X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495061504020

Well Details

Well ID: 0495061504020
Loading map...
Location: 02/04-15-049-06W5/0
Location Alias: 02/04-15-49-06 W5M
Location Alias 2: 02/04-15-049-06 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 06
Section: 15
County/Municipality: Brazeau County
Well Name: ARC HZ 102 PEMBINA 4-15-49-6
Operator Name: ARC Resources Ltd.
License Number: 0448560
License Date: 2012-09-19
License Status: Issued
Spud Date: 2012-10-19
Final Drill Date: 2012-10-26
Well Total Depth: 3081.00 m
Surface Hole Latitude: 53.238648
Surface Hole Longitude: -114.811798

For data sources see[1][2]

Well History

Date Event
2012-09-19 Obtained License
2012-10-19 Surface Casing Operation Performed
2012-10-21 Direction Drilling Operation Performed - Deviate
2012-10-21 Well Log Performed
2012-10-22 Direction Drilling Operation Performed - Horizontal
2012-10-22 Intermediate Casing Operation Performed
2012-10-23 Intermediate Casing Operation Performed
2012-10-26 Finished Drilling
2012-10-26 Well Log Performed
2012-10-26 Well Mode changed to Drilled and Cased
2012-10-27 Liner Casing Operation Performed
2012-10-28 Perforation Treatment Performed - Open-Hole Completion
2012-10-28 Rig Released
2012-11-03 Well Log Performed
2012-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-10 Well Began Production
2012-11-10 Well Fluid changed to Crude Oil
2012-11-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-19 Excalibur Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-21 896.00 Deviate (5 - 79 degrees)
2012-10-22 1596.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-28 Open Hole/Barefoot Completion 3059.80 3081.00 0
2012-11-09 Multi-Stage Fracture 1739.80 1739.90 0
2012-11-09 Multi-Stage Fracture 1831.70 1831.80 0
2012-11-09 Multi-Stage Fracture 1923.60 1923.70 0
2012-11-09 Multi-Stage Fracture 2015.50 2015.60 0
2012-11-09 Multi-Stage Fracture 2107.40 2107.50 0
2012-11-09 Multi-Stage Fracture 2187.90 2188.00 0
2012-11-09 Multi-Stage Fracture 2268.50 2268.60 0
2012-11-09 Multi-Stage Fracture 2349.00 2349.10 0
2012-11-09 Multi-Stage Fracture 2429.60 2429.70 0
2012-11-09 Multi-Stage Fracture 2510.20 2510.30 0
2012-11-09 Multi-Stage Fracture 2590.70 2590.80 0
2012-11-09 Multi-Stage Fracture 2671.30 2671.40 0
2012-11-09 Multi-Stage Fracture 2751.80 2751.90 0
2012-11-09 Multi-Stage Fracture 2832.40 2832.50 0
2012-11-09 Multi-Stage Fracture 2912.80 2912.90 0
2012-11-09 Multi-Stage Fracture 2993.30 2993.40 0
2012-11-09 Multi-Stage Fracture 3055.40 3055.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 964 0.0 0.0 0.0
2013 8508 0.0 0.0 0.0
2014 8652 0.0 0.0 0.0
2015 8707 0.0 0.0 0.0
2016 8104 0.0 0.0 0.0
2017 8668 0.0 0.0 0.0
2018 8265 0.0 0.0 0.0
2019 7425 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-28 No Incident Encountered 0.00 0.00
2012-11-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References