X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485082207000

Well Details

Well ID: 0485082207000
Loading map...
Location: 00/07-22-048-08W5/0
Location Alias: 00/07-22-48-08 W5M
Location Alias 2: 00/07-22-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 22
County/Municipality: Brazeau County
Well Name: ARC HZ PEMBINA 7-22-48-8
Operator Name: ARC Resources Ltd.
License Number: 0466585
License Date: 2014-05-12
License Status: Issued
Spud Date: 2014-07-15
Final Drill Date: 2014-07-23
Well Total Depth: 2664.00 m
Surface Hole Latitude: 53.146882
Surface Hole Longitude: -115.079509

For data sources see[1][2]

Well History

Date Event
2014-05-12 Obtained License
2014-07-16 Surface Casing Operation Performed
2014-07-18 Direction Drilling Operation Performed - Deviate
2014-07-20 Direction Drilling Operation Performed - Horizontal
2014-07-20 Well Log Performed
2014-07-21 Intermediate Casing Operation Performed
2014-07-23 Finished Drilling
2014-07-23 Liner Casing Operation Performed
2014-07-23 Perforation Treatment Performed - Open-Hole Completion
2014-07-23 Well Log Performed
2014-07-23 Well Mode changed to Drilled and Cased
2014-07-24 Rig Released
2014-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-13 Well Began Production
2014-10-13 Well Fluid changed to Crude Oil
2014-10-13 Well Mode changed to Flowing
2018-06-01 Well Fluid changed to Crude Oil
2018-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-07-15 Excalibur Drilling Ltd. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-07-18 991.20 Deviate (5 - 79 degrees)
2014-07-20 1827.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-07-23 Open Hole/Barefoot Completion 2655.00 2664.00 0
2014-08-03 Multi-Stage Fracture 2258.30 2258.40 0
2014-08-03 Multi-Stage Fracture 2216.10 2216.20 0
2014-08-03 Multi-Stage Fracture 2160.30 2160.40 0
2014-08-03 Multi-Stage Fracture 2105.30 2105.40 0
2014-08-03 Multi-Stage Fracture 2063.70 2063.80 0
2014-08-03 Multi-Stage Fracture 2007.90 2008.00 0
2014-08-03 Multi-Stage Fracture 1958.80 1958.90 0
2014-08-03 Multi-Stage Fracture 2650.10 2650.20 0
2014-08-03 Multi-Stage Fracture 2607.30 2607.40 0
2014-08-03 Multi-Stage Fracture 2557.20 2557.30 0
2014-08-03 Multi-Stage Fracture 2515.90 2516.00 0
2014-08-03 Multi-Stage Fracture 2461.70 2461.80 0
2014-08-03 Multi-Stage Fracture 2412.40 2412.50 0
2014-08-03 Multi-Stage Fracture 2359.00 2359.10 0
2014-08-03 Multi-Stage Fracture 2308.80 2308.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-03 2014-08-03 1,564 1,558 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.1667 N/A
100 Mesh Sanjel Crystalline Silica 14808-60-7 100 0.6215 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 15.686 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 5.0737 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0085 N/A
Methyl Alcohol 67-56-1 100 0.0085 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1708 N/A
Non-Hazardous Ingredients Not Available 100 0.1708 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0427 N/A
Non-Hazardous Ingredients Not Available 100 0.0427 N/A
Surfactant 68131-40-8 100 0.0427 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-07-31 2014-07-31 Surface Water - Runoff 474
2014-08-01 2014-08-01 Surface Water - Runoff 732
2014-08-02 2014-08-02 Surface Water - Runoff 287

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1856 0.0 0.0 0.0
2015 8535 0.0 0.0 0.0
2016 8331 0.0 0.0 0.0
2017 8341 0.0 0.0 0.0
2018 8252 0.0 0.0 0.0
2019 8461 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-24 No Incident Encountered 0.00 0.00
2014-08-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References