If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465093609020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.011989,"lon":-115.188511,"icon":""}]} |
Location: 02/09-36-046-09W5/0 | |
Location Alias: 02/09-36-46-09 W5M | |
Location Alias 2: 02/09-36-046-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 09 | |
Section: 36 | |
County/Municipality: Clearwater County | |
Well Name: BONTERRA 102 HZ PEMBINA 9-36-46-9 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0485068 | |
License Date: 2017-08-18 | |
License Status: Issued | |
Spud Date: 2017-11-02 | |
Final Drill Date: 2017-11-07 | |
Well Total Depth: 3274.00 m | |
Surface Hole Latitude: 53.011989 | |
Surface Hole Longitude: -115.188511 |
Date | Event |
---|---|
2017-08-18 | Obtained License |
2017-11-02 | Surface Casing Operation Performed |
2017-11-04 | Direction Drilling Operation Performed - Deviate |
2017-11-05 | Direction Drilling Operation Performed - Horizontal |
2017-11-07 | Finished Drilling |
2017-11-07 | Well Mode changed to Drilled and Cased |
2017-11-08 | Well Log Performed |
2017-11-09 | Production Casing Operation Performed |
2017-11-09 | Rig Released |
2017-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-30 | Well Began Production |
2017-11-30 | Well Fluid changed to Crude Oil |
2017-11-30 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-11-02 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-11-04 | 1438.10 | Deviate (5 - 79 degrees) |
2017-11-05 | 1820.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-11-21 | Multi-Stage Fracture | 3238.70 | 3239.20 | 0 |
2017-11-22 | Multi-Stage Fracture | 2788.40 | 2790.30 | 0 |
2017-11-22 | Multi-Stage Fracture | 2738.40 | 2740.30 | 0 |
2017-11-22 | Multi-Stage Fracture | 2687.90 | 2689.80 | 0 |
2017-11-22 | Multi-Stage Fracture | 2637.30 | 2639.30 | 0 |
2017-11-22 | Multi-Stage Fracture | 2586.90 | 2588.90 | 0 |
2017-11-22 | Multi-Stage Fracture | 2536.50 | 2538.40 | 0 |
2017-11-22 | Multi-Stage Fracture | 2486.30 | 2488.20 | 0 |
2017-11-22 | Multi-Stage Fracture | 2435.90 | 2437.80 | 0 |
2017-11-22 | Multi-Stage Fracture | 2385.70 | 2387.70 | 0 |
2017-11-22 | Multi-Stage Fracture | 2335.10 | 2337.00 | 0 |
2017-11-21 | Multi-Stage Fracture | 3190.00 | 3191.90 | 0 |
2017-11-22 | Multi-Stage Fracture | 2284.20 | 2286.10 | 0 |
2017-11-22 | Multi-Stage Fracture | 2233.20 | 2235.10 | 0 |
2017-11-22 | Multi-Stage Fracture | 2182.60 | 2184.50 | 0 |
2017-11-22 | Multi-Stage Fracture | 2132.10 | 2134.00 | 0 |
2017-11-22 | Multi-Stage Fracture | 2081.70 | 2083.60 | 0 |
2017-11-22 | Multi-Stage Fracture | 2031.50 | 2033.40 | 0 |
2017-11-22 | Multi-Stage Fracture | 1981.10 | 1983.10 | 0 |
2017-11-22 | Multi-Stage Fracture | 1930.80 | 1932.70 | 0 |
2017-11-22 | Multi-Stage Fracture | 1880.70 | 1882.60 | 0 |
2017-11-22 | Multi-Stage Fracture | 1841.60 | 1843.50 | 0 |
2017-11-21 | Multi-Stage Fracture | 3139.60 | 3141.50 | 0 |
2017-11-22 | Multi-Stage Fracture | 1802.50 | 1804.40 | 0 |
2017-11-21 | Multi-Stage Fracture | 3089.70 | 3091.60 | 0 |
2017-11-21 | Multi-Stage Fracture | 3039.10 | 3041.00 | 0 |
2017-11-21 | Multi-Stage Fracture | 2988.30 | 2990.30 | 0 |
2017-11-21 | Multi-Stage Fracture | 2938.40 | 2940.20 | 0 |
2017-11-21 | Multi-Stage Fracture | 2888.30 | 2890.20 | 0 |
2017-11-21 | Multi-Stage Fracture | 2838.60 | 2840.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-11-21 | 2017-11-22 | 1,699 | 4,023 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 86.4661 | N/A | |||
Sand - Tier 2 (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 12.6135 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 12.6135 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 12.6135 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 12.6135 | N/A | ||||
Sand - Tier 2 (30/50) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 0.3234 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.3234 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.3234 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.3234 | N/A | ||||
DF-2W (Winterized Defoamer) | Trican Well Service | Acid | non-hazardous ingredients | Not Available | 100 | 0 | N/A | |
propylene glycol | 57-55-6 | 100 | 0 | N/A | ||||
HCL 15% | Canyon Technical Services | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.4056 | N/A | |
Water | 7732-18-5 | 100 | 0.4056 | N/A | ||||
IF-2 (Inhibitor Intensifier) | Trican Well Service | Acid | potassium iodide | 7681-11-0 | 100 | 0.0001 | N/A | |
AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0095 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0095 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0095 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0095 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0095 | N/A | ||||
CC-7 (Clay Stabilizer) | Trican Well Service | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0847 | N/A | |
water | Not Available | 100 | 0.0847 | N/A | ||||
ASA-61 Antisludge | Trican Well Service | Demulsifier | alkylbenzenesulfonic acid | 68584-22-5 | 100 | 0.004 | N/A | |
benzenesulfonic acid. decyl(sulfophenoxy)-. disodium salt | 36445-71-3 | 100 | 0.004 | N/A | ||||
dipropylene glycol | 25265-71-8 | 100 | 0.004 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.004 | N/A | ||||
FR-22 (Friction Reducer) | Trican Well Service | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0441 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0441 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0441 | N/A | ||||
MFR-2 (Metal Friction Reducer) | Canyon Technical Services | Friction Reducer | No specific ingredients | Not Available | 100 | 0.0291 | N/A | |
AI-11 Corrosion Inhibitor | Trican Well Service | Iron Control | non-hazardous ingredients | Not Available | 100 | 0.003 | N/A | |
potassium iodide | 7681-11-0 | 100 | 0.003 | N/A | ||||
propargyl alcohol | 107-19-7 | 100 | 0.003 | N/A | ||||
propargyl alcohol derivative | Not Available | 100 | 0.003 | N/A | ||||
IC-8 Iron Control | Trican Well Service | Iron Control | 2-aminoethanol | 141-43-5 | 100 | 0.0012 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0012 | N/A | ||||
copper(II)chloride | 7447-39-4 | 100 | 0.0012 | N/A | ||||
GNE-2 Green Non Emulsifier | Trican Well Service | Surfactant | non-hazardous ingredients | Not Available | 100 | 0.0404 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0404 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-11-19 | 2017-11-23 | Surface Water - River | 3979 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 747 | 0.0 | 0.0 | 0.0 |
2018 | 8625 | 0.0 | 0.0 | 0.0 |
2019 | 8543 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-11-09 | No Incident Encountered | 0.00 | 0.00 |
2017-11-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]