If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0484271615000 | | Well ID: 0484271615000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 53.146910, -113.887594 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/15-16-048-27W4/0 | | Location: 00/15-16-048-27W4/0 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/15-16-048-27 W4/00 | | Location Alias 2: 00/15-16-048-27 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 048 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 27 | ||
+ | |- | ||
+ | | Section: 16 | ||
|- | |- | ||
| County/Municipality: [[Leduc County,_Alberta|Leduc County]] | | County/Municipality: [[Leduc County,_Alberta|Leduc County]] | ||
Line 17: | Line 27: | ||
| Well Name: ESSO WIZARD LAKE NO. C-9 | | Well Name: ESSO WIZARD LAKE NO. C-9 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Imperial Oil Resources Limited]] |
|- | |- | ||
| License Number: 0005992 | | License Number: 0005992 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1953-03-18 | | Final Drill Date: 1953-03-18 | ||
|- | |- | ||
− | | Well Total Depth: 2035 m | + | | Well Total Depth: 2035.00 m |
|- | |- | ||
− | | Surface Hole Latitude: 53. | + | | Surface Hole Latitude: 53.146910 |
|- | |- | ||
| Surface Hole Longitude: -113.887594 | | Surface Hole Longitude: -113.887594 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1953-01-26 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1953-03-16 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1953-03-18 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1953-03-18 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1953-03-18 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1953-03-21 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1953-03-21 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1953-03-21 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1970-07-22 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1970-07-22 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 1984-07-15 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1984-07-16 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1984-07-20 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1984-07-21 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-09-22 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1985-09-24 | ||
+ | | Liner Casing Operation Performed | ||
+ | |- | ||
+ | | 1985-09-24 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1985-09-26 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-09-28 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1985-09-28 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1985-09-28 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1985-09-28 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1985-09-28 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1986-06-06 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1986-06-06 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1986-06-07 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1988-05-19 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1988-05-22 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1988-05-23 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1988-05-24 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1990-02-12 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1990-02-13 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1990-02-13 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1990-02-14 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1990-02-14 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1990-02-14 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1990-02-17 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1996-09-01 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1996-09-01 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1998-09-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1998-09-01 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 2005-03-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2005-03-01 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 2005-12-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2005-12-01 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 2014-09-04 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-05 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-06 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-07 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-10 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2014-09-18 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2014-09-18 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2014-09-18 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2014-09-18 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2014-09-18 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | | 2014-09-20 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2014-09-20 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2014-09-21 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2014-09-21 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2015-09-01 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | | 2015-09-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2015-09-01 | ||
+ | | Well Mode changed to Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 285: | ||
| 1953-03-18 | | 1953-03-18 | ||
| Open Hole/Barefoot Completion | | Open Hole/Barefoot Completion | ||
− | | style="text-align: right;" | 1988. | + | | style="text-align: right;" | 1988.20 |
− | | style="text-align: right;" | 2001 | + | | style="text-align: right;" | 2001.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1984-07-20 | | 1984-07-20 | ||
| Open Hole/Barefoot Completion | | Open Hole/Barefoot Completion | ||
− | | style="text-align: right;" | 1988. | + | | style="text-align: right;" | 1988.20 |
− | | style="text-align: right;" | 2027 | + | | style="text-align: right;" | 2027.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1985-09-22 | | 1985-09-22 | ||
| Open Hole/Barefoot Completion | | Open Hole/Barefoot Completion | ||
− | | style="text-align: right;" | 1988. | + | | style="text-align: right;" | 1988.20 |
− | | style="text-align: right;" | 2035 | + | | style="text-align: right;" | 2035.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1985-09-24 | | 1985-09-24 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1988. | + | | style="text-align: right;" | 1988.20 |
− | | style="text-align: right;" | 2035 | + | | style="text-align: right;" | 2035.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1985-09-28 | | 1985-09-28 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1988. | + | | style="text-align: right;" | 1988.70 |
− | | style="text-align: right;" | 1989. | + | | style="text-align: right;" | 1989.20 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1985-09-28 | | 1985-09-28 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1988. | + | | style="text-align: right;" | 1988.70 |
− | | style="text-align: right;" | 1989. | + | | style="text-align: right;" | 1989.20 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1986-06-06 | | 1986-06-06 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1992. | + | | style="text-align: right;" | 1992.20 |
− | | style="text-align: right;" | 1992. | + | | style="text-align: right;" | 1992.70 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1986-06-07 | | 1986-06-07 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1988. | + | | style="text-align: right;" | 1988.70 |
− | | style="text-align: right;" | 1992. | + | | style="text-align: right;" | 1992.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1988-05-19 | | 1988-05-19 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1988. | + | | style="text-align: right;" | 1988.70 |
− | | style="text-align: right;" | 1992. | + | | style="text-align: right;" | 1992.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1988-05-23 | | 1988-05-23 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1996. | + | | style="text-align: right;" | 1996.90 |
− | | style="text-align: right;" | 1997. | + | | style="text-align: right;" | 1997.90 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1988-05-24 | | 1988-05-24 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1996. | + | | style="text-align: right;" | 1996.90 |
− | | style="text-align: right;" | 1997. | + | | style="text-align: right;" | 1997.90 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1990-02-12 | | 1990-02-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2001 | + | | style="text-align: right;" | 2001.00 |
− | | style="text-align: right;" | 2002 | + | | style="text-align: right;" | 2002.00 |
| style="text-align: right;" | 20 | | style="text-align: right;" | 20 | ||
|- | |- | ||
| 1990-02-12 | | 1990-02-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2005. | + | | style="text-align: right;" | 2005.50 |
− | | style="text-align: right;" | 2006. | + | | style="text-align: right;" | 2006.50 |
| style="text-align: right;" | 20 | | style="text-align: right;" | 20 | ||
|- | |- | ||
| 1990-02-13 | | 1990-02-13 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 2005. | + | | style="text-align: right;" | 2005.50 |
− | | style="text-align: right;" | 2006. | + | | style="text-align: right;" | 2006.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1990-02-14 | | 1990-02-14 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 2001 | + | | style="text-align: right;" | 2001.00 |
− | | style="text-align: right;" | 2002 | + | | style="text-align: right;" | 2002.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1990-02-14 | | 1990-02-14 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1996. | + | | style="text-align: right;" | 1996.90 |
− | | style="text-align: right;" | 1997. | + | | style="text-align: right;" | 1997.90 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1996-09-01 | | 1996-09-01 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2010 | + | | style="text-align: right;" | 2010.00 |
− | | style="text-align: right;" | 2010. | + | | style="text-align: right;" | 2010.90 |
| style="text-align: right;" | 20 | | style="text-align: right;" | 20 | ||
|- | |- | ||
| 1996-09-01 | | 1996-09-01 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 2010 | + | | style="text-align: right;" | 2010.00 |
− | | style="text-align: right;" | 2010. | + | | style="text-align: right;" | 2010.90 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-10 | | 2014-09-10 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1317. | + | | style="text-align: right;" | 1317.30 |
− | | style="text-align: right;" | 1318. | + | | style="text-align: right;" | 1318.30 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-10 | | 2014-09-10 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1262. | + | | style="text-align: right;" | 1262.20 |
− | | style="text-align: right;" | 1262. | + | | style="text-align: right;" | 1262.30 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-10 | | 2014-09-10 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 721 | + | | style="text-align: right;" | 721.00 |
− | | style="text-align: right;" | 722 | + | | style="text-align: right;" | 722.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-10 | | 2014-09-10 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 469. | + | | style="text-align: right;" | 469.40 |
− | | style="text-align: right;" | 470. | + | | style="text-align: right;" | 470.40 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-18 | | 2014-09-18 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 469. | + | | style="text-align: right;" | 469.40 |
− | | style="text-align: right;" | 1318. | + | | style="text-align: right;" | 1318.30 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-18 | | 2014-09-18 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 460. | + | | style="text-align: right;" | 460.70 |
− | | style="text-align: right;" | 1978 | + | | style="text-align: right;" | 1978.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-20 | | 2014-09-20 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 447 | + | | style="text-align: right;" | 447.00 |
− | | style="text-align: right;" | 448 | + | | style="text-align: right;" | 448.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-20 | | 2014-09-20 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 405 | + | | style="text-align: right;" | 405.00 |
− | | style="text-align: right;" | 406 | + | | style="text-align: right;" | 406.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-20 | | 2014-09-20 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 325 | + | | style="text-align: right;" | 325.00 |
− | | style="text-align: right;" | 326 | + | | style="text-align: right;" | 326.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-20 | | 2014-09-20 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 258 | + | | style="text-align: right;" | 258.00 |
− | | style="text-align: right;" | 259 | + | | style="text-align: right;" | 259.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-20 | | 2014-09-20 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 198 | + | | style="text-align: right;" | 198.00 |
− | | style="text-align: right;" | 199 | + | | style="text-align: right;" | 199.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2014-09-21 | | 2014-09-21 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 198 | + | | style="text-align: right;" | 198.00 |
− | | style="text-align: right;" | 448 | + | | style="text-align: right;" | 448.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-21 | | 2014-09-21 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 182. | + | | style="text-align: right;" | 182.20 |
− | | style="text-align: right;" | 460 | + | | style="text-align: right;" | 460.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2014-09-21 | | 2014-09-21 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 162 | + | | style="text-align: right;" | 162.00 |
− | | style="text-align: right;" | 182 | + | | style="text-align: right;" | 182.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 268: | Line 479: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | Start Date | + | !scope="col" | Job Number |
− | !scope="col" | End Date | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | + | !scope="col" | True Vertical Depth (ft) |
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 301: | Line 526: | ||
| 1961 | | 1961 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1985 | | 1985 | ||
| style="text-align: right;" | 2222 | | style="text-align: right;" | 2222 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1986 | | 1986 | ||
| style="text-align: right;" | 2314 | | style="text-align: right;" | 2314 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1987 | | 1987 | ||
| style="text-align: right;" | 786 | | style="text-align: right;" | 786 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1988 | | 1988 | ||
| style="text-align: right;" | 2852 | | style="text-align: right;" | 2852 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1989 | | 1989 | ||
| style="text-align: right;" | 6366 | | style="text-align: right;" | 6366 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1990 | | 1990 | ||
| style="text-align: right;" | 6958 | | style="text-align: right;" | 6958 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1991 | | 1991 | ||
| style="text-align: right;" | 4192 | | style="text-align: right;" | 4192 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1992 | | 1992 | ||
| style="text-align: right;" | 5067 | | style="text-align: right;" | 5067 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1993 | | 1993 | ||
| style="text-align: right;" | 3004 | | style="text-align: right;" | 3004 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1994 | | 1994 | ||
| style="text-align: right;" | 3817 | | style="text-align: right;" | 3817 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1995 | | 1995 | ||
| style="text-align: right;" | 7333 | | style="text-align: right;" | 7333 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1996 | | 1996 | ||
| style="text-align: right;" | 6130 | | style="text-align: right;" | 6130 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1997 | | 1997 | ||
| style="text-align: right;" | 1684 | | style="text-align: right;" | 1684 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
|} | |} | ||
Line 387: | Line 612: | ||
| title = Well Production Data - All Alberta | | title = Well Production Data - All Alberta | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
== Occurences == | == Occurences == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 398: | Line 623: | ||
|- | |- | ||
| 2014-09-22 | | 2014-09-22 | ||
− | | No Incident | + | | No Incident Encountered |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.00 |
|- | |- | ||
|} | |} | ||
Line 406: | Line 631: | ||
| title = General Well Data File - Tour-Occurence Data | | title = General Well Data File - Tour-Occurence Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Alberta]][[Category:Wells]] | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0484271615000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.14691,"lon":-113.887594,"icon":""}]} |
Location: 00/15-16-048-27W4/0 | |
Location Alias: 00/15-16-48-27 W4M | |
Location Alias 2: 00/15-16-048-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 27 | |
Section: 16 | |
County/Municipality: Leduc County | |
Well Name: ESSO WIZARD LAKE NO. C-9 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0005992 | |
License Date: 1953-01-26 | |
License Status: Abandoned | |
Spud Date: 1953-02-11 | |
Final Drill Date: 1953-03-18 | |
Well Total Depth: 2035.00 m | |
Surface Hole Latitude: 53.146910 | |
Surface Hole Longitude: -113.887594 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-01-26 | Obtained License |
1953-03-16 | Production Casing Operation Performed |
1953-03-18 | Finished Drilling |
1953-03-18 | Perforation Treatment Performed - Open-Hole Completion |
1953-03-18 | Well Mode changed to Drilled and Cased |
1953-03-21 | Well Began Production |
1953-03-21 | Well Fluid changed to Crude Oil |
1953-03-21 | Well Mode changed to Flowing |
1970-07-22 | Well Fluid changed to Crude Oil |
1970-07-22 | Well Mode changed to Suspended |
1984-07-15 | Well Log Performed |
1984-07-16 | Well Log Performed |
1984-07-20 | Perforation Treatment Performed - Open-Hole Completion |
1984-07-21 | Well Log Performed |
1985-09-22 | Perforation Treatment Performed - Open-Hole Completion |
1985-09-24 | Liner Casing Operation Performed |
1985-09-24 | Perforation Treatment Performed - Cement Squeeze |
1985-09-26 | Well Log Performed |
1985-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-09-28 | Perforation Treatment Performed - Jet Perforation |
1985-09-28 | Well Fluid changed to Crude Oil |
1985-09-28 | Well Log Performed |
1985-09-28 | Well Mode changed to Flowing |
1986-06-06 | Perforation Treatment Performed - Jet Perforation |
1986-06-06 | Well Log Performed |
1986-06-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-05-19 | Perforation Treatment Performed - Cement Squeeze |
1988-05-22 | Well Log Performed |
1988-05-23 | Perforation Treatment Performed - Jet Perforation |
1988-05-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-12 | Perforation Treatment Performed - Jet Perforation |
1990-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-13 | Well Log Performed |
1990-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-14 | Perforation Treatment Performed - Cement Squeeze |
1990-02-14 | Well Log Performed |
1990-02-17 | Well Log Performed |
1996-09-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-01 | Perforation Treatment Performed - Jet Perforation |
1998-09-01 | Well Fluid changed to Crude Oil |
1998-09-01 | Well Mode changed to Suspended |
2005-03-01 | Well Fluid changed to Crude Oil |
2005-03-01 | Well Mode changed to Flowing |
2005-12-01 | Well Fluid changed to Crude Oil |
2005-12-01 | Well Mode changed to Suspended |
2014-09-04 | Well Log Performed |
2014-09-05 | Well Log Performed |
2014-09-06 | Well Log Performed |
2014-09-07 | Well Log Performed |
2014-09-10 | Perforation Treatment Performed - Jet Perforation |
2014-09-18 | Perforation Treatment Performed - Cement Plug |
2014-09-18 | Perforation Treatment Performed - Remedial Casing |
2014-09-18 | Plug Back Performed |
2014-09-18 | Well Fluid changed to Crude Oil |
2014-09-18 | Well Mode changed to Abandoned Zone |
2014-09-20 | Perforation Treatment Performed - Jet Perforation |
2014-09-20 | Well Log Performed |
2014-09-21 | Perforation Treatment Performed - Cement Plug |
2014-09-21 | Perforation Treatment Performed - Remedial Casing |
2015-09-01 | Well Abandoned |
2015-09-01 | Well Fluid changed to Crude Oil |
2015-09-01 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-03-18 | Open Hole/Barefoot Completion | 1988.20 | 2001.00 | 0 |
1984-07-20 | Open Hole/Barefoot Completion | 1988.20 | 2027.00 | 0 |
1985-09-22 | Open Hole/Barefoot Completion | 1988.20 | 2035.00 | 0 |
1985-09-24 | Cement Squeeze | 1988.20 | 2035.00 | 0 |
1985-09-28 | Perforation | 1988.70 | 1989.20 | 7 |
1985-09-28 | Acid Treatment | 1988.70 | 1989.20 | 0 |
1986-06-06 | Perforation | 1992.20 | 1992.70 | 7 |
1986-06-07 | Acid Treatment | 1988.70 | 1992.70 | 0 |
1988-05-19 | Cement Squeeze | 1988.70 | 1992.70 | 0 |
1988-05-23 | Perforation | 1996.90 | 1997.90 | 13 |
1988-05-24 | Acid Treatment | 1996.90 | 1997.90 | 0 |
1990-02-12 | Perforation | 2001.00 | 2002.00 | 20 |
1990-02-12 | Perforation | 2005.50 | 2006.50 | 20 |
1990-02-13 | Acid Treatment | 2005.50 | 2006.50 | 0 |
1990-02-14 | Acid Treatment | 2001.00 | 2002.00 | 0 |
1990-02-14 | Cement Squeeze | 1996.90 | 1997.90 | 0 |
1996-09-01 | Perforation | 2010.00 | 2010.90 | 20 |
1996-09-01 | Acid Treatment | 2010.00 | 2010.90 | 0 |
2014-09-10 | Perforation | 1317.30 | 1318.30 | 17 |
2014-09-10 | Perforation | 1262.20 | 1262.30 | 17 |
2014-09-10 | Perforation | 721.00 | 722.00 | 17 |
2014-09-10 | Perforation | 469.40 | 470.40 | 17 |
2014-09-18 | Remedial Casing Cementing | 469.40 | 1318.30 | 0 |
2014-09-18 | Cement Plug | 460.70 | 1978.00 | 0 |
2014-09-20 | Perforation | 447.00 | 448.00 | 17 |
2014-09-20 | Perforation | 405.00 | 406.00 | 17 |
2014-09-20 | Perforation | 325.00 | 326.00 | 17 |
2014-09-20 | Perforation | 258.00 | 259.00 | 17 |
2014-09-20 | Perforation | 198.00 | 199.00 | 17 |
2014-09-21 | Remedial Casing Cementing | 198.00 | 448.00 | 0 |
2014-09-21 | Cement Plug | 182.20 | 460.00 | 0 |
2014-09-21 | Cement Plug | 162.00 | 182.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 2222 | 0.0 | 0.0 | 0.0 |
1986 | 2314 | 0.0 | 0.0 | 0.0 |
1987 | 786 | 0.0 | 0.0 | 0.0 |
1988 | 2852 | 0.0 | 0.0 | 0.0 |
1989 | 6366 | 0.0 | 0.0 | 0.0 |
1990 | 6958 | 0.0 | 0.0 | 0.0 |
1991 | 4192 | 0.0 | 0.0 | 0.0 |
1992 | 5067 | 0.0 | 0.0 | 0.0 |
1993 | 3004 | 0.0 | 0.0 | 0.0 |
1994 | 3817 | 0.0 | 0.0 | 0.0 |
1995 | 7333 | 0.0 | 0.0 | 0.0 |
1996 | 6130 | 0.0 | 0.0 | 0.0 |
1997 | 1684 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-09-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]