X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0504110907005"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0504110907005
 
| Well ID: 0504110907005
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.2971960000000422, -111.55206399999997302 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.297196, -111.552064 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/07-09-050-11W4/5
 
| Location: 00/07-09-050-11W4/5
 +
|-
 +
| Location Alias: 00/07-09-50-11 W4M
 +
|-
 +
| Location Alias 2: 00/07-09-050-11 W4/05
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 050
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 11
 +
|-
 +
| Section: 09
 +
|-
 +
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
 
|-
 
|-
 
| Well Name: TASMAN BIRCH 7-9-50-11
 
| Well Name: TASMAN BIRCH 7-9-50-11
 +
|-
 +
| Operator Name: [[ORLEN Upstream Canada Ltd.]]
 +
|-
 +
| License Number: 0333323
 
|-
 
|-
 
| License Date: 2005-06-21
 
| License Date: 2005-06-21
 
|-
 
|-
| Final Drilling Date: 2005-08-07
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2005-07-15
 +
|-
 +
| Final Drill Date: 2005-08-07
 +
|-
 +
| Well Total Depth: 710.90 m
 +
|-
 +
| Surface Hole Latitude: 53.297196
 +
|-
 +
| Surface Hole Longitude: -111.552064
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-06-21
 +
| Obtained License
 +
|-
 +
| 2005-07-09
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2005-07-16
 +
| Production Casing Operation Performed
 +
|-
 +
| 2005-07-16
 +
| Rig Released
 +
|-
 +
| 2005-07-16
 +
| Well Log Performed
 +
|-
 +
| 2005-08-07
 +
| Finished Drilling
 +
|-
 +
| 2005-08-07
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2005-08-07
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2005-08-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-08-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-10-26
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2005-10-26
 +
| Plug Back Performed
 +
|-
 +
| 2005-10-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-03-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Total Depth: 710.9m
+
| 2009-03-16
 +
| Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2009-03-16
 +
| Plug Back Performed
 
|-
 
|-
| Status: Not Applicable
+
| 2009-03-17
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Well Type: Not Applicable
+
| 2009-03-17
 +
| Well Log Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2009-03-17
 +
| Well Structure changed to Commingled
 
|-
 
|-
| Latitude: 53.2971960000000422
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Longitude: -111.55206399999997302
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2005-08-07
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 705.00
 +
| style="text-align: right;" | 710.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-03-17
 +
| Perforation
 +
| style="text-align: right;" | 660.00
 +
| style="text-align: right;" | 661.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-03-17
 +
| Perforation
 +
| style="text-align: right;" | 648.00
 +
| style="text-align: right;" | 650.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-08-10
 +
| Perforation
 +
| style="text-align: right;" | 695.50
 +
| style="text-align: right;" | 696.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-08-11
 +
| Perforation
 +
| style="text-align: right;" | 673.00
 +
| style="text-align: right;" | 675.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-10-26
 +
| Cement Squeeze
 +
| style="text-align: right;" | 673.00
 +
| style="text-align: right;" | 675.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-10-29
 +
| Perforation
 +
| style="text-align: right;" | 614.00
 +
| style="text-align: right;" | 615.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-10-29
 +
| Perforation
 +
| style="text-align: right;" | 608.00
 +
| style="text-align: right;" | 611.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 694.00
 +
| style="text-align: right;" | 702.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-03-16
 +
| Packing Dev Cpd w/Res-Gyp Cem
 +
| style="text-align: right;" | 689.00
 +
| style="text-align: right;" | 691.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-03-17
 +
| Perforation
 +
| style="text-align: right;" | 665.50
 +
| style="text-align: right;" | 667.00
 +
| style="text-align: right;" | 17
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 14:28, 19 January 2021

Well Details

Well ID: 0504110907005
Loading map...
Location: 00/07-09-050-11W4/5
Location Alias: 00/07-09-50-11 W4M
Location Alias 2: 00/07-09-050-11 W4/05
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 11
Section: 09
County/Municipality: County of Minburn No. 27
Well Name: TASMAN BIRCH 7-9-50-11
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0333323
License Date: 2005-06-21
License Status: Issued
Spud Date: 2005-07-15
Final Drill Date: 2005-08-07
Well Total Depth: 710.90 m
Surface Hole Latitude: 53.297196
Surface Hole Longitude: -111.552064

For data sources see[1][2]

Well History

Date Event
2005-06-21 Obtained License
2005-07-09 Surface Casing Operation Performed
2005-07-16 Production Casing Operation Performed
2005-07-16 Rig Released
2005-07-16 Well Log Performed
2005-08-07 Finished Drilling
2005-08-07 Perforation Treatment Performed - Open-Hole Completion
2005-08-07 Well Mode changed to Drilled and Cased
2005-08-10 Perforation Treatment Performed - Jet Perforation
2005-08-11 Perforation Treatment Performed - Jet Perforation
2005-10-26 Perforation Treatment Performed - Cement Squeeze
2005-10-26 Plug Back Performed
2005-10-29 Perforation Treatment Performed - Jet Perforation
2009-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-16 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2009-03-16 Plug Back Performed
2009-03-17 Perforation Treatment Performed - Jet Perforation
2009-03-17 Well Log Performed
2009-03-17 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-07 Open Hole/Barefoot Completion 705.00 710.90 0
2009-03-17 Perforation 660.00 661.00 17
2009-03-17 Perforation 648.00 650.00 17
2005-08-10 Perforation 695.50 696.50 13
2005-08-11 Perforation 673.00 675.00 13
2005-10-26 Cement Squeeze 673.00 675.00 0
2005-10-29 Perforation 614.00 615.00 13
2005-10-29 Perforation 608.00 611.00 13
2009-03-16 Packing Device Capped w/Cement 694.00 702.00 0
2009-03-16 Packing Dev Cpd w/Res-Gyp Cem 689.00 691.00 0
2009-03-17 Perforation 665.50 667.00 17

For data sources see[4]



References