X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455113202000

Well Details

Well ID: 0455113202000
Loading map...
Location: 00/02-32-045-11W5/0
Location Alias: 00/02-32-45-11 W5M
Location Alias 2: 00/02-32-045-11 W5/00
Province: Alberta
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 2-32-45-11
Operator Name: Ridgeback Resources Inc.
License Number: 0447161
License Date: 2012-07-16
License Status: Issued
Spud Date: 2012-08-21
Final Drill Date: 2012-09-03
Well Total Depth: 3651 m
Surface Hole Latitude: 52.932513
Surface Hole Longitude: -115.554885

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
21 Aug 2012 Chinook Drilling Inc. 9 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-08-26 1692
2012-08-28 2186 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-05 Open Hole/Barefoot Completion 3647.3 3651 0
2012-09-25 Multi-Stage Fracture 3621.3 3621.4 0
2012-09-25 Multi-Stage Fracture 3552.4 3552.5 0
2012-09-25 Multi-Stage Fracture 3476.9 3477 0
2012-09-25 Multi-Stage Fracture 3415.9 3416 0
2012-09-25 Multi-Stage Fracture 3340.9 3341 0
2012-09-25 Multi-Stage Fracture 3281.2 3281.3 0
2012-09-25 Multi-Stage Fracture 3205.6 3205.7 0
2012-09-25 Multi-Stage Fracture 3147.4 3147.5 0
2012-09-26 Multi-Stage Fracture 3072.5 3072.6 0
2012-09-26 Multi-Stage Fracture 2996.9 2997 0
2012-09-26 Multi-Stage Fracture 2936.8 2936.9 0
2012-09-26 Multi-Stage Fracture 2861.9 2862 0
2012-09-26 Multi-Stage Fracture 2801 2801.1 0
2012-09-26 Multi-Stage Fracture 2725.5 2725.6 0
2012-09-26 Multi-Stage Fracture 2664.9 2665 0
2012-09-26 Multi-Stage Fracture 2590.1 2590.2 0
2012-09-26 Multi-Stage Fracture 2528.9 2529 0
2012-09-26 Multi-Stage Fracture 2453.9 2454 0
2012-09-26 Multi-Stage Fracture 2392.8 2392.9 0
2012-09-26 Multi-Stage Fracture 2317.5 2317.6 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 655 897.7 0.0 0.0
2013 7616 5619.4 0.0 0.0
2014 8012 1997.4 0.0 0.0
2015 8609 2271.9 0.0 0.0
2016 8426 2062.2 0.0 0.0
2017 8487 1817.6 0.0 103.8
2018 8703 1362.1 0.0 91.3
2019 2107 303.0 0.0 20.8

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-21 Lost Circulation 70.00 152.00
2012-08-22 Lost Circulation 90.00 190.00
2012-10-02 No Incident N/A N/A

For data sources see[7]

References