X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475052701000

Well Details

Well ID: 0475052701000
Loading map...
Location: 00/01-27-047-05W5/0
Location Alias: 00/01-27-47-05 W5M
Location Alias 2: 00/01-27-047-05 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 05
Section: 27
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 1-27-47-5
Operator Name: Bonterra Energy Corp.
License Number: 0483823
License Date: 2017-06-02
License Status: Issued
Spud Date: 2018-01-04
Final Drill Date: 2018-01-09
Well Total Depth: 3016.00 m
Surface Hole Latitude: 53.079331
Surface Hole Longitude: -114.662210

For data sources see[1][2]

Well History

Date Event
2017-06-02 Obtained License
2018-01-04 Surface Casing Operation Performed
2018-01-05 Direction Drilling Operation Performed - Deviate
2018-01-07 Direction Drilling Operation Performed - Horizontal
2018-01-09 Finished Drilling
2018-01-09 Well Log Performed
2018-01-09 Well Mode changed to Drilled and Cased
2018-01-10 Production Casing Operation Performed
2018-01-10 Rig Released
2018-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-25 Well Began Production
2018-01-25 Well Fluid changed to Crude Oil
2018-01-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-04 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-05 1053.60 Deviate (5 - 79 degrees)
2018-01-07 1580.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-16 Multi-Stage Fracture 2979.80 2980.40 0
2018-01-16 Multi-Stage Fracture 2529.00 2531.00 0
2018-01-16 Multi-Stage Fracture 2478.40 2480.40 0
2018-01-16 Multi-Stage Fracture 2428.10 2430.00 0
2018-01-16 Multi-Stage Fracture 2377.60 2379.50 0
2018-01-16 Multi-Stage Fracture 2327.00 2328.90 0
2018-01-16 Multi-Stage Fracture 2277.10 2279.00 0
2018-01-16 Multi-Stage Fracture 2226.60 2228.60 0
2018-01-16 Multi-Stage Fracture 2175.90 2177.90 0
2018-01-16 Multi-Stage Fracture 2125.80 2127.70 0
2018-01-16 Multi-Stage Fracture 2075.40 2077.30 0
2018-01-16 Multi-Stage Fracture 2930.70 2932.70 0
2018-01-16 Multi-Stage Fracture 2025.10 2027.00 0
2018-01-16 Multi-Stage Fracture 1974.90 1976.80 0
2018-01-16 Multi-Stage Fracture 1924.40 1926.30 0
2018-01-16 Multi-Stage Fracture 1874.50 1876.40 0
2018-01-16 Multi-Stage Fracture 1823.60 1825.60 0
2018-01-16 Multi-Stage Fracture 1772.90 1774.90 0
2018-01-16 Multi-Stage Fracture 1722.90 1724.90 0
2018-01-16 Multi-Stage Fracture 1672.20 1674.20 0
2018-01-16 Multi-Stage Fracture 1622.00 1623.90 0
2018-01-16 Multi-Stage Fracture 2880.30 2882.30 0
2018-01-16 Multi-Stage Fracture 2829.60 2831.50 0
2018-01-16 Multi-Stage Fracture 2779.50 2781.40 0
2018-01-16 Multi-Stage Fracture 2729.10 2731.00 0
2018-01-16 Multi-Stage Fracture 2679.00 2681.00 0
2018-01-16 Multi-Stage Fracture 2629.00 2630.90 0
2018-01-16 Multi-Stage Fracture 2578.90 2580.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-16 2018-01-16 1,415 2,385 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.8612 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 10.7423 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 5.1974 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0199 N/A
dibromoacetonitrile 3252-43-5 100 0.0199 N/A
non-hazardous ingredients Not Available 100 0.0199 N/A
polyethylene glycol 25322-68-3 100 0.0199 N/A
sodium bromide 7647-15-6 100 0.0199 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0895 N/A
water Not Available 100 0.0895 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0427 N/A
propylene glycol 57-55-6 100 0.0427 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0465 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0465 N/A
non-hazardous ingredients Not Available 100 0.0465 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-09 2018-01-14 Surface Water - Runoff 4158

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 8139 0.0 0.0 0.0
2019 8341 0.0 0.0 0.0
2020 2077 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-10 No Incident Encountered 0.00 0.00
2018-01-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References