X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475110415000

Well Details

Well ID: 0475110415000
Loading map...
Location: 00/15-04-047-11W5/0
Location Alias: 00/15-04-47-11 W5M
Location Alias 2: 00/15-04-047-11 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 11
Section: 04
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ BRAZR 15-4-47-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0441394
License Date: 2011-12-15
License Status: Issued
Spud Date: 2012-01-09
Final Drill Date: 2012-01-23
Well Total Depth: 3461.00 m
Surface Hole Latitude: 53.019456
Surface Hole Longitude: -115.539584

For data sources see[1][2]

Well History

Date Event
2011-12-15 Obtained License
2012-01-11 Surface Casing Operation Performed
2012-01-14 Direction Drilling Operation Performed - Horizontal
2012-01-23 Finished Drilling
2012-01-23 Well Log Performed
2012-01-23 Well Mode changed to Drilled and Cased
2012-01-26 Intermediate Casing Operation Performed
2012-01-26 Liner Casing Operation Performed
2012-01-26 Rig Released
2012-02-09 Well Log Performed
2012-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-28 Perforation Treatment Performed - Open-Hole Completion
2012-02-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-01 Well Began Production
2012-03-01 Well Fluid changed to Crude Oil
2012-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-09 Nabors Drilling Limited 31 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-14 1688.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-28 Open Hole/Barefoot Completion 3456.00 3461.00 0
2012-02-29 Multi-Stage Fracture 2851.00 2851.10 0
2012-02-29 Multi-Stage Fracture 2781.40 2781.50 0
2012-02-29 Multi-Stage Fracture 2711.00 2711.10 0
2012-02-29 Multi-Stage Fracture 2627.50 2627.60 0
2012-02-29 Multi-Stage Fracture 2557.60 2557.70 0
2012-02-29 Multi-Stage Fracture 2486.50 2486.60 0
2012-02-29 Multi-Stage Fracture 2417.20 2417.30 0
2012-02-29 Multi-Stage Fracture 2347.00 2347.10 0
2012-02-29 Multi-Stage Fracture 2274.60 2274.70 0
2012-02-29 Multi-Stage Fracture 2202.30 2202.40 0
2012-02-28 Multi-Stage Fracture 3420.10 3420.20 0
2012-02-29 Multi-Stage Fracture 2132.40 2132.50 0
2012-02-28 Multi-Stage Fracture 3356.50 3356.60 0
2012-02-28 Multi-Stage Fracture 3287.30 3287.40 0
2012-02-28 Multi-Stage Fracture 3203.40 3203.50 0
2012-02-28 Multi-Stage Fracture 3135.20 3135.30 0
2012-02-28 Multi-Stage Fracture 3065.50 3065.60 0
2012-02-28 Multi-Stage Fracture 2994.50 2994.60 0
2012-02-28 Multi-Stage Fracture 2922.80 2922.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6430 0.0 0.0 0.0
2013 8275 0.0 0.0 0.0
2014 7850 0.0 0.0 0.0
2015 6525 0.0 0.0 0.0
2016 8429 0.0 0.0 0.0
2017 8233 0.0 0.0 0.0
2018 8188 0.0 0.0 0.0
2019 8606 0.0 0.0 0.0
2020 1776 0.0 0.0 0.0

For data sources see[7]

References