X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0475052210002"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0475052210002
 
| Well ID: 0475052210002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.0714680000000385, -114.64361599999995178 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.071468, -114.643616 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-22-047-05W5/2
 
| Location: 00/10-22-047-05W5/2
 +
|-
 +
| Location Alias: 00/10-22-47-05 W5M
 +
|-
 +
| Location Alias 2: 00/10-22-047-05 W5/02
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Brazeau County,_Alberta|Brazeau County]]
 
|-
 
|-
 
| Well Name: ALTEX ET AL PEMBINA 10-22-47-5
 
| Well Name: ALTEX ET AL PEMBINA 10-22-47-5
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0076374
 
|-
 
|-
 
| License Date: 1979-06-14
 
| License Date: 1979-06-14
 
|-
 
|-
| Final Drilling Date: 1979-07-22
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1979-07-08
 +
|-
 +
| Final Drill Date: 1979-07-22
 +
|-
 +
| Well Total Depth: 1961 m
 +
|-
 +
| Surface Hole Latitude: 53.071468
 +
|-
 +
| Surface Hole Longitude: -114.643616
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
| Total Depth: 1961.0m
+
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1979-09-03
 +
| Perforation
 +
| style="text-align: right;" | 1930
 +
| style="text-align: right;" | 1933
 +
| style="text-align: right;" | 9
 
|-
 
|-
| Status: Abandoned
+
| 1979-09-05
 +
| Acid Treatment
 +
| style="text-align: right;" | 1930
 +
| style="text-align: right;" | 1933
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 1990-07-03
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1912
 +
| style="text-align: right;" | 1920
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 1990-07-08
 +
| Perforation
 +
| style="text-align: right;" | 1407
 +
| style="text-align: right;" | 1409
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Latitude: 53.0714680000000385
+
| 1990-07-11
 +
| Fracture
 +
| style="text-align: right;" | 1407
 +
| style="text-align: right;" | 1409
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -114.64361599999995178
+
| 1995-12-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1387
 +
| style="text-align: right;" | 1395
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 1995-12-16
 +
| Perforation
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1995-12-16
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995-12-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 346.7
 +
| style="text-align: right;" | 355.7
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1990
 +
| style="text-align: right;" | 3596
 +
| style="text-align: right;" | 21.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1991
 +
| style="text-align: right;" | 5862
 +
| style="text-align: right;" | 23.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1992
 +
| style="text-align: right;" | 3631
 +
| style="text-align: right;" | 4.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1993
 +
| style="text-align: right;" | 4953
 +
| style="text-align: right;" | 6.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 09:48, 9 June 2019

Well Details

Well ID: 0475052210002
Loading map...
Location: 00/10-22-047-05W5/2
Location Alias: 00/10-22-47-05 W5M
Location Alias 2: 00/10-22-047-05 W5/02
Province: Alberta
County/Municipality: Brazeau County
Well Name: ALTEX ET AL PEMBINA 10-22-47-5
Operator Name:
License Number: 0076374
License Date: 1979-06-14
License Status: RecCertified
Spud Date: 1979-07-08
Final Drill Date: 1979-07-22
Well Total Depth: 1961 m
Surface Hole Latitude: 53.071468
Surface Hole Longitude: -114.643616

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-03 Perforation 1930 1933 9
1979-09-05 Acid Treatment 1930 1933 0
1990-07-03 Packing Device Capped w/Cement 1912 1920 0
1990-07-08 Perforation 1407 1409 13
1990-07-11 Fracture 1407 1409 0
1995-12-16 Packing Device Capped w/Cement 1387 1395 0
1995-12-16 Perforation 360 361 14
1995-12-16 Remedial Casing Cementing 360 361 0
1995-12-17 Packing Device Capped w/Cement 346.7 355.7 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3596 21.2 0.0 0.0
1991 5862 23.0 0.0 0.0
1992 3631 4.7 0.0 0.0
1993 4953 6.1 0.0 0.0

For data sources see[4]

References