If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455123502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.932509,"lon":-115.629655,"icon":""}]} |
Location: 00/02-35-045-12W5/0 | |
Location Alias: 00/02-35-45-12 W5M | |
Location Alias 2: 00/02-35-045-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 12 | |
Section: 35 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 2-35-45-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0431089 | |
License Date: 2011-02-02 | |
License Status: Issued | |
Spud Date: 2011-03-29 | |
Final Drill Date: 2011-04-10 | |
Well Total Depth: 3726.00 m | |
Surface Hole Latitude: 52.932509 | |
Surface Hole Longitude: -115.629655 |
Date | Event |
---|---|
2011-02-02 | Obtained License |
2011-03-31 | Surface Casing Operation Performed |
2011-04-01 | Well Log Performed |
2011-04-02 | Direction Drilling Operation Performed - Horizontal |
2011-04-10 | Finished Drilling |
2011-04-10 | Well Log Performed |
2011-04-10 | Well Mode changed to Drilled and Cased |
2011-04-12 | Production Casing Operation Performed |
2011-04-13 | Perforation Treatment Performed - Open-Hole Completion |
2011-04-13 | Rig Released |
2011-07-15 | Well Log Performed |
2011-08-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-07 | Well Began Production |
2011-08-07 | Well Fluid changed to Crude Oil |
2011-08-07 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-04-02 | 1760.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-04-13 | Open Hole/Barefoot Completion | 3721.00 | 3726.00 | 0 |
2011-08-04 | Multi-Stage Fracture | 3146.30 | 3146.40 | 0 |
2011-08-04 | Multi-Stage Fracture | 3070.60 | 3070.70 | 0 |
2011-08-04 | Multi-Stage Fracture | 3008.00 | 3008.10 | 0 |
2011-08-04 | Multi-Stage Fracture | 2933.60 | 2933.70 | 0 |
2011-08-04 | Multi-Stage Fracture | 2856.40 | 2856.50 | 0 |
2011-08-06 | Multi-Stage Fracture | 2793.30 | 2793.40 | 0 |
2011-08-06 | Multi-Stage Fracture | 2717.10 | 2717.20 | 0 |
2011-08-06 | Multi-Stage Fracture | 2654.70 | 2654.80 | 0 |
2011-08-06 | Multi-Stage Fracture | 2577.30 | 2577.40 | 0 |
2011-08-06 | Multi-Stage Fracture | 2514.40 | 2514.50 | 0 |
2011-08-04 | Multi-Stage Fracture | 3695.00 | 3695.10 | 0 |
2011-08-06 | Multi-Stage Fracture | 2437.00 | 2437.10 | 0 |
2011-08-06 | Multi-Stage Fracture | 2374.00 | 2374.10 | 0 |
2011-08-04 | Multi-Stage Fracture | 3626.00 | 3626.10 | 0 |
2011-08-04 | Multi-Stage Fracture | 3564.30 | 3564.40 | 0 |
2011-08-04 | Multi-Stage Fracture | 3488.20 | 3488.30 | 0 |
2011-08-04 | Multi-Stage Fracture | 3425.10 | 3425.20 | 0 |
2011-08-04 | Multi-Stage Fracture | 3347.80 | 3347.90 | 0 |
2011-08-04 | Multi-Stage Fracture | 3284.70 | 3284.80 | 0 |
2011-08-04 | Multi-Stage Fracture | 3208.30 | 3208.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1404 | 0.0 | 0.0 | 0.0 |
2012 | 8084 | 0.0 | 0.0 | 0.0 |
2013 | 8622 | 0.0 | 0.0 | 0.0 |
2014 | 8647 | 0.0 | 0.0 | 0.0 |
2015 | 7250 | 0.0 | 0.0 | 0.0 |
2016 | 8641 | 0.0 | 0.0 | 0.0 |
2017 | 8463 | 0.0 | 0.0 | 0.0 |
2018 | 7771 | 0.0 | 0.0 | 0.0 |
2019 | 8147 | 0.0 | 0.0 | 0.0 |
2020 | 1980 | 0.0 | 0.0 | 0.0 |
For data sources see[6]