Drill Date: 1974-08-28
 
| Final Drill Date: 1974-08-28
 
|-
 
|-
| Well Total Depth: 670 m
+
| Well Total Depth: 670.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.783639
 
| Surface Hole Latitude: 53.783639
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1974-08-23
 +
| Obtained License
 +
|-
 +
| 1974-08-28
 +
| Finished Drilling
 +
|-
 +
| 1974-08-29
 +
| Production Casing Operation Performed
 +
|-
 +
| 1974-09-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1974-10-01
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1974-11-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1974-11-12
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1975-07-12
 +
| Well Began Production
 +
|-
 +
| 1975-07-12
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1975-07-12
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1979-05-23
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-05-23
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1979-05-23
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1979-05-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-06-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-09-16
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1981-03-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1981-03-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1981-03-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-03-24
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1981-03-24
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1981-03-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1981-03-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-05-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1988-05-18
 +
| Plug Back Performed
 +
|-
 +
| 1988-06-16
 +
| Well Log Performed
 +
|-
 +
| 1988-07-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-07-05
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1996-07-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-07-19
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1996-07-19
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1996-08-21
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 195:
 
| 1974-09-26
 
| 1974-09-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 654.1
+
| style="text-align: right;" | 654.10
| style="text-align: right;" | 656.5
+
| style="text-align: right;" | 656.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1974-10-01
 
| 1974-10-01
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 654.1
+
| style="text-align: right;" | 654.10
| style="text-align: right;" | 656.5
+
| style="text-align: right;" | 656.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1974-11-06
 
| 1974-11-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 638.8
+
| style="text-align: right;" | 638.80
| style="text-align: right;" | 640.7
+
| style="text-align: right;" | 640.70
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1979-05-23
 
| 1979-05-23
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 638.8
+
| style="text-align: right;" | 638.80
| style="text-align: right;" | 640.7
+
| style="text-align: right;" | 640.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-05-25
 
| 1979-05-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 649.8
+
| style="text-align: right;" | 649.80
| style="text-align: right;" | 650.4
+
| style="text-align: right;" | 650.40
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1979-05-25
 
| 1979-05-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 651.4
+
| style="text-align: right;" | 651.40
| style="text-align: right;" | 652.6
+
| style="text-align: right;" | 652.60
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1979-06-19
 
| 1979-06-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 649.8
+
| style="text-align: right;" | 649.80
| style="text-align: right;" | 656.5
+
| style="text-align: right;" | 656.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-09-16
 
| 1980-09-16
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 649.8
+
| style="text-align: right;" | 649.80
| style="text-align: right;" | 652.6
+
| style="text-align: right;" | 652.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-03-23
 
| 1981-03-23
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 637
+
| style="text-align: right;" | 637.00
| style="text-align: right;" | 647
+
| style="text-align: right;" | 647.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-03-23
 
| 1981-03-23
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 623
+
| style="text-align: right;" | 623.00
| style="text-align: right;" | 633
+
| style="text-align: right;" | 633.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-03-24
 
| 1981-03-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 615.1
+
| style="text-align: right;" | 615.10
| style="text-align: right;" | 616
+
| style="text-align: right;" | 616.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1981-03-24
 
| 1981-03-24
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 615.1
+
| style="text-align: right;" | 615.10
| style="text-align: right;" | 616
+
| style="text-align: right;" | 616.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-03-25
 
| 1981-03-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 602
+
| style="text-align: right;" | 602.00
| style="text-align: right;" | 612
+
| style="text-align: right;" | 612.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-03-25
 
| 1981-03-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 522.1
+
| style="text-align: right;" | 522.10
| style="text-align: right;" | 523.2
+
| style="text-align: right;" | 523.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1981-03-25
 
| 1981-03-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 483.4
+
| style="text-align: right;" | 483.40
| style="text-align: right;" | 484
+
| style="text-align: right;" | 484.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1988-05-18
 
| 1988-05-18
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 509
+
| style="text-align: right;" | 509.00
| style="text-align: right;" | 519
+
| style="text-align: right;" | 519.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988-05-18
 
| 1988-05-18
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 470
+
| style="text-align: right;" | 470.00
| style="text-align: right;" | 480
+
| style="text-align: right;" | 480.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1988-07-04
 
| 1988-07-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 193
+
| style="text-align: right;" | 193.00
| style="text-align: right;" | 193.5
+
| style="text-align: right;" | 193.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1988-07-05
 
| 1988-07-05
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 193
+
| style="text-align: right;" | 193.00
| style="text-align: right;" | 193.5
+
| style="text-align: right;" | 193.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996-07-16
 
| 1996-07-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 268
+
| style="text-align: right;" | 268.00
| style="text-align: right;" | 269
+
| style="text-align: right;" | 269.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1996-07-19
 
| 1996-07-19
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 268
+
| style="text-align: right;" | 268.00
| style="text-align: right;" | 269
+
| style="text-align: right;" | 269.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996-07-19
 
| 1996-07-19
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 253
+
| style="text-align: right;" | 253.00
| style="text-align: right;" | 269
+
| style="text-align: right;" | 269.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 208: Line 329:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 241: Line 376:
 
| 1975
 
| 1975
 
| style="text-align: right;" | 3985
 
| style="text-align: right;" | 3985
| style="text-align: right;" | 15221.0
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 247: Line 382:
 
| 1976
 
| 1976
 
| style="text-align: right;" | 7890
 
| style="text-align: right;" | 7890
| style="text-align: right;" | 32264.6
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 13.9
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1977
 
| 1977
 
| style="text-align: right;" | 5168
 
| style="text-align: right;" | 5168
| style="text-align: right;" | 16838.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 35.4
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1978
 
| 1978
 
| style="text-align: right;" | 7893
 
| style="text-align: right;" | 7893
| style="text-align: right;" | 16373.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 50.2
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1979
 
| 1979
 
| style="text-align: right;" | 8031
 
| style="text-align: right;" | 8031
| style="text-align: right;" | 7327.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 19.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1980
 
| 1980
 
| style="text-align: right;" | 6848
 
| style="text-align: right;" | 6848
| style="text-align: right;" | 5563.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 11.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 279: Line 414:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 11:28, 9 July 2020

Well Details

Well ID: 0554142610000
Loading map...
Location: 00/10-26-055-14W4/0
Location Alias: 00/10-26-55-14 W4M
Location Alias 2: 00/10-26-055-14 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 14
Section: 26
County/Municipality: County of Two Hills No. 21
Well Name: BRASCAN HB HAIRY 10-26-55-14
Operator Name: Nyrstar Myra Falls Ltd.
License Number: 0050933
License Date: 1974-08-23
License Status: Abandoned
Spud Date: 1974-08-25
Final Drill Date: 1974-08-28
Well Total Depth: 670.00 m
Surface Hole Latitude: 53.783639
Surface Hole Longitude: -111.967953

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-08-23 Obtained License
1974-08-28 Finished Drilling
1974-08-29 Production Casing Operation Performed
1974-09-26 Perforation Treatment Performed - Jet Perforation
1974-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-06 Perforation Treatment Performed - Jet Perforation
1974-11-12 Well Mode changed to Drilled and Cased
1975-07-12 Well Began Production
1975-07-12 Well Fluid changed to Gas
1975-07-12 Well Mode changed to Flowing
1979-05-23 Perforation Treatment Performed - Cement Squeeze
1979-05-23 Well Fluid changed to Gas
1979-05-23 Well Mode changed to Flowing
1979-05-25 Perforation Treatment Performed - Jet Perforation
1979-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-24 Perforation Treatment Performed - Jet Perforation
1981-03-24 Well Fluid changed to Gas
1981-03-24 Well Mode changed to Abandoned Zone
1981-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-25 Perforation Treatment Performed - Jet Perforation
1988-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-18 Plug Back Performed
1988-06-16 Well Log Performed
1988-07-04 Perforation Treatment Performed - Jet Perforation
1988-07-05 Perforation Treatment Performed - Remedial Casing
1996-07-16 Perforation Treatment Performed - Jet Perforation
1996-07-19 Perforation Treatment Performed - Cement Plug
1996-07-19 Perforation Treatment Performed - Remedial Casing
1996-08-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-26 Perforation 654.10 656.50 13
1974-10-01 Acid Treatment 654.10 656.50 0
1974-11-06 Perforation 638.80 640.70 7
1979-05-23 Cement Squeeze 638.80 640.70 0
1979-05-25 Perforation 649.80 650.40 7
1979-05-25 Perforation 651.40 652.60 7
1979-06-19 Acid Treatment 649.80 656.50 0
1980-09-16 Acid Treatment 649.80 652.60 0
1981-03-23 Packing Device Capped w/Cement 637.00 647.00 0
1981-03-23 Packing Device Capped w/Cement 623.00 633.00 0
1981-03-24 Perforation 615.10 616.00 14
1981-03-24 Acid Treatment 615.10 616.00 0
1981-03-25 Packing Device Capped w/Cement 602.00 612.00 0
1981-03-25 Perforation 522.10 523.20 13
1981-03-25 Perforation 483.40 484.00 13
1988-05-18 Packing Device Capped w/Cement 509.00 519.00 0
1988-05-18 Packing Device Capped w/Cement 470.00 480.00 0
1988-07-04 Perforation 193.00 193.50 13
1988-07-05 Remedial Casing Cementing 193.00 193.50 0
1996-07-16 Perforation 268.00 269.00 13
1996-07-19 Remedial Casing Cementing 268.00 269.00 0
1996-07-19 Cement Plug 253.00 269.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 3985 0.0 0.0 0.0
1976 7890 0.0 0.0 0.0
1977 5168 0.0 0.0 0.0
1978 7893 0.0 0.0 0.0
1979 8031 0.0 0.0 0.0
1980 6848 0.0 0.0 0.0

For data sources see[5]

References