X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0454220102022"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0454220102022
 
| Well ID: 0454220102022
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.845272, -113.060887 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.845272, -113.060887 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/02-01-045-22W4/2
 
| Location: 02/02-01-045-22W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/02-01-045-22 W4/02
 
| Location Alias 2: 02/02-01-045-22 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 045
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 22
 +
|-
 +
| Section: 01
 
|-
 
|-
 
| County/Municipality: [[Camrose County,_Alberta|Camrose County]]
 
| County/Municipality: [[Camrose County,_Alberta|Camrose County]]
Line 17: Line 27:
 
| Well Name: CNRL ET AL MALMO 2A-1-45-22
 
| Well Name: CNRL ET AL MALMO 2A-1-45-22
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Canadian Natural Resources Limited]]
 
|-
 
|-
 
| License Number: 0004051
 
| License Number: 0004051
Line 29: Line 39:
 
| Final Drill Date: 1966-02-10
 
| Final Drill Date: 1966-02-10
 
|-
 
|-
| Well Total Depth: 1489.6 m
+
| Well Total Depth: 1489.60 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.845272
 
| Surface Hole Latitude: 52.845272
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1952-01-07
 +
| Obtained License
 +
|-
 +
| 1952-02-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-02-21
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1952-02-25
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1952-02-26
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1952-02-29
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1952-03-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1952-03-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-03-04
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1952-03-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1952-03-08
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1966-01-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1966-01-21
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1966-02-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1966-02-10
 +
| Finished Drilling
 +
|-
 +
| 1966-02-10
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1966-02-10
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1966-02-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1966-02-16
 +
| Well Began Production
 +
|-
 +
| 1966-02-16
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1966-02-16
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1966-03-22
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1966-03-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1966-03-28
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1966-04-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1966-04-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1966-04-14
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1966-04-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1967-01-05
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1967-01-05
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1967-01-05
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1967-01-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-05-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1986-05-05
 +
| Plug Back Performed
 +
|-
 +
| 1986-05-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-05-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1989-09-28
 +
| Well Log Performed
 +
|-
 +
| 1990-06-08
 +
| Well Log Performed
 +
|-
 +
| 1990-06-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-08-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-08-03
 +
| Plug Back Performed
 +
|-
 +
| 2012-08-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-08-07
 +
| Plug Back Performed
 +
|-
 +
| 2013-12-20
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 231:
 
| 1952-02-25
 
| 1952-02-25
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1285.6
+
| style="text-align: right;" | 1285.60
| style="text-align: right;" | 1286.3
+
| style="text-align: right;" | 1286.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1952-02-26
 
| 1952-02-26
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1285.6
+
| style="text-align: right;" | 1285.60
| style="text-align: right;" | 1286.3
+
| style="text-align: right;" | 1286.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-02-29
 
| 1952-02-29
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1284.4
+
| style="text-align: right;" | 1284.40
| style="text-align: right;" | 1285
+
| style="text-align: right;" | 1285.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1952-03-01
 
| 1952-03-01
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1284.4
+
| style="text-align: right;" | 1284.40
| style="text-align: right;" | 1285
+
| style="text-align: right;" | 1285.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-03-04
 
| 1952-03-04
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1285
+
| style="text-align: right;" | 1285.00
| style="text-align: right;" | 1286
+
| style="text-align: right;" | 1286.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-03-05
 
| 1952-03-05
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1285
+
| style="text-align: right;" | 1285.00
| style="text-align: right;" | 1286
+
| style="text-align: right;" | 1286.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-03-08
 
| 1952-03-08
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1406.7
+
| style="text-align: right;" | 1406.70
| style="text-align: right;" | 1409.7
+
| style="text-align: right;" | 1409.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1966-01-21
 
| 1966-01-21
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1406.7
+
| style="text-align: right;" | 1406.70
| style="text-align: right;" | 1409.7
+
| style="text-align: right;" | 1409.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-01-21
 
| 1966-01-21
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1407
+
| style="text-align: right;" | 1407.00
| style="text-align: right;" | 1409.7
+
| style="text-align: right;" | 1409.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-02-10
 
| 1966-02-10
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 1485.9
+
| style="text-align: right;" | 1485.90
| style="text-align: right;" | 1488.9
+
| style="text-align: right;" | 1488.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-02-12
 
| 1966-02-12
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1485.9
+
| style="text-align: right;" | 1485.90
| style="text-align: right;" | 1488.9
+
| style="text-align: right;" | 1488.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-03-22
 
| 1966-03-22
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1482.9
+
| style="text-align: right;" | 1482.90
| style="text-align: right;" | 1484.4
+
| style="text-align: right;" | 1484.40
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1966-03-23
 
| 1966-03-23
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1482.9
+
| style="text-align: right;" | 1482.90
| style="text-align: right;" | 1484.4
+
| style="text-align: right;" | 1484.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-03-28
 
| 1966-03-28
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1482.9
+
| style="text-align: right;" | 1482.90
| style="text-align: right;" | 1484.4
+
| style="text-align: right;" | 1484.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-04-06
 
| 1966-04-06
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1485.9
+
| style="text-align: right;" | 1485.90
| style="text-align: right;" | 1488.9
+
| style="text-align: right;" | 1488.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-04-12
 
| 1966-04-12
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1485.9
+
| style="text-align: right;" | 1485.90
| style="text-align: right;" | 1488.9
+
| style="text-align: right;" | 1488.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-04-14
 
| 1966-04-14
 
| Open Hole/Barefoot Completion
 
| Open Hole/Barefoot Completion
| style="text-align: right;" | 1485.9
+
| style="text-align: right;" | 1485.90
| style="text-align: right;" | 1489.6
+
| style="text-align: right;" | 1489.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1966-04-19
 
| 1966-04-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1485.9
+
| style="text-align: right;" | 1485.90
| style="text-align: right;" | 1489.6
+
| style="text-align: right;" | 1489.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1967-01-05
 
| 1967-01-05
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1364.6
+
| style="text-align: right;" | 1364.60
| style="text-align: right;" | 1488.9
+
| style="text-align: right;" | 1488.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1967-01-06
 
| 1967-01-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1277.4
+
| style="text-align: right;" | 1277.40
| style="text-align: right;" | 1280.5
+
| style="text-align: right;" | 1280.50
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1986-05-05
 
| 1986-05-05
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1274
+
| style="text-align: right;" | 1274.00
| style="text-align: right;" | 1276.5
+
| style="text-align: right;" | 1276.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1986-05-07
 
| 1986-05-07
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1079.3
+
| style="text-align: right;" | 1079.30
| style="text-align: right;" | 1080.8
+
| style="text-align: right;" | 1080.80
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1986-05-12
 
| 1986-05-12
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1079.3
+
| style="text-align: right;" | 1079.30
| style="text-align: right;" | 1080.8
+
| style="text-align: right;" | 1080.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-06-09
 
| 1990-06-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1268.6
+
| style="text-align: right;" | 1268.60
| style="text-align: right;" | 1269.8
+
| style="text-align: right;" | 1269.80
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2012-08-03
 
| 2012-08-03
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1254
+
| style="text-align: right;" | 1254.00
| style="text-align: right;" | 1262
+
| style="text-align: right;" | 1262.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-08-07
 
| 2012-08-07
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1065
+
| style="text-align: right;" | 1065.00
| style="text-align: right;" | 1073
+
| style="text-align: right;" | 1073.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 232: Line 389:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 265: Line 436:
 
| 1966
 
| 1966
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 149.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 86.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 273: Line 444:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 284: Line 455:
 
|-
 
|-
 
| 2012-08-08
 
| 2012-08-08
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2012-08-08
 
| 2012-08-08
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2012-08-08
 
| 2012-08-08
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 302: Line 473:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 15:28, 8 July 2020

Well Details

Well ID: 0454220102022
Loading map...
Location: 02/02-01-045-22W4/2
Location Alias: 02/02-01-45-22 W4M
Location Alias 2: 02/02-01-045-22 W4/02
Country: Canada
Province: Alberta
Township: 045
Meridian: 4
Range: 22
Section: 01
County/Municipality: Camrose County
Well Name: CNRL ET AL MALMO 2A-1-45-22
Operator Name: Canadian Natural Resources Limited
License Number: 0004051
License Date: 1952-01-07
License Status: Abandoned
Spud Date: 1952-01-19
Final Drill Date: 1966-02-10
Well Total Depth: 1489.60 m
Surface Hole Latitude: 52.845272
Surface Hole Longitude: -113.060887

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-01-07 Obtained License
1952-02-11 Drill Stem Test Performed
1952-02-21 Liner Casing Operation Performed
1952-02-25 Perforation Treatment Performed - Bullet Perforation
1952-02-26 Perforation Treatment Performed - Cement Squeeze
1952-02-29 Perforation Treatment Performed - Bullet Perforation
1952-03-01 Perforation Treatment Performed - Cement Squeeze
1952-03-03 Drill Stem Test Performed
1952-03-04 Perforation Treatment Performed - Bullet Perforation
1952-03-05 Perforation Treatment Performed - Cement Squeeze
1952-03-08 Perforation Treatment Performed - Bullet Perforation
1966-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-01-21 Perforation Treatment Performed - Cement Squeeze
1966-02-10 Drill Stem Test Performed
1966-02-10 Finished Drilling
1966-02-10 Perforation Treatment Performed - Open-Hole Completion
1966-02-10 Well Mode changed to Drilled and Cased
1966-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-16 Well Began Production
1966-02-16 Well Fluid changed to Crude Oil
1966-02-16 Well Mode changed to Flowing
1966-03-22 Perforation Treatment Performed - Bullet Perforation
1966-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-28 Perforation Treatment Performed - Cement Squeeze
1966-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-04-12 Perforation Treatment Performed - Cement Squeeze
1966-04-14 Perforation Treatment Performed - Open-Hole Completion
1966-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-05 Perforation Treatment Performed - Cement Plug
1967-01-05 Well Fluid changed to Crude Oil
1967-01-05 Well Mode changed to Abandoned Zone
1967-01-06 Perforation Treatment Performed - Jet Perforation
1986-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-05-05 Plug Back Performed
1986-05-07 Perforation Treatment Performed - Jet Perforation
1986-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-28 Well Log Performed
1990-06-08 Well Log Performed
1990-06-09 Perforation Treatment Performed - Jet Perforation
2012-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-03 Plug Back Performed
2012-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-07 Plug Back Performed
2013-12-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-25 Bullet Perforation 1285.60 1286.30 13
1952-02-26 Cement Squeeze 1285.60 1286.30 0
1952-02-29 Bullet Perforation 1284.40 1285.00 13
1952-03-01 Cement Squeeze 1284.40 1285.00 0
1952-03-04 Bullet Perforation 1285.00 1286.00 0
1952-03-05 Cement Squeeze 1285.00 1286.00 0
1952-03-08 Bullet Perforation 1406.70 1409.70 13
1966-01-21 Acid Treatment 1406.70 1409.70 0
1966-01-21 Cement Squeeze 1407.00 1409.70 0
1966-02-10 Open Hole/Barefoot Completion 1485.90 1488.90 0
1966-02-12 Acid Treatment 1485.90 1488.90 0
1966-03-22 Bullet Perforation 1482.90 1484.40 7
1966-03-23 Acid Treatment 1482.90 1484.40 0
1966-03-28 Cement Squeeze 1482.90 1484.40 0
1966-04-06 Acid Treatment 1485.90 1488.90 0
1966-04-12 Cement Squeeze 1485.90 1488.90 0
1966-04-14 Open Hole/Barefoot Completion 1485.90 1489.60 0
1966-04-19 Acid Treatment 1485.90 1489.60 0
1967-01-05 Cement Plug 1364.60 1488.90 0
1967-01-06 Perforation 1277.40 1280.50 7
1986-05-05 Packing Device Capped w/Cement 1274.00 1276.50 0
1986-05-07 Perforation 1079.30 1080.80 7
1986-05-12 Acid Treatment 1079.30 1080.80 0
1990-06-09 Perforation 1268.60 1269.80 7
2012-08-03 Packing Device Capped w/Cement 1254.00 1262.00 0
2012-08-07 Packing Device Capped w/Cement 1065.00 1073.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-08 No Incident Encountered 0.00 0.00
2012-08-08 No Incident Encountered 0.00 0.00
2012-08-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References