X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475032104020

Well Details

Well ID: 0475032104020
Loading map...
Location: 02/04-21-047-03W5/0
Location Alias: 02/04-21-47-03 W5M
Location Alias 2: 02/04-21-047-03 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 03
Section: 21
County/Municipality: Leduc County
Well Name: DAYLIGHT ETAL 102 PEMBINA 4-21-47-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0428602
License Date: 2010-12-21
License Status: Amended
Spud Date: 2011-07-06
Final Drill Date: 2011-07-28
Well Total Depth: 2506.00 m
Surface Hole Latitude: 53.062182
Surface Hole Longitude: -114.363364

For data sources see[1][2]

Well History

Date Event
2010-12-21 Obtained License
2011-07-08 Surface Casing Operation Performed
2011-07-18 Direction Drilling Operation Performed - Horizontal
2011-07-19 Well Log Performed
2011-07-20 Intermediate Casing Operation Performed
2011-07-28 Finished Drilling
2011-07-28 Well Log Performed
2011-07-28 Well Mode changed to Drilled and Cased
2011-08-01 Liner Casing Operation Performed
2011-08-02 Rig Released
2011-08-10 Well Log Performed
2011-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-13 Perforation Treatment Performed - Open-Hole Completion
2011-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-21 Well Began Production
2011-08-21 Well Fluid changed to Crude Oil
2011-08-21 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-18 765.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-13 Open Hole/Barefoot Completion 2501.00 2506.00 0
2011-08-13 Multi-Stage Fracture 1815.60 1815.70 0
2011-08-13 Multi-Stage Fracture 1741.60 1741.70 0
2011-08-13 Multi-Stage Fracture 1662.00 1662.10 0
2011-08-13 Multi-Stage Fracture 1573.00 1573.10 0
2011-08-14 Multi-Stage Fracture 1485.10 1485.20 0
2011-08-14 Multi-Stage Fracture 1420.30 1420.40 0
2011-08-14 Multi-Stage Fracture 1318.80 1318.90 0
2011-08-14 Multi-Stage Fracture 1254.30 1254.40 0
2011-08-13 Multi-Stage Fracture 2479.20 2479.30 0
2011-08-13 Multi-Stage Fracture 2382.60 2382.70 0
2011-08-13 Multi-Stage Fracture 2302.90 2303.00 0
2011-08-13 Multi-Stage Fracture 2224.50 2224.60 0
2011-08-13 Multi-Stage Fracture 2145.10 2145.20 0
2011-08-13 Multi-Stage Fracture 2066.10 2066.20 0
2011-08-13 Multi-Stage Fracture 1985.60 1985.70 0
2011-08-13 Multi-Stage Fracture 1907.30 1907.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2858 0.0 0.0 0.0
2012 8686 0.0 0.0 0.0
2013 8363 0.0 0.0 0.0
2014 8694 0.0 0.0 0.0
2015 7505 0.0 0.0 0.0
2016 8755 0.0 0.0 0.0
2017 6563 0.0 0.0 0.0
2018 8429 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 576 0.0 0.0 0.0

For data sources see[6]

References