If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495061001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.213193,"lon":-114.834522,"icon":""}]} |
Location: 00/01-10-049-06W5/0 | |
Location Alias: 00/01-10-49-06 W5M | |
Location Alias 2: 00/01-10-049-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 06 | |
Section: 10 | |
County/Municipality: Brazeau County | |
Well Name: SINOPEC HZ PEMBINA 1-10-49-6 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0464151 | |
License Date: 2014-01-20 | |
License Status: Issued | |
Spud Date: 2014-02-19 | |
Final Drill Date: 2014-02-28 | |
Well Total Depth: 4770.00 m | |
Surface Hole Latitude: 53.213193 | |
Surface Hole Longitude: -114.834522 |
Date | Event |
---|---|
2014-01-20 | Obtained License |
2014-02-02 | Well Log Performed |
2014-02-19 | Surface Casing Operation Performed |
2014-02-20 | Direction Drilling Operation Performed - Deviate |
2014-02-21 | Direction Drilling Operation Performed - Horizontal |
2014-02-22 | Well Log Performed |
2014-02-23 | Intermediate Casing Operation Performed |
2014-02-28 | Finished Drilling |
2014-02-28 | Well Log Performed |
2014-02-28 | Well Mode changed to Drilled and Cased |
2014-03-04 | Liner Casing Operation Performed |
2014-03-04 | Rig Released |
2014-04-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-11 | Perforation Treatment Performed - Open-Hole Completion |
2014-04-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-21 | Well Began Production |
2014-04-21 | Well Fluid changed to Crude Oil |
2014-04-21 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-02-19 | Nabors Drilling Limited | 26 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-20 | 1023.00 | Deviate (5 - 79 degrees) |
2014-02-21 | 1592.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-04-11 | Open Hole/Barefoot Completion | 4768.70 | 4770.00 | 0 |
2014-04-13 | Multi-Stage Fracture | 4154.90 | 4155.10 | 0 |
2014-04-13 | Multi-Stage Fracture | 4081.80 | 4082.00 | 0 |
2014-04-13 | Multi-Stage Fracture | 4008.90 | 4009.10 | 0 |
2014-04-13 | Multi-Stage Fracture | 3935.70 | 3935.90 | 0 |
2014-04-13 | Multi-Stage Fracture | 3863.10 | 3863.30 | 0 |
2014-04-13 | Multi-Stage Fracture | 3789.70 | 3789.90 | 0 |
2014-04-13 | Multi-Stage Fracture | 3716.50 | 3716.70 | 0 |
2014-04-13 | Multi-Stage Fracture | 3643.30 | 3643.50 | 0 |
2014-04-13 | Multi-Stage Fracture | 3569.90 | 3570.10 | 0 |
2014-04-13 | Multi-Stage Fracture | 3496.70 | 3496.90 | 0 |
2014-04-11 | Multi-Stage Fracture | 4736.60 | 4736.80 | 0 |
2014-04-13 | Multi-Stage Fracture | 3423.20 | 3423.40 | 0 |
2014-04-13 | Multi-Stage Fracture | 3350.10 | 3350.30 | 0 |
2014-04-15 | Multi-Stage Fracture | 3276.70 | 3276.90 | 0 |
2014-04-15 | Multi-Stage Fracture | 3203.10 | 3203.30 | 0 |
2014-04-15 | Multi-Stage Fracture | 3129.70 | 3129.90 | 0 |
2014-04-15 | Multi-Stage Fracture | 3056.30 | 3056.50 | 0 |
2014-04-15 | Multi-Stage Fracture | 2994.30 | 2994.50 | 0 |
2014-04-16 | Multi-Stage Fracture | 2920.80 | 2921.00 | 0 |
2014-04-16 | Multi-Stage Fracture | 2847.40 | 2847.60 | 0 |
2014-04-16 | Multi-Stage Fracture | 2774.00 | 2774.20 | 0 |
2014-04-11 | Multi-Stage Fracture | 4656.40 | 4656.60 | 0 |
2014-04-16 | Multi-Stage Fracture | 2700.60 | 2700.80 | 0 |
2014-04-16 | Multi-Stage Fracture | 2553.90 | 2554.10 | 0 |
2014-04-16 | Multi-Stage Fracture | 2480.70 | 2480.90 | 0 |
2014-04-16 | Multi-Stage Fracture | 2260.90 | 2261.10 | 0 |
2014-04-16 | Multi-Stage Fracture | 2187.60 | 2187.80 | 0 |
2014-04-16 | Multi-Stage Fracture | 2114.10 | 2114.30 | 0 |
2014-04-16 | Multi-Stage Fracture | 2041.20 | 2041.40 | 0 |
2014-04-16 | Multi-Stage Fracture | 1967.80 | 1968.00 | 0 |
2014-04-16 | Multi-Stage Fracture | 1894.40 | 1894.60 | 0 |
2014-04-16 | Multi-Stage Fracture | 1832.60 | 1832.80 | 0 |
2014-04-11 | Multi-Stage Fracture | 4583.00 | 4583.20 | 0 |
2014-04-12 | Multi-Stage Fracture | 4521.00 | 4521.20 | 0 |
2014-04-12 | Multi-Stage Fracture | 4447.70 | 4447.90 | 0 |
2014-04-12 | Multi-Stage Fracture | 4374.50 | 4374.70 | 0 |
2014-04-13 | Multi-Stage Fracture | 4301.30 | 4301.50 | 0 |
2014-04-13 | Multi-Stage Fracture | 4205.30 | 4205.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-11 | 2014-04-16 | 1,374 | 5,701 | N/A |
2 | 2014-04-11 | 2014-04-11 | 1,374 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 86.069 | N/A | |||
Sand (20/40) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 10.1311 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 10.1311 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 10.1311 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 10.1312 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0162 | N/A | |
Water | 7732-18-5 | 100 | 0.0162 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0967 | N/A | |
Water | 7732-18-5 | 100 | 0.0967 | N/A | ||||
Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 3.4608 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 3.4609 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.07 | N/A | |
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0833 | N/A | |
Water | 7732-18-5 | 100 | 0.0833 | N/A | ||||
2 | CO2 - Liquid | Canyon | Energizing Fluid | Carbon Dioxide | 124-38-9 | 100 | 12.8824 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-04-04 | 2014-04-19 | Central Water Distribution Facility | 6082 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 5305 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8615 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 5806 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-04 | No Incident Encountered | 0.00 | 0.00 |
2014-05-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]