If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0534262506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.604755,"lon":-113.704391,"icon":""}]} |
Location: 00/06-25-053-26W4/0 | |
Location Alias: 00/06-25-53-26 W4M | |
Location Alias 2: 00/06-25-053-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 4 | |
Range: 26 | |
Section: 25 | |
County/Municipality: Sturgeon County | |
Well Name: DAYLIGHT STAL-BLK 6-25-53-26 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0012514 | |
License Date: 1956-10-23 | |
License Status: Suspension | |
Spud Date: 1956-11-28 | |
Final Drill Date: 1956-12-29 | |
Well Total Depth: 1450.80 m | |
Surface Hole Latitude: 53.604755 | |
Surface Hole Longitude: -113.704391 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1956-10-23 | Obtained License |
1956-12-12 | Drill Stem Test Performed |
1956-12-18 | Drill Stem Test Performed |
1956-12-19 | Drill Stem Test Performed |
1956-12-20 | Drill Stem Test Performed |
1956-12-22 | Liner Casing Operation Performed |
1956-12-29 | Finished Drilling |
1956-12-29 | Well Mode changed to Drilled and Cased |
1957-01-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-01-02 | Perforation Treatment Performed - Jet Perforation |
1957-01-08 | Well Began Production |
1957-01-08 | Well Fluid changed to Crude Oil |
1957-01-08 | Well Mode changed to Flowing |
1984-02-22 | Well Fluid changed to Crude Oil |
1984-02-22 | Well Mode changed to Suspended |
1996-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-11-22 | Plug Back Performed |
1996-11-22 | Well Fluid changed to Crude Oil |
1996-11-22 | Well Mode changed to Abandoned Zone |
1996-11-27 | Well Log Performed |
1997-11-17 | Perforation Treatment Performed - Jet Perforation |
2001-10-23 | Well Log Performed |
2001-10-24 | Perforation Treatment Performed - Cement Squeeze |
2001-10-24 | Plug Back Performed |
2001-10-26 | Perforation Treatment Performed - Jet Perforation |
2001-10-26 | Well Log Performed |
2001-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-10-27 | Plug Back Performed |
2001-10-27 | Well Log Performed |
2001-10-28 | Perforation Treatment Performed - Jet Perforation |
2001-10-28 | Well Log Performed |
2001-10-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-10-30 | Perforation Treatment Performed - Jet Perforation |
2001-10-31 | Well Log Performed |
2002-08-09 | Perforation Treatment Performed - Cement Squeeze |
2002-08-09 | Plug Back Performed |
2002-08-10 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-01-02 | Perforation | 1444.80 | 1446.20 | 13 |
2001-10-30 | Perforation | 1116.00 | 1120.00 | 17 |
2002-08-09 | Cement Squeeze | 1116.00 | 1120.00 | 0 |
1957-01-02 | Acid Treatment | 1444.80 | 1446.20 | 0 |
1996-11-22 | Packing Device Capped w/Cement | 1427.00 | 1435.00 | 0 |
1997-11-17 | Perforation | 1136.90 | 1140.00 | 13 |
2001-10-24 | Cement Squeeze | 1136.90 | 1140.00 | 0 |
2001-10-26 | Perforation | 1210.00 | 1217.50 | 17 |
2001-10-27 | Packing Device Capped w/Cement | 1200.00 | 1208.00 | 0 |
2001-10-28 | Perforation | 1179.50 | 1181.00 | 17 |
2001-10-30 | Packing Device Capped w/Cement | 1167.00 | 1175.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5904 | 0.0 | 0.0 | 0.0 |
1968 | 6623 | 0.0 | 0.0 | 0.0 |
1969 | 7008 | 0.0 | 0.0 | 0.0 |
1970 | 7060 | 0.0 | 0.0 | 0.0 |
1971 | 6152 | 0.0 | 0.0 | 0.0 |
1972 | 7406 | 0.0 | 0.0 | 0.0 |
1973 | 8431 | 0.0 | 0.0 | 0.0 |
1974 | 5051 | 0.0 | 0.0 | 0.0 |
1975 | 7210 | 0.0 | 0.0 | 0.0 |
1976 | 7617 | 0.0 | 0.0 | 0.0 |
1989 | 249 | 0.0 | 0.0 | 0.0 |
For data sources see[5]