If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505121010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.304348,"lon":-115.632983,"icon":""}]} |
Location: 00/10-10-050-12W5/0 | |
Location Alias: 00/10-10-50-12 W5M | |
Location Alias 2: 00/10-10-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 10-10-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0446533 | |
License Date: 2012-06-14 | |
License Status: Issued | |
Spud Date: 2012-07-30 | |
Final Drill Date: 2012-08-11 | |
Well Total Depth: 4238.00 m | |
Surface Hole Latitude: 53.304348 | |
Surface Hole Longitude: -115.632983 |
Date | Event |
---|---|
2012-06-14 | Obtained License |
2012-08-01 | Surface Casing Operation Performed |
2012-08-03 | Direction Drilling Operation Performed - Deviate |
2012-08-03 | Direction Drilling Operation Performed - Horizontal |
2012-08-03 | Well Log Performed |
2012-08-11 | Finished Drilling |
2012-08-11 | Well Log Performed |
2012-08-11 | Well Mode changed to Drilled and Cased |
2012-08-14 | Production Casing Operation Performed |
2012-08-14 | Rig Released |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Pumping |
2012-09-13 | Well Log Performed |
2012-09-14 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-17 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-03 | 1513.00 | Deviate (5 - 79 degrees) |
2012-08-03 | 1893.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-14 | Open Hole/Barefoot Completion | 4235.00 | 4238.00 | 0 |
2012-09-16 | Multi-Stage Fracture | 3352.80 | 3352.90 | 0 |
2012-09-16 | Multi-Stage Fracture | 3252.00 | 3252.10 | 0 |
2012-09-16 | Multi-Stage Fracture | 3137.80 | 3137.90 | 0 |
2012-09-16 | Multi-Stage Fracture | 3023.20 | 3023.30 | 0 |
2012-09-16 | Multi-Stage Fracture | 2908.70 | 2908.80 | 0 |
2012-09-16 | Multi-Stage Fracture | 2794.90 | 2795.00 | 0 |
2012-09-16 | Multi-Stage Fracture | 2682.90 | 2683.00 | 0 |
2012-09-16 | Multi-Stage Fracture | 2570.10 | 2570.20 | 0 |
2012-09-17 | Multi-Stage Fracture | 2458.90 | 2459.00 | 0 |
2012-09-17 | Multi-Stage Fracture | 2346.90 | 2347.00 | 0 |
2012-09-15 | Multi-Stage Fracture | 4223.50 | 4223.60 | 0 |
2012-09-17 | Multi-Stage Fracture | 2235.50 | 2235.60 | 0 |
2012-09-17 | Multi-Stage Fracture | 2123.10 | 2123.20 | 0 |
2012-09-17 | Multi-Stage Fracture | 2010.20 | 2010.30 | 0 |
2012-09-17 | Multi-Stage Fracture | 1937.20 | 1937.30 | 0 |
2012-09-16 | Multi-Stage Fracture | 4142.40 | 4142.50 | 0 |
2012-09-16 | Multi-Stage Fracture | 4027.70 | 4027.80 | 0 |
2012-09-16 | Multi-Stage Fracture | 3912.70 | 3912.80 | 0 |
2012-09-16 | Multi-Stage Fracture | 3798.10 | 3798.20 | 0 |
2012-09-16 | Multi-Stage Fracture | 3697.30 | 3697.40 | 0 |
2012-09-16 | Multi-Stage Fracture | 3582.30 | 3582.40 | 0 |
2012-09-16 | Multi-Stage Fracture | 3467.30 | 3467.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1798 | 0.0 | 0.0 | 0.0 |
2013 | 8734 | 0.0 | 0.0 | 0.0 |
2014 | 8606 | 0.0 | 0.0 | 0.0 |
2015 | 8516 | 0.0 | 0.0 | 0.0 |
2016 | 8587 | 0.0 | 0.0 | 0.0 |
2017 | 8590 | 0.0 | 0.0 | 0.0 |
2018 | 8514 | 0.0 | 0.0 | 0.0 |
2019 | 8599 | 0.0 | 0.0 | 0.0 |
2020 | 2161 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-14 | No Incident Encountered | 0.00 | 0.00 |
2012-09-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]