If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534262506020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.605033,"lon":-113.704621,"icon":""}]} |
Location: 02/06-25-053-26W4/0 | |
Location Alias: 02/06-25-53-26 W4M | |
Location Alias 2: 02/06-25-053-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 26 | |
Section: 25 | |
County/Municipality: Sturgeon County | |
Well Name: DAYLIGHT 103 STAL-BLK 6-25-53-26 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0015044 | |
License Date: 1958-04-08 | |
License Status: Suspension | |
Spud Date: 1958-07-12 | |
Final Drill Date: 1958-07-23 | |
Well Total Depth: 1337.80 m | |
Surface Hole Latitude: 53.605033 | |
Surface Hole Longitude: -113.704621 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-04-08 | Obtained License |
1958-07-20 | Production Casing Operation Performed |
1958-07-23 | Finished Drilling |
1958-07-23 | Perforation Treatment Performed - Open-Hole Completion |
1958-07-23 | Well Mode changed to Drilled and Cased |
1958-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-07-28 | Well Began Production |
1958-07-28 | Well Fluid changed to Crude Oil |
1958-07-28 | Well Mode changed to Flowing |
1958-09-15 | Perforation Treatment Performed - Jet Perforation |
1958-09-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-09-18 | Well Fluid changed to Crude Oil |
1958-09-18 | Well Mode changed to Flowing |
1973-11-09 | Perforation Treatment Performed - Cement Squeeze |
1973-11-09 | Well Fluid changed to Crude Oil |
1973-11-09 | Well Mode changed to Flowing |
1975-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1975-03-04 | Perforation Treatment Performed - Jet Perforation |
1975-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1975-03-26 | Perforation Treatment Performed - Jet Perforation |
1975-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-06-10 | Perforation Treatment Performed - Jet Perforation |
1979-03-05 | Perforation Treatment Performed - Cement Squeeze |
1979-03-06 | Perforation Treatment Performed - Cement Squeeze |
1979-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-03-09 | Perforation Treatment Performed - Jet Perforation |
1979-03-11 | Well Fluid changed to Crude Oil |
1979-03-11 | Well Mode changed to Pumping |
1979-06-29 | Perforation Treatment Performed - Cement Squeeze |
1979-07-08 | Perforation Treatment Performed - Jet Perforation |
1979-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-07-21 | Perforation Treatment Performed - Cement Squeeze |
1979-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-07-24 | Perforation Treatment Performed - Jet Perforation |
1990-02-02 | Well Fluid changed to Crude Oil |
1990-02-02 | Well Mode changed to Suspended |
1995-10-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-10-19 | Perforation Treatment Performed - Jet Perforation |
1995-10-19 | Perforation Treatment Performed - Remedial Casing |
1995-10-19 | Plug Back Performed |
1995-10-19 | Well Log Performed |
1995-10-20 | Perforation Treatment Performed - Jet Perforation |
1995-10-20 | Perforation Treatment Performed - Remedial Casing |
1995-10-20 | Well Fluid changed to Crude Oil |
1995-10-20 | Well Mode changed to Abandoned and Re-entered |
1995-10-21 | Well Abandoned |
1997-11-17 | Well Log Performed |
1998-11-26 | Well Log Performed |
1998-11-27 | Well Log Performed |
1998-11-28 | Well Log Performed |
2003-04-09 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-07-23 | Open Hole/Barefoot Completion | 1334.70 | 1337.80 | 0 |
1958-07-28 | Acid Treatment | 1334.70 | 1337.80 | 0 |
1958-09-15 | Perforation | 1235.40 | 1237.20 | 13 |
1958-09-17 | Acid Treatment | 1235.40 | 1237.20 | 0 |
1973-11-09 | Cement Squeeze | 1235.40 | 1237.20 | 0 |
1975-03-04 | Packing Device Capped w/Cement | 1330.60 | 1331.70 | 0 |
1975-03-04 | Perforation | 1320.40 | 1323.40 | 12 |
1975-03-04 | Perforation | 1323.40 | 1324.10 | 6 |
1975-03-04 | Acid Treatment | 1320.40 | 1324.10 | 0 |
1975-03-25 | Packing Device Capped w/Cement | 1330.80 | 1331.70 | 12 |
1975-03-26 | Perforation | 1320.40 | 1323.40 | 13 |
1975-03-26 | Perforation | 1323.40 | 1324.10 | 13 |
1975-03-27 | Acid Treatment | 1320.40 | 1324.10 | 0 |
1975-06-10 | Perforation | 1327.00 | 1330.00 | 12 |
1975-06-10 | Acid Treatment | 1320.40 | 1330.00 | 0 |
1979-03-05 | Cement Squeeze | 1320.40 | 1330.00 | 0 |
1979-03-06 | Cement Squeeze | 1320.40 | 1330.00 | 6 |
1979-03-09 | Perforation | 1322.50 | 1324.10 | 6 |
1979-03-09 | Acid Treatment | 1322.50 | 1324.10 | 0 |
1979-06-29 | Cement Squeeze | 1322.50 | 1324.10 | 6 |
1979-07-08 | Perforation | 1323.70 | 1324.70 | 6 |
1979-07-09 | Acid Treatment | 1323.70 | 1324.70 | 0 |
1979-07-21 | Cement Squeeze | 1323.70 | 1324.70 | 0 |
1979-07-24 | Perforation | 1323.70 | 1324.70 | 6 |
1979-07-24 | Acid Treatment | 1323.70 | 1324.70 | 0 |
1995-10-19 | Packing Device Capped w/Cement | 1304.00 | 1312.00 | 0 |
1995-10-19 | Perforation | 700.00 | 701.00 | 13 |
1995-10-19 | Remedial Casing Cementing | 700.00 | 701.00 | 0 |
1995-10-20 | Perforation | 210.00 | 211.00 | 13 |
1995-10-20 | Remedial Casing Cementing | 210.00 | 211.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 2160 | 0.0 | 0.0 | 0.0 |
1968 | 2904 | 0.0 | 0.0 | 0.0 |
1969 | 1608 | 0.0 | 0.0 | 0.0 |
1970 | 1368 | 0.0 | 0.0 | 0.0 |
1971 | 1248 | 0.0 | 0.0 | 0.0 |
1972 | 2153 | 0.0 | 0.0 | 0.0 |
1973 | 3275 | 0.0 | 0.0 | 0.0 |
1974 | 2625 | 0.0 | 0.0 | 0.0 |
1975 | 2160 | 0.0 | 0.0 | 0.0 |
1976 | 2409 | 0.0 | 0.0 | 0.0 |
1977 | 2737 | 0.0 | 0.0 | 0.0 |
1978 | 2693 | 0.0 | 0.0 | 0.0 |
1979 | 2892 | 0.0 | 0.0 | 0.0 |
1980 | 3190 | 0.0 | 0.0 | 0.0 |
1981 | 3456 | 0.0 | 0.0 | 0.0 |
1982 | 4109 | 0.0 | 0.0 | 0.0 |
1983 | 6159 | 0.0 | 0.0 | 0.0 |
1984 | 8296 | 0.0 | 0.0 | 0.0 |
1985 | 7505 | 0.0 | 0.0 | 0.0 |
1986 | 7666 | 0.0 | 0.0 | 0.0 |
1987 | 8373 | 0.0 | 0.0 | 0.0 |
1988 | 8262 | 0.0 | 0.0 | 0.0 |
1989 | 8079 | 0.0 | 0.0 | 0.0 |
1990 | 780 | 0.0 | 0.0 | 0.0 |
For data sources see[5]