X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494171711020

Well Details

Well ID: 0494171711020
Loading map...
Location: 02/11-17-049-17W4/0
Location Alias: 02/11-17-49-17 W4M
Location Alias 2: 02/11-17-049-17 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 17
Section: 17
County/Municipality: Beaver County
Well Name: PINE CLIFF BVHL 11-17-49-17
Operator Name: Pine Cliff Energy Ltd.
License Number: 0170121
License Date: 1994-09-02
License Status: Abandoned
Spud Date: 1994-09-04
Final Drill Date: 1994-09-07
Well Total Depth: 335.00 m
Surface Hole Latitude: 53.231302
Surface Hole Longitude: -112.458214

For data sources see[1][2]

Well History

Date Event
1994-09-02 Obtained License
1994-09-04 Conductor Casing Operation Performed
1994-09-05 Production Casing Operation Performed
1994-09-05 Well Log Performed
1994-09-07 Finished Drilling
1994-09-07 Perforation Treatment Performed - Open-Hole Completion
1994-09-07 Rig Released
1994-09-07 Well Mode changed to Drilled and Cased
1994-11-14 Well Log Performed
1994-11-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1994-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-16 Plug Back Performed
1994-11-16 Well Log Performed
1994-11-17 Well Log Performed
1994-11-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1994-12-16 Well Began Production
1994-12-16 Well Fluid changed to Gas
1994-12-16 Well Mode changed to Flowing
1999-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-30 Perforation Treatment Performed - Cement Squeeze
1999-08-30 Plug Back Performed
1999-09-14 Well Abandoned
1999-09-14 Well Fluid changed to Gas
1999-09-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-07 Open Hole/Barefoot Completion 326.50 335.00 0
1994-11-15 Hydra Jet Perforation 326.50 329.30 0
1994-11-16 Packing Device Capped w/Cement 310.00 318.00 0
1994-11-18 Hydra Jet Perforation 235.00 236.00 0
1999-08-30 Packing Device Capped w/Cement 295.90 303.90 0
1999-08-30 Cement Squeeze 235.50 237.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 376 0.0 0.0 0.0
1995 1232 0.0 0.0 0.0

For data sources see[5]

References