X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455121213000

Well Details

Well ID: 0455121213000
Loading map...
Location: 00/13-12-045-12W5/0
Location Alias: 00/13-12-45-12 W5M
Location Alias 2: 00/13-12-045-12 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 12
Section: 12
County/Municipality: Brazeau County
Well Name: WESTBRICK HZ PEMBINA 13-12-45-12
Operator Name: Westbrick Energy Ltd.
License Number: 0479914
License Date: 2016-07-19
License Status: Amended
Spud Date: 2016-10-13
Final Drill Date: 2016-10-28
Well Total Depth: 5582.00 m
Surface Hole Latitude: 52.870972
Surface Hole Longitude: -115.572534

For data sources see[1][2]

Well History

Date Event
2016-01-21 Well Log Performed
2016-07-19 Obtained License
2016-10-13 Lost Circulation Occurred
2016-10-15 Surface Casing Operation Performed
2016-10-19 Direction Drilling Operation Performed - Deviate
2016-10-19 Kick Occurred
2016-10-20 Direction Drilling Operation Performed - Horizontal
2016-10-20 Well Log Performed
2016-10-21 Intermediate Casing Operation Performed
2016-10-21 Well Log Performed
2016-10-28 Finished Drilling
2016-10-28 Well Log Performed
2016-10-28 Well Mode changed to Drilled and Cased
2016-10-29 Well Log Performed
2016-10-30 Liner Casing Operation Performed
2016-10-30 Perforation Treatment Performed - Open-Hole Completion
2016-10-30 Rig Released
2016-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-01 Well Fluid changed to Gas
2016-12-01 Well Mode changed to Testing
2016-12-02 Well Began Production
2016-12-02 Well Fluid changed to Gas
2016-12-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-10-13 Nabors Drilling Limited 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-10-19 2326.10 Deviate (5 - 79 degrees)
2016-10-20 2671.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-30 Open Hole/Barefoot Completion 4930.00 5582.00 0
2016-11-23 Multi-Stage Fracture 4170.90 4171.10 0
2016-11-23 Multi-Stage Fracture 4088.60 4088.80 0
2016-11-23 Multi-Stage Fracture 3992.20 3992.40 0
2016-11-23 Multi-Stage Fracture 3910.30 3910.50 0
2016-11-23 Multi-Stage Fracture 3813.80 3814.00 0
2016-11-23 Multi-Stage Fracture 3731.30 3731.50 0
2016-11-23 Multi-Stage Fracture 3634.90 3635.10 0
2016-11-23 Multi-Stage Fracture 3552.10 3552.30 0
2016-11-23 Multi-Stage Fracture 3456.00 3456.20 0
2016-11-23 Multi-Stage Fracture 3373.20 3373.40 0
2016-11-22 Multi-Stage Fracture 4893.60 4893.80 0
2016-11-23 Multi-Stage Fracture 3277.70 3277.90 0
2016-11-23 Multi-Stage Fracture 3194.90 3195.10 0
2016-11-23 Multi-Stage Fracture 3098.40 3098.60 0
2016-11-23 Multi-Stage Fracture 3008.10 3008.30 0
2016-11-23 Multi-Stage Fracture 2914.70 2914.90 0
2016-11-23 Multi-Stage Fracture 2827.30 2827.50 0
2016-11-23 Multi-Stage Fracture 2744.60 2744.80 0
2016-11-23 Multi-Stage Fracture 4804.60 4804.80 0
2016-11-23 Multi-Stage Fracture 4708.50 4708.70 0
2016-11-23 Multi-Stage Fracture 4625.80 4626.00 0
2016-11-23 Multi-Stage Fracture 4529.50 4529.70 0
2016-11-23 Multi-Stage Fracture 4446.60 4446.80 0
2016-11-23 Multi-Stage Fracture 4350.20 4350.40 0
2016-11-23 Multi-Stage Fracture 4267.30 4267.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-22 2016-11-23 2,621 5,806 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 86.0816 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 8.7433 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 3.5071 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 1.8195 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0113 N/A
2-mercaptoethanol 60-24-2 100 0.0113 N/A
dibromoacetonitrile 3252-43-5 100 0.0113 N/A
non-hazardous ingredients Not Available 100 0.0113 N/A
sodium bromide 7647-15-6 100 0.0113 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0085 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1619 N/A
non-hazardous ingredients Not Available 100 0.1619 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0447 N/A
propylene glycol 57-55-6 100 0.0447 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0299 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0179 N/A
non-hazardous ingredients Not Available 100 0.0179 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-11-08 2016-11-12 Surface Water - Lake 5808

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 505 0.0 0.0 0.0
2017 7729 0.0 0.0 0.0
2018 6215 0.0 0.0 0.0
2019 4391 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-13 Lost Circulation 80.00 80.00
2016-10-19 Kick 2343.00 2343.00
2016-12-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References