X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475093313000

Well Details

Well ID: 0475093313000
Loading map...
Location: 00/13-33-047-09W5/0
Location Alias: 00/13-33-47-09 W5M
Location Alias 2: 00/13-33-047-09 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 09
Section: 33
County/Municipality: Brazeau County
Well Name: PENN WEST PEMBINA 13-33-47-9
Operator Name: Obsidian Energy Ltd.
License Number: 0418251
License Date: 2010-02-02
License Status: Issued
Spud Date: 2010-02-17
Final Drill Date: 2010-02-28
Well Total Depth: 2785.00 m
Surface Hole Latitude: 53.096405
Surface Hole Longitude: -115.257365

For data sources see[1][2]

Well History

Date Event
2010-02-02 Obtained License
2010-02-10 Well Log Performed
2010-02-18 Surface Casing Operation Performed
2010-02-20 Direction Drilling Operation Performed - Horizontal
2010-02-22 Well Log Performed
2010-02-23 Intermediate Casing Operation Performed
2010-02-28 Finished Drilling
2010-02-28 Well Log Performed
2010-02-28 Well Mode changed to Drilled and Cased
2010-03-01 Liner Casing Operation Performed
2010-03-02 Rig Released
2010-03-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-10 Perforation Treatment Performed - Fractured
2010-03-11 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-11 Perforation Treatment Performed - Fractured
2010-03-12 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-12 Perforation Treatment Performed - Fractured
2010-03-13 Well Log Performed
2010-03-20 Well Log Performed
2010-03-21 Perforation Treatment Performed - Fractured
2010-03-21 Perforation Treatment Performed - Jet Perforation
2010-03-22 Perforation Treatment Performed - Fractured
2010-03-22 Perforation Treatment Performed - Jet Perforation
2010-03-22 Well Log Performed
2010-03-23 Perforation Treatment Performed - Fractured
2010-03-23 Perforation Treatment Performed - Jet Perforation
2010-03-31 Well Log Performed
2010-05-01 Well Began Production
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-20 1377.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-10 Hydra Jet Perforation 2749.90 2750.10 1
2010-03-10 Fracture 2749.90 2750.10 0
2010-03-11 Hydra Jet Perforation 2654.90 2655.10 1
2010-03-11 Fracture 2654.90 2655.10 0
2010-03-12 Hydra Jet Perforation 2513.90 2514.10 1
2010-03-12 Fracture 2513.90 2514.10 0
2010-03-21 Perforation 2380.00 2380.50 17
2010-03-21 Fracture 2380.00 2380.50 0
2010-03-22 Perforation 2300.00 2300.50 17
2010-03-22 Fracture 2300.00 2300.50 0
2010-03-22 Perforation 2220.00 2220.50 17
2010-03-22 Fracture 2220.00 2220.50 0
2010-03-22 Perforation 2140.00 2140.50 17
2010-03-22 Fracture 2140.00 2140.50 0
2010-03-22 Perforation 2060.00 2060.50 17
2010-03-22 Fracture 2060.00 2060.50 0
2010-03-23 Perforation 1980.00 1980.50 17
2010-03-23 Fracture 1980.00 1980.50 0
2010-03-23 Perforation 1900.00 1900.50 17
2010-03-23 Fracture 1900.00 1900.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5592 0.0 0.0 0.0
2011 8600 0.0 0.0 0.0
2012 8308 0.0 0.0 0.0
2013 8451 0.0 0.0 0.0
2014 8735 0.0 0.0 0.0
2015 8634 0.0 0.0 0.0
2016 8771 0.0 0.0 0.0
2017 8511 0.0 0.0 0.0
2018 8295 0.0 0.0 0.0
2019 8685 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References