X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0475141211000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0475141211000
 
| Well ID: 0475141211000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.041304, -115.918746 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.041304, -115.918746 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/11-12-047-14W5/0
 
| Location: 00/11-12-047-14W5/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/11-12-047-14 W5/00
 
| Location Alias 2: 00/11-12-047-14 W5/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 047
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 14
 +
|-
 +
| Section: 12
 
|-
 
|-
 
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
 
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
Line 17: Line 27:
 
| Well Name: BOULDER BRAZR 11-12-47-14
 
| Well Name: BOULDER BRAZR 11-12-47-14
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Boulder Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0092770
 
| License Number: 0092770
Line 29: Line 39:
 
| Final Drill Date: 1981-12-14
 
| Final Drill Date: 1981-12-14
 
|-
 
|-
| Well Total Depth: 3777 m
+
| Well Total Depth: 3777.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.041304
 
| Surface Hole Latitude: 53.041304
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1981-10-16
 +
| Obtained License
 +
|-
 +
| 1981-11-12
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-11-29
 +
| Well Log Performed
 +
|-
 +
| 1981-12-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-12-06
 +
| Production Casing Operation Performed
 +
|-
 +
| 1981-12-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-12-14
 +
| Finished Drilling
 +
|-
 +
| 1981-12-14
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1981-12-15
 +
| Well Log Performed
 +
|-
 +
| 1981-12-18
 +
| Drill Stem Test Performed
 +
|-
 +
| 1982-02-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-02-16
 +
| Well Log Performed
 +
|-
 +
| 1982-02-17
 +
| Well Log Performed
 +
|-
 +
| 1982-02-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1982-02-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-02-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1982-02-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1982-02-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1982-02-23
 +
| Well Began Production
 +
|-
 +
| 1982-02-23
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1982-02-23
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1984-06-28
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1987-03-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-03-28
 +
| Well Log Performed
 +
|-
 +
| 1987-03-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-03-31
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1987-04-03
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1987-04-04
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1987-04-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1987-04-04
 +
| Plug Back Performed
 +
|-
 +
| 1987-04-04
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1987-04-04
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1987-04-06
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1987-04-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-04-09
 +
| Well Log Performed
 +
|-
 +
| 1987-04-11
 +
| Well Log Performed
 +
|-
 +
| 1987-04-23
 +
| Well Log Performed
 +
|-
 +
| 1987-04-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-04-30
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1987-05-05
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1987-09-13
 +
| Well Log Performed
 +
|-
 +
| 1997-05-18
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1998-10-29
 +
| Well Log Performed
 +
|-
 +
| 2004-05-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2004-07-20
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2004-12-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 234:
 
| 1982-02-16
 
| 1982-02-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3149
+
| style="text-align: right;" | 3149.00
| style="text-align: right;" | 3153
+
| style="text-align: right;" | 3153.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1982-02-16
 
| 1982-02-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3140.5
+
| style="text-align: right;" | 3140.50
| style="text-align: right;" | 3142
+
| style="text-align: right;" | 3142.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1982-02-18
 
| 1982-02-18
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 3126
+
| style="text-align: right;" | 3126.00
| style="text-align: right;" | 3134
+
| style="text-align: right;" | 3134.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-02-19
 
| 1982-02-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3040
+
| style="text-align: right;" | 3040.00
| style="text-align: right;" | 3045
+
| style="text-align: right;" | 3045.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1982-02-20
 
| 1982-02-20
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3040
+
| style="text-align: right;" | 3040.00
| style="text-align: right;" | 3045
+
| style="text-align: right;" | 3045.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-02-21
 
| 1982-02-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 3026
+
| style="text-align: right;" | 3026.00
| style="text-align: right;" | 3034
+
| style="text-align: right;" | 3034.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1982-02-23
 
| 1982-02-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2454.5
+
| style="text-align: right;" | 2454.50
| style="text-align: right;" | 2455.5
+
| style="text-align: right;" | 2455.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1982-02-23
 
| 1982-02-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2457
+
| style="text-align: right;" | 2457.00
| style="text-align: right;" | 2459
+
| style="text-align: right;" | 2459.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-06-28
 
| 1984-06-28
| Fracture  
+
| Fracture
| style="text-align: right;" | 2454.5
+
| style="text-align: right;" | 2454.50
| style="text-align: right;" | 2459
+
| style="text-align: right;" | 2459.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-03-28
 
| 1987-03-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3040
+
| style="text-align: right;" | 3040.00
| style="text-align: right;" | 3045
+
| style="text-align: right;" | 3045.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1987-03-29
 
| 1987-03-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3140.5
+
| style="text-align: right;" | 3140.50
| style="text-align: right;" | 3142
+
| style="text-align: right;" | 3142.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1987-03-29
 
| 1987-03-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3149
+
| style="text-align: right;" | 3149.00
| style="text-align: right;" | 3153
+
| style="text-align: right;" | 3153.00
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1987-03-31
 
| 1987-03-31
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 3040
+
| style="text-align: right;" | 3040.00
| style="text-align: right;" | 3045
+
| style="text-align: right;" | 3045.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-04-03
 
| 1987-04-03
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 3589
+
| style="text-align: right;" | 3589.00
| style="text-align: right;" | 3670
+
| style="text-align: right;" | 3670.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-04-04
 
| 1987-04-04
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2454.5
+
| style="text-align: right;" | 2454.50
| style="text-align: right;" | 3670
+
| style="text-align: right;" | 3670.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-04-06
 
| 1987-04-06
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 3670
+
| style="text-align: right;" | 3670.00
| style="text-align: right;" | 3725
+
| style="text-align: right;" | 3725.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-04-09
 
| 1987-04-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 3680
+
| style="text-align: right;" | 3680.00
| style="text-align: right;" | 3691
+
| style="text-align: right;" | 3691.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-04-25
 
| 1987-04-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 972
+
| style="text-align: right;" | 972.00
| style="text-align: right;" | 972.8
+
| style="text-align: right;" | 972.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-04-30
 
| 1987-04-30
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 972
+
| style="text-align: right;" | 972.00
| style="text-align: right;" | 972.8
+
| style="text-align: right;" | 972.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-05-05
 
| 1987-05-05
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3670
+
| style="text-align: right;" | 3670.00
| style="text-align: right;" | 3725
+
| style="text-align: right;" | 3725.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-05-18
 
| 1997-05-18
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3670
+
| style="text-align: right;" | 3670.00
| style="text-align: right;" | 3710
+
| style="text-align: right;" | 3710.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-05-22
 
| 2004-05-22
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3670
+
| style="text-align: right;" | 3670.00
| style="text-align: right;" | 3725
+
| style="text-align: right;" | 3725.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-07-20
 
| 2004-07-20
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3670
+
| style="text-align: right;" | 3670.00
| style="text-align: right;" | 3725
+
| style="text-align: right;" | 3725.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-12-28
 
| 2004-12-28
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 3670
+
| style="text-align: right;" | 3670.00
| style="text-align: right;" | 3725
+
| style="text-align: right;" | 3725.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 220: Line 380:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 253: Line 427:
 
| 1982
 
| 1982
 
| style="text-align: right;" | 2151
 
| style="text-align: right;" | 2151
| style="text-align: right;" | 766.8
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 259: Line 433:
 
| 1983
 
| 1983
 
| style="text-align: right;" | 2259
 
| style="text-align: right;" | 2259
| style="text-align: right;" | 463.0
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 265: Line 439:
 
| 1984
 
| 1984
 
| style="text-align: right;" | 4207
 
| style="text-align: right;" | 4207
| style="text-align: right;" | 1825.0
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 10.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1985
 
| 1985
 
| style="text-align: right;" | 2812
 
| style="text-align: right;" | 2812
| style="text-align: right;" | 1804.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1986
 
| 1986
 
| style="text-align: right;" | 3981
 
| style="text-align: right;" | 3981
| style="text-align: right;" | 1708.0
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2.6
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1987
 
| 1987
 
| style="text-align: right;" | 998
 
| style="text-align: right;" | 998
| style="text-align: right;" | 497.3
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 0.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 291: Line 465:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 04:36, 10 July 2020

Well Details

Well ID: 0475141211000
Loading map...
Location: 00/11-12-047-14W5/0
Location Alias: 00/11-12-47-14 W5M
Location Alias 2: 00/11-12-047-14 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 14
Section: 12
County/Municipality: Yellowhead County
Well Name: BOULDER BRAZR 11-12-47-14
Operator Name: Boulder Energy Ltd.
License Number: 0092770
License Date: 1981-10-16
License Status: Suspension
Spud Date: 1981-10-24
Final Drill Date: 1981-12-14
Well Total Depth: 3777.00 m
Surface Hole Latitude: 53.041304
Surface Hole Longitude: -115.918746

For data sources see[1][2]

Well History

Date Event
1981-10-16 Obtained License
1981-11-12 Drill Stem Test Performed
1981-11-29 Well Log Performed
1981-12-02 Drill Stem Test Performed
1981-12-06 Production Casing Operation Performed
1981-12-11 Drill Stem Test Performed
1981-12-14 Finished Drilling
1981-12-14 Well Mode changed to Drilled and Cased
1981-12-15 Well Log Performed
1981-12-18 Drill Stem Test Performed
1982-02-16 Perforation Treatment Performed - Jet Perforation
1982-02-16 Well Log Performed
1982-02-17 Well Log Performed
1982-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-19 Perforation Treatment Performed - Jet Perforation
1982-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-23 Perforation Treatment Performed - Jet Perforation
1982-02-23 Well Began Production
1982-02-23 Well Fluid changed to Crude Oil
1982-02-23 Well Mode changed to Flowing
1984-06-28 Perforation Treatment Performed - Fractured
1987-03-28 Perforation Treatment Performed - Jet Perforation
1987-03-28 Well Log Performed
1987-03-29 Perforation Treatment Performed - Jet Perforation
1987-03-31 Perforation Treatment Performed - Cement Squeeze
1987-04-03 Perforation Treatment Performed - Open-Hole Completion
1987-04-04 Liner Casing Operation Performed
1987-04-04 Perforation Treatment Performed - Cement Squeeze
1987-04-04 Plug Back Performed
1987-04-04 Well Fluid changed to Crude Oil
1987-04-04 Well Mode changed to Abandoned Zone
1987-04-06 Perforation Treatment Performed - Open-Hole Completion
1987-04-09 Perforation Treatment Performed - Jet Perforation
1987-04-09 Well Log Performed
1987-04-11 Well Log Performed
1987-04-23 Well Log Performed
1987-04-25 Perforation Treatment Performed - Jet Perforation
1987-04-30 Perforation Treatment Performed - Remedial Casing
1987-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-13 Well Log Performed
1997-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-29 Well Log Performed
2004-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-16 Perforation 3149.00 3153.00 3
1982-02-16 Perforation 3140.50 3142.00 3
1982-02-18 Packing Device Capped w/Cement 3126.00 3134.00 0
1982-02-19 Perforation 3040.00 3045.00 7
1982-02-20 Acid Treatment 3040.00 3045.00 0
1982-02-21 Packing Device Capped w/Cement 3026.00 3034.00 0
1982-02-23 Perforation 2454.50 2455.50 13
1982-02-23 Perforation 2457.00 2459.00 13
1984-06-28 Fracture 2454.50 2459.00 0
1987-03-28 Perforation 3040.00 3045.00 7
1987-03-29 Perforation 3140.50 3142.00 3
1987-03-29 Perforation 3149.00 3153.00 3
1987-03-31 Cement Squeeze 3040.00 3045.00 0
1987-04-03 Open Hole/Barefoot Completion 3589.00 3670.00 0
1987-04-04 Cement Squeeze 2454.50 3670.00 0
1987-04-06 Open Hole/Barefoot Completion 3670.00 3725.00 0
1987-04-09 Perforation 3680.00 3691.00 13
1987-04-25 Perforation 972.00 972.80 13
1987-04-30 Remedial Casing Cementing 972.00 972.80 0
1987-05-05 Acid Treatment 3670.00 3725.00 0
1997-05-18 Acid Treatment 3670.00 3710.00 0
2004-05-22 Acid Treatment 3670.00 3725.00 0
2004-07-20 Acid Treatment 3670.00 3725.00 0
2004-12-28 Acid Treatment 3670.00 3725.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2151 0.0 0.0 0.0
1983 2259 0.0 0.0 0.0
1984 4207 0.0 0.0 0.0
1985 2812 0.0 0.0 0.0
1986 3981 0.0 0.0 0.0
1987 998 0.0 0.0 0.0

For data sources see[5]

References