X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494111406000

Well Details

Well ID: 0494111406000
Loading map...
Location: 00/06-14-049-11W4/0
Location Alias: 00/06-14-49-11 W4M
Location Alias 2: 00/06-14-049-11 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 11
Section: 14
County/Municipality: County of Minburn No. 27
Well Name: PAN AM J-1 BIRCH LAKE 6-14-49-11
Operator Name: Canadian Natural Resources Limited
License Number: 0018403
License Date: 1959-12-30
License Status: RecCertified
Spud Date: 1960-01-09
Final Drill Date: 1960-01-13
Well Total Depth: 792.50 m
Surface Hole Latitude: 53.224764
Surface Hole Longitude: -111.507150

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-30 Obtained License
1960-01-13 Finished Drilling
1960-01-16 Drill Stem Test Performed
1960-01-17 Production Casing Operation Performed
1960-01-18 Perforation Treatment Performed - Jet Perforation
1960-02-22 Well Mode changed to Drilled and Cased
1972-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-19 Well Began Production
1973-01-19 Well Fluid changed to Gas
1973-01-19 Well Mode changed to Flowing
1974-10-01 Well Fluid changed to Gas
1974-10-01 Well Mode changed to Suspended
1975-11-17 Well Fluid changed to Gas
1975-11-17 Well Mode changed to Flowing
1979-04-10 Well Fluid changed to Gas
1979-04-10 Well Mode changed to Suspended
1984-12-06 Perforation Treatment Performed - Bridge Plug No Cement Required
1984-12-10 Well Fluid changed to Gas
1984-12-10 Well Mode changed to Flowing
1986-09-01 Well Fluid changed to Gas
1986-09-01 Well Mode changed to Suspended
1990-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-01 Plug Back Performed
1990-03-01 Well Abandoned
1990-03-01 Well Fluid changed to Gas
1990-03-01 Well Log Performed
1990-03-01 Well Mode changed to Abandoned
1990-07-05 Perforation Treatment Performed - Jet Perforation
1990-07-05 Well Log Performed
1990-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-31 Perforation Treatment Performed - Jet Perforation
1990-07-31 Perforation Treatment Performed - Remedial Casing
1990-07-31 Well Log Performed
1990-09-04 Perforation Treatment Performed - Jet Perforation
1990-09-04 Perforation Treatment Performed - Remedial Casing
1990-09-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-18 Perforation 737.30 738.50 13
1990-07-31 Packing Device Capped w/Cement 558.00 566.00 0
1990-07-31 Perforation 440.00 441.00 14
1990-07-31 Acid Treatment 440.00 441.00 0
1990-07-31 Remedial Casing Cementing 440.00 441.00 0
1990-09-04 Perforation 215.00 216.00 13
1990-09-04 Remedial Casing Cementing 215.00 216.00 0
1960-01-18 Perforation 730.60 731.20 13
1972-07-25 Acid Treatment 730.60 738.50 0
1972-07-30 Acid Treatment 730.60 738.50 0
1984-12-06 Bridge Plug, No Cement 733.30 733.30 0
1990-03-01 Packing Device Capped w/Cement 720.00 728.00 0
1990-07-05 Perforation 565.00 566.00 13
1990-07-05 Perforation 550.00 551.00 13
1990-07-06 Acid Treatment 550.00 566.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 3074 0.0 0.0 0.0
1974 1192 0.0 0.0 0.0
1975 1080 0.0 0.0 0.0
1976 3753 0.0 0.0 0.0
1977 740 0.0 0.0 0.0
1984 493 0.0 0.0 0.0
1985 1192 0.0 0.0 0.0
1986 475 0.0 0.0 0.0

For data sources see[5]

References