X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465112709000

Well Details

Well ID: 0465112709000
Loading map...
Location: 00/09-27-046-11W5/0
Location Alias: 00/09-27-46-11 W5M
Location Alias 2: 00/09-27-046-11 W5/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 11
Section: 27
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ ET AL BRAZR 9-27-46-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0441419
License Date: 2011-12-15
License Status: Amended
Spud Date: 2012-02-24
Final Drill Date: 2012-03-02
Well Total Depth: 3326.00 m
Surface Hole Latitude: 52.999606
Surface Hole Longitude: -115.523437

For data sources see[1][2]

Well History

Date Event
2011-12-15 Obtained License
2012-02-24 Lost Circulation Occurred
2012-02-25 Surface Casing Operation Performed
2012-02-27 Direction Drilling Operation Performed - Horizontal
2012-02-28 Well Log Performed
2012-03-02 Finished Drilling
2012-03-02 Well Log Performed
2012-03-02 Well Mode changed to Drilled and Cased
2012-03-03 Production Casing Operation Performed
2012-03-03 Well Log Performed
2012-03-04 Rig Released
2012-05-03 Well Log Performed
2012-05-12 Well Began Production
2012-05-12 Well Fluid changed to Crude Oil
2012-05-12 Well Mode changed to Pumping
2012-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-18 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-24 Nabors Drilling Limited 26 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-27 1579.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-18 Open Hole/Barefoot Completion 3321.00 3326.00 0
2012-05-18 Multi-Stage Fracture 2845.30 2845.40 0
2012-05-18 Multi-Stage Fracture 2794.40 2794.50 0
2012-05-18 Multi-Stage Fracture 2733.40 2733.50 0
2012-05-18 Multi-Stage Fracture 2682.50 2682.60 0
2012-05-18 Multi-Stage Fracture 2630.80 2630.90 0
2012-05-18 Multi-Stage Fracture 2567.90 2568.00 0
2012-05-18 Multi-Stage Fracture 2516.50 2516.60 0
2012-05-18 Multi-Stage Fracture 2454.40 2454.50 0
2012-05-18 Multi-Stage Fracture 2404.50 2404.60 0
2012-05-18 Multi-Stage Fracture 2342.70 2342.80 0
2012-05-18 Multi-Stage Fracture 3298.20 3298.30 0
2012-05-18 Multi-Stage Fracture 2292.10 2292.20 0
2012-05-18 Multi-Stage Fracture 3240.70 3240.80 0
2012-05-18 Multi-Stage Fracture 3189.60 3189.70 0
2012-05-18 Multi-Stage Fracture 3127.10 3127.20 0
2012-05-18 Multi-Stage Fracture 3075.10 3075.20 0
2012-05-18 Multi-Stage Fracture 3023.20 3023.30 0
2012-05-18 Multi-Stage Fracture 2959.50 2959.60 0
2012-05-18 Multi-Stage Fracture 2907.50 2907.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4525 0.0 0.0 0.0
2013 8326 0.0 0.0 0.0
2014 8492 0.0 0.0 0.0
2015 8615 0.0 0.0 0.0
2016 8688 0.0 0.0 0.0
2017 8707 0.0 0.0 0.0
2018 8396 0.0 0.0 0.0
2019 1475 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-24 Lost Circulation 144.00 144.00
2012-05-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References