If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475170106003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.021946,"lon":-116.356779,"icon":""}]} |
Location: 00/06-01-047-17W5/3 | |
Location Alias: 00/06-01-47-17 W5M | |
Location Alias 2: 00/06-01-047-17 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 17 | |
Section: 01 | |
County/Municipality: Yellowhead County | |
Well Name: Canlin HANLAN 6-1-47-17 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0067295 | |
License Date: 1977-12-07 | |
License Status: Issued | |
Spud Date: 1977-12-28 | |
Final Drill Date: 1982-03-24 | |
Well Total Depth: 4636.80 m | |
Surface Hole Latitude: 53.021946 | |
Surface Hole Longitude: -116.356779 |
Date | Event |
---|---|
1977-12-07 | Obtained License |
1979-01-26 | Perforation Treatment Performed - Jet Perforation |
1979-01-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-01-27 | Perforation Treatment Performed - Cement Squeeze |
1979-01-27 | Perforation Treatment Performed - Jet Perforation |
1979-01-28 | Perforation Treatment Performed - Cement Squeeze |
1979-01-31 | Perforation Treatment Performed - Jet Perforation |
1979-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-02-04 | Perforation Treatment Performed - Fractured |
1979-02-11 | Perforation Treatment Performed - Cement Squeeze |
1979-02-18 | Perforation Treatment Performed - Cement Squeeze |
1981-12-22 | Perforation Treatment Performed - Open-Hole Completion |
1981-12-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-02-19 | Perforation Treatment Performed - Fractured |
1982-03-24 | Finished Drilling |
1982-03-24 | Perforation Treatment Performed - Open-Hole Completion |
1982-03-24 | Well Mode changed to Drilled and Cased |
1982-03-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-03-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-08-29 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1989-08-29 | Well Log Performed |
1989-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-02-29 | Well Log Performed |
2004-05-18 | Well Log Performed |
2004-05-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-05-19 | Plug Back Performed |
2004-05-19 | Well Log Performed |
2004-05-24 | Perforation Treatment Performed - Jet Perforation |
2004-05-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-05-28 | Well Log Performed |
2004-07-01 | Well Began Production |
2004-07-01 | Well Fluid changed to Gas |
2004-07-01 | Well Mode changed to Flowing |
2007-07-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-01-01 | Well Fluid changed to Gas |
2018-01-01 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-01-26 | Perforation | 2775.00 | 2775.60 | 13 |
1979-02-04 | Fracture | 2756.90 | 2764.20 | 0 |
1979-02-11 | Cement Squeeze | 2756.90 | 2764.20 | 0 |
1979-02-18 | Cement Squeeze | 2756.90 | 2775.60 | 0 |
1981-12-22 | Open Hole/Barefoot Completion | 4456.00 | 4634.10 | 0 |
1981-12-27 | Acid Treatment | 4456.00 | 4634.10 | 0 |
1982-02-19 | Fracture | 4456.00 | 4634.10 | 0 |
1982-03-24 | Open Hole/Barefoot Completion | 4456.00 | 4636.80 | 0 |
1982-03-25 | Acid Treatment | 4456.00 | 4636.80 | 0 |
1982-03-26 | Acid Treatment | 4456.00 | 4636.80 | 0 |
1989-08-29 | Casing Patch | 2756.90 | 2761.50 | 0 |
1979-01-27 | Perforation | 2745.00 | 2745.60 | 13 |
1989-09-28 | Acid Treatment | 4456.00 | 4636.80 | 0 |
2004-05-19 | Packing Device Capped w/Cement | 4239.60 | 4247.50 | 0 |
2004-05-24 | Perforation | 4206.50 | 4209.50 | 13 |
2004-05-24 | Perforation | 4212.50 | 4218.50 | 13 |
2004-05-26 | Acid Treatment | 4206.50 | 4209.50 | 0 |
2004-05-26 | Acid Treatment | 4212.00 | 4218.50 | 0 |
2007-07-13 | Acid Treatment | 4206.50 | 4209.50 | 0 |
2007-07-13 | Acid Treatment | 4212.50 | 4218.50 | 0 |
1979-01-27 | Acid Treatment | 2745.00 | 2745.60 | 0 |
1979-01-27 | Cement Squeeze | 2775.00 | 2775.60 | 0 |
1979-01-28 | Cement Squeeze | 2745.00 | 2745.60 | 0 |
1979-01-31 | Perforation | 2756.90 | 2758.80 | 13 |
1979-01-31 | Perforation | 2760.00 | 2761.50 | 13 |
1979-01-31 | Perforation | 2762.70 | 2764.20 | 13 |
1979-02-01 | Acid Treatment | 2756.90 | 2764.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 3912 | 0.0 | 0.0 | 0.0 |
2005 | 8415 | 0.0 | 0.0 | 0.0 |
2006 | 8122 | 0.0 | 0.0 | 0.0 |
2007 | 8542 | 0.0 | 0.0 | 0.0 |
2008 | 8202 | 0.0 | 0.0 | 0.0 |
2009 | 8420 | 0.0 | 0.0 | 0.0 |
2010 | 7584 | 0.0 | 0.0 | 0.0 |
2011 | 7496 | 0.0 | 0.0 | 0.0 |
2012 | 8592 | 0.0 | 0.0 | 0.0 |
2013 | 8067 | 0.0 | 0.0 | 0.0 |
2014 | 8501 | 0.0 | 0.0 | 0.0 |
2015 | 7865 | 0.0 | 0.0 | 0.0 |
2016 | 6943 | 0.0 | 0.0 | 0.0 |
2017 | 6528 | 0.0 | 0.0 | 0.0 |
2018 | 3384 | 0.0 | 0.0 | 0.0 |
2019 | 5880 | 0.0 | 0.0 | 0.0 |
2020 | 1991 | 0.0 | 0.0 | 0.0 |
For data sources see[5]