If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494111406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.224764,"lon":-111.50715,"icon":""}]} |
Location: 00/06-14-049-11W4/0 | |
Location Alias: 00/06-14-49-11 W4M | |
Location Alias 2: 00/06-14-049-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 11 | |
Section: 14 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PAN AM J-1 BIRCH LAKE 6-14-49-11 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0018403 | |
License Date: 1959-12-30 | |
License Status: RecCertified | |
Spud Date: 1960-01-09 | |
Final Drill Date: 1960-01-13 | |
Well Total Depth: 792.50 m | |
Surface Hole Latitude: 53.224764 | |
Surface Hole Longitude: -111.507150 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1959-12-30 | Obtained License |
1960-01-13 | Finished Drilling |
1960-01-16 | Drill Stem Test Performed |
1960-01-17 | Production Casing Operation Performed |
1960-01-18 | Perforation Treatment Performed - Jet Perforation |
1960-02-22 | Well Mode changed to Drilled and Cased |
1972-07-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-07-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-01-19 | Well Began Production |
1973-01-19 | Well Fluid changed to Gas |
1973-01-19 | Well Mode changed to Flowing |
1974-10-01 | Well Fluid changed to Gas |
1974-10-01 | Well Mode changed to Suspended |
1975-11-17 | Well Fluid changed to Gas |
1975-11-17 | Well Mode changed to Flowing |
1979-04-10 | Well Fluid changed to Gas |
1979-04-10 | Well Mode changed to Suspended |
1984-12-06 | Perforation Treatment Performed - Bridge Plug No Cement Required |
1984-12-10 | Well Fluid changed to Gas |
1984-12-10 | Well Mode changed to Flowing |
1986-09-01 | Well Fluid changed to Gas |
1986-09-01 | Well Mode changed to Suspended |
1990-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-03-01 | Plug Back Performed |
1990-03-01 | Well Abandoned |
1990-03-01 | Well Fluid changed to Gas |
1990-03-01 | Well Log Performed |
1990-03-01 | Well Mode changed to Abandoned |
1990-07-05 | Perforation Treatment Performed - Jet Perforation |
1990-07-05 | Well Log Performed |
1990-07-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-07-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-07-31 | Perforation Treatment Performed - Jet Perforation |
1990-07-31 | Perforation Treatment Performed - Remedial Casing |
1990-07-31 | Well Log Performed |
1990-09-04 | Perforation Treatment Performed - Jet Perforation |
1990-09-04 | Perforation Treatment Performed - Remedial Casing |
1990-09-04 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-01-18 | Perforation | 737.30 | 738.50 | 13 |
1990-07-31 | Packing Device Capped w/Cement | 558.00 | 566.00 | 0 |
1990-07-31 | Perforation | 440.00 | 441.00 | 14 |
1990-07-31 | Acid Treatment | 440.00 | 441.00 | 0 |
1990-07-31 | Remedial Casing Cementing | 440.00 | 441.00 | 0 |
1990-09-04 | Perforation | 215.00 | 216.00 | 13 |
1990-09-04 | Remedial Casing Cementing | 215.00 | 216.00 | 0 |
1960-01-18 | Perforation | 730.60 | 731.20 | 13 |
1972-07-25 | Acid Treatment | 730.60 | 738.50 | 0 |
1972-07-30 | Acid Treatment | 730.60 | 738.50 | 0 |
1984-12-06 | Bridge Plug, No Cement | 733.30 | 733.30 | 0 |
1990-03-01 | Packing Device Capped w/Cement | 720.00 | 728.00 | 0 |
1990-07-05 | Perforation | 565.00 | 566.00 | 13 |
1990-07-05 | Perforation | 550.00 | 551.00 | 13 |
1990-07-06 | Acid Treatment | 550.00 | 566.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1973 | 3074 | 0.0 | 0.0 | 0.0 |
1974 | 1192 | 0.0 | 0.0 | 0.0 |
1975 | 1080 | 0.0 | 0.0 | 0.0 |
1976 | 3753 | 0.0 | 0.0 | 0.0 |
1977 | 740 | 0.0 | 0.0 | 0.0 |
1984 | 493 | 0.0 | 0.0 | 0.0 |
1985 | 1192 | 0.0 | 0.0 | 0.0 |
1986 | 475 | 0.0 | 0.0 | 0.0 |
For data sources see[5]