X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0494090401002"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0494090401002
 
| Well ID: 0494090401002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.1921139, -111.2514498 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.193392, -111.253430 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: PEOC VIK-KINS 1-4-49-9
+
| Location: 00/01-04-049-09W4/2
 
|-
 
|-
| Operator:
+
| Location Alias: 00/01-04-49-09 W4M
 +
|-
 +
| Location Alias 2: 00/01-04-049-09 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 049
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 09
 +
|-
 +
| Section: 04
 +
|-
 +
| County/Municipality: [[County of Minburn No. 27,_Alberta|County of Minburn No. 27]]
 +
|-
 +
| Well Name: POC VIK-KINS 1-4-49-9
 +
|-
 +
| Operator Name: [[Perpetual Operating Corp.]]
 +
|-
 +
| License Number: 0146516
 
|-
 
|-
 
| License Date: 1990-11-27
 
| License Date: 1990-11-27
 
|-
 
|-
| Final Drilling Date: 1990-12-04
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1990-12-01
 +
|-
 +
| Final Drill Date: 1990-12-04
 +
|-
 +
| Well Total Depth: 829.00 m
 +
|-
 +
| Surface Hole Latitude: 53.193392
 +
|-
 +
| Surface Hole Longitude: -111.253430
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1990-11-27
 +
| Obtained License
 +
|-
 +
| 1990-12-02
 +
| Lost Circulation Occurred
 +
|-
 +
| 1990-12-02
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1990-12-04
 +
| Finished Drilling
 +
|-
 +
| 1990-12-04
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1990-12-05
 +
| Well Log Performed
 +
|-
 +
| 1990-12-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1990-12-07
 +
| Lost Circulation Occurred
 
|-
 
|-
| Total Depth: 829.0m
+
| 1990-12-07
 +
| Production Casing Operation Performed
 
|-
 
|-
| Fluid Type: Gas
+
| 1990-12-07
 +
| Rig Released
 
|-
 
|-
| Status: Suspended
+
| 1990-12-16
 +
| Well Log Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 1990-12-17
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Configuration: Vertical
+
| 1990-12-17
 +
| Well Log Performed
 
|-
 
|-
| Violations:
+
| 1993-11-25
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Latitude: 53.1921139
+
| 1993-12-13
 +
| Well Began Production
 
|-
 
|-
| Longitude: -111.2514498
+
| 1993-12-13
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1993-12-13
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1996-11-30
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1996-11-30
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1998-01-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-01-30
 +
| Well Log Performed
 +
|-
 +
| 1998-02-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1998-02-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2000-06-20
 +
| Well Log Performed
 +
|-
 +
| 2000-06-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-06-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2000-06-21
 +
| Plug Back Performed
 +
|-
 +
| 2000-06-21
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2000-06-21
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2017-03-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2017-03-16
 +
| Plug Back Performed
 +
|-
 +
| 2017-03-16
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2017-03-16
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2017-03-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2017-03-20
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2017-10-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2017-10-06
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2017-10-06
 +
| Well Log Performed
 +
|-
 +
| 2017-10-07
 +
| Well Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1990-12-17
 +
| Perforation
 +
| style="text-align: right;" | 708.00
 +
| style="text-align: right;" | 709.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2017-10-06
 +
| Perforation
 +
| style="text-align: right;" | 265.00
 +
| style="text-align: right;" | 266.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2017-10-06
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 265.00
 +
| style="text-align: right;" | 266.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1993-11-25
 +
| Perforation
 +
| style="text-align: right;" | 662.70
 +
| style="text-align: right;" | 664.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-01-30
 +
| Perforation
 +
| style="text-align: right;" | 726.00
 +
| style="text-align: right;" | 732.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2000-06-21
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 668.60
 +
| style="text-align: right;" | 676.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-06-21
 +
| Perforation
 +
| style="text-align: right;" | 666.00
 +
| style="text-align: right;" | 667.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2000-06-21
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 716.00
 +
| style="text-align: right;" | 724.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017-03-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 649.00
 +
| style="text-align: right;" | 657.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017-03-17
 +
| Perforation
 +
| style="text-align: right;" | 310.00
 +
| style="text-align: right;" | 311.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2017-03-20
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 310.00
 +
| style="text-align: right;" | 311.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1993
 +
| style="text-align: right;" | 455
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1994
 +
| style="text-align: right;" | 8027
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1995
 +
| style="text-align: right;" | 8690
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1996
 +
| style="text-align: right;" | 7186
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 1990-12-02
 +
| Lost Circulation
 +
| style="text-align: right;" | 87.00
 +
| style="text-align: right;" | 97.00
 +
|-
 +
| 1990-12-07
 +
| Lost Circulation
 +
| style="text-align: right;" | 829.00
 +
| style="text-align: right;" | 829.00
 +
|-
 +
| 2017-03-16
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2017-03-17
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2017-10-06
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 05:06, 19 January 2021

Well Details

Well ID: 0494090401002
Loading map...
Location: 00/01-04-049-09W4/2
Location Alias: 00/01-04-49-09 W4M
Location Alias 2: 00/01-04-049-09 W4/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 09
Section: 04
County/Municipality: County of Minburn No. 27
Well Name: POC VIK-KINS 1-4-49-9
Operator Name: Perpetual Operating Corp.
License Number: 0146516
License Date: 1990-11-27
License Status: RecCertified
Spud Date: 1990-12-01
Final Drill Date: 1990-12-04
Well Total Depth: 829.00 m
Surface Hole Latitude: 53.193392
Surface Hole Longitude: -111.253430

For data sources see[1][2]

Well History

Date Event
1990-11-27 Obtained License
1990-12-02 Lost Circulation Occurred
1990-12-02 Surface Casing Operation Performed
1990-12-04 Finished Drilling
1990-12-04 Well Mode changed to Drilled and Cased
1990-12-05 Well Log Performed
1990-12-06 Drill Stem Test Performed
1990-12-07 Lost Circulation Occurred
1990-12-07 Production Casing Operation Performed
1990-12-07 Rig Released
1990-12-16 Well Log Performed
1990-12-17 Perforation Treatment Performed - Jet Perforation
1990-12-17 Well Log Performed
1993-11-25 Perforation Treatment Performed - Jet Perforation
1993-12-13 Well Began Production
1993-12-13 Well Fluid changed to Gas
1993-12-13 Well Mode changed to Flowing
1996-11-30 Well Fluid changed to Gas
1996-11-30 Well Mode changed to Suspended
1998-01-30 Perforation Treatment Performed - Jet Perforation
1998-01-30 Well Log Performed
1998-02-01 Well Fluid changed to Gas
1998-02-01 Well Mode changed to Suspended
2000-06-20 Well Log Performed
2000-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-21 Perforation Treatment Performed - Jet Perforation
2000-06-21 Plug Back Performed
2000-06-21 Well Fluid changed to Gas
2000-06-21 Well Mode changed to Suspended
2017-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-16 Plug Back Performed
2017-03-16 Well Fluid changed to Gas
2017-03-16 Well Mode changed to Abandoned Zone
2017-03-17 Perforation Treatment Performed - Jet Perforation
2017-03-20 Perforation Treatment Performed - Remedial Casing
2017-10-06 Perforation Treatment Performed - Jet Perforation
2017-10-06 Perforation Treatment Performed - Remedial Casing
2017-10-06 Well Log Performed
2017-10-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-12-17 Perforation 708.00 709.00 14
2017-10-06 Perforation 265.00 266.00 20
2017-10-06 Remedial Casing Cementing 265.00 266.00 0
1993-11-25 Perforation 662.70 664.00 13
1998-01-30 Perforation 726.00 732.00 20
2000-06-21 Packing Device Capped w/Cement 668.60 676.60 0
2000-06-21 Perforation 666.00 667.00 20
2000-06-21 Packing Device Capped w/Cement 716.00 724.00 0
2017-03-16 Packing Device Capped w/Cement 649.00 657.00 0
2017-03-17 Perforation 310.00 311.00 13
2017-03-20 Remedial Casing Cementing 310.00 311.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 455 0.0 0.0 0.0
1994 8027 0.0 0.0 0.0
1995 8690 0.0 0.0 0.0
1996 7186 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-12-02 Lost Circulation 87.00 97.00
1990-12-07 Lost Circulation 829.00 829.00
2017-03-16 No Incident Encountered 0.00 0.00
2017-03-17 No Incident Encountered 0.00 0.00
2017-10-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References