X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0474112203002

Well Details

Well ID: 0474112203002
Loading map...
Location: 00/03-22-047-11W4/2
Location Alias: 00/03-22-47-11 W4M
Location Alias 2: 00/03-22-047-11 W4/02
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 11
Section: 22
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 3-22-47-11
Operator Name: Pine Cliff Energy Ltd.
License Number: 0271513
License Date: 2002-07-04
License Status: Suspension
Spud Date: 2002-07-13
Final Drill Date: 2002-07-15
Well Total Depth: 836.00 m
Surface Hole Latitude: 53.062113
Surface Hole Longitude: -111.533743

For data sources see[1][2]

Well History

Date Event
2002-07-04 Obtained License
2002-07-13 Surface Casing Operation Performed
2002-07-14 Lost Circulation Occurred
2002-07-15 Finished Drilling
2002-07-15 Well Log Performed
2002-07-15 Well Mode changed to Drilled and Cased
2002-07-16 Production Casing Operation Performed
2002-07-16 Rig Released
2002-07-18 Well Log Performed
2002-07-26 Perforation Treatment Performed - Jet Perforation
2002-07-26 Well Log Performed
2002-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-28 Perforation Treatment Performed - Jet Perforation
2002-07-28 Plug Back Performed
2002-07-28 Well Log Performed
2002-09-26 Well Began Production
2002-09-26 Well Fluid changed to Gas
2002-09-26 Well Mode changed to Flowing
2013-09-27 Well Fluid changed to Gas
2013-09-27 Well Mode changed to Pumping
2017-07-30 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-26 Perforation 799.50 802.00 20
2002-07-27 Acid Treatment 799.50 802.00 0
2002-07-28 Perforation 724.00 725.00 20
2002-07-28 Packing Device Capped w/Cement 787.00 795.00 0
2017-07-30 Perforation 748.50 749.50 17
2017-07-30 Perforation 746.00 747.00 17
2017-07-30 Perforation 682.00 682.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2120 0.0 0.0 0.0
2003 8746 0.0 0.0 0.0
2004 8779 0.0 0.0 0.0
2005 8737 0.0 0.0 0.0
2006 8750 0.0 0.0 0.0
2007 8584 0.0 0.0 0.0
2008 8676 0.0 0.0 0.0
2009 6536 0.0 0.0 0.0
2010 7083 0.0 0.0 0.0
2011 8280 0.0 0.0 0.0
2012 8760 0.0 0.0 0.0
2013 8550 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7637 0.0 0.0 0.0
2018 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-07-14 Lost Circulation 803.00 805.00
2017-08-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References