X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0444221412022"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0444221412022
 
| Well ID: 0444221412022
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.794153, -113.097719 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.794153, -113.097719 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/12-14-044-22W4/2
 
| Location: 02/12-14-044-22W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 02/12-14-044-22 W4/02
 
| Location Alias 2: 02/12-14-044-22 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 044
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 22
 +
|-
 +
| Section: 14
 
|-
 
|-
 
| County/Municipality: [[County of Wetaskiwin No. 10,_Alberta|County of Wetaskiwin No. 10]]
 
| County/Municipality: [[County of Wetaskiwin No. 10,_Alberta|County of Wetaskiwin No. 10]]
Line 17: Line 27:
 
| Well Name: CNRL ET AL MALMO 12-14N-44-22
 
| Well Name: CNRL ET AL MALMO 12-14N-44-22
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Canadian Natural Resources Limited]]
 
|-
 
|-
 
| License Number: 0005250
 
| License Number: 0005250
Line 29: Line 39:
 
| Final Drill Date: 1952-09-28
 
| Final Drill Date: 1952-09-28
 
|-
 
|-
| Well Total Depth: 1563 m
+
| Well Total Depth: 1563.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.794153
 
| Surface Hole Latitude: 52.794153
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1952-09-04
 +
| Obtained License
 +
|-
 +
| 1952-09-28
 +
| Finished Drilling
 +
|-
 +
| 1952-09-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1952-09-30
 +
| Production Casing Operation Performed
 +
|-
 +
| 1952-10-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-10-03
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1952-10-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1952-10-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-10-07
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1952-10-08
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-10-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1952-10-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-10-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1952-10-16
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1953-10-15
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-03-24
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1956-03-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-03-25
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1956-03-27
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-03-30
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1956-04-29
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1956-04-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1956-04-30
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1957-09-06
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1987-11-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1987-11-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-11-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1989-09-26
 +
| Well Log Performed
 +
|-
 +
| 1989-11-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1989-12-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-12-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1992-12-29
 +
| Plug Back Performed
 +
|-
 +
| 1992-12-29
 +
| Well Log Performed
 +
|-
 +
| 1992-12-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1992-12-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-12-30
 +
| Well Log Performed
 +
|-
 +
| 1992-12-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-01-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-01-02
 +
| Well Log Performed
 +
|-
 +
| 1993-01-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-01-07
 +
| Well Began Production
 +
|-
 +
| 1993-01-07
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1993-01-07
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1993-01-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1993-01-22
 +
| Well Log Performed
 +
|-
 +
| 1993-01-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-01-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-01-25
 +
| Well Log Performed
 +
|-
 +
| 1993-01-26
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-07-28
 +
| Well Log Performed
 +
|-
 +
| 1996-07-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-01-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2001-01-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2003-06-19
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2003-06-19
 +
| Plug Back Performed
 +
|-
 +
| 2003-06-19
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2003-06-19
 +
| Well Log Performed
 +
|-
 +
| 2003-06-19
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2003-06-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-06-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2003-06-21
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2003-06-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-06-21
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2003-06-21
 +
| Plug Back Performed
 +
|-
 +
| 2003-06-21
 +
| Well Log Performed
 +
|-
 +
| 2003-07-09
 +
| Well Abandoned
 +
|-
 +
| 2005-08-13
 +
| Well Log Performed
 +
|-
 +
| 2005-08-15
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 303:
 
| 1952-10-03
 
| 1952-10-03
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1441.7
+
| style="text-align: right;" | 1441.70
| style="text-align: right;" | 1442
+
| style="text-align: right;" | 1442.00
 
| style="text-align: right;" | 26
 
| style="text-align: right;" | 26
 
|-
 
|-
 
| 1952-10-04
 
| 1952-10-04
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1441.7
+
| style="text-align: right;" | 1441.70
| style="text-align: right;" | 1442
+
| style="text-align: right;" | 1442.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-10-07
 
| 1952-10-07
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1441.7
+
| style="text-align: right;" | 1441.70
| style="text-align: right;" | 1442
+
| style="text-align: right;" | 1442.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-10-09
 
| 1952-10-09
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1441.7
+
| style="text-align: right;" | 1441.70
| style="text-align: right;" | 1442
+
| style="text-align: right;" | 1442.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-10-11
 
| 1952-10-11
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1441.7
+
| style="text-align: right;" | 1441.70
| style="text-align: right;" | 1442
+
| style="text-align: right;" | 1442.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1952-10-16
 
| 1952-10-16
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1561.2
+
| style="text-align: right;" | 1561.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1956-03-24
 
| 1956-03-24
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1552
+
| style="text-align: right;" | 1552.00
| style="text-align: right;" | 1553.6
+
| style="text-align: right;" | 1553.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1956-03-25
 
| 1956-03-25
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1552
+
| style="text-align: right;" | 1552.00
| style="text-align: right;" | 1553.6
+
| style="text-align: right;" | 1553.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1956-03-30
 
| 1956-03-30
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1561.2
+
| style="text-align: right;" | 1561.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1956-04-29
 
| 1956-04-29
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1561.2
+
| style="text-align: right;" | 1561.20
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1956-04-29
 
| 1956-04-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1561.2
+
| style="text-align: right;" | 1561.20
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1956-04-30
 
| 1956-04-30
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1561.2
+
| style="text-align: right;" | 1561.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1957-09-06
 
| 1957-09-06
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1561.2
+
| style="text-align: right;" | 1561.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-11-09
 
| 1987-11-09
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1559.7
+
| style="text-align: right;" | 1559.70
| style="text-align: right;" | 1561.2
+
| style="text-align: right;" | 1561.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1987-11-16
 
| 1987-11-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1553.9
+
| style="text-align: right;" | 1553.90
| style="text-align: right;" | 1555.1
+
| style="text-align: right;" | 1555.10
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1987-11-17
 
| 1987-11-17
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1553.9
+
| style="text-align: right;" | 1553.90
| style="text-align: right;" | 1555.1
+
| style="text-align: right;" | 1555.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1989-11-29
 
| 1989-11-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1539.9
+
| style="text-align: right;" | 1539.90
| style="text-align: right;" | 1541.7
+
| style="text-align: right;" | 1541.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1989-12-02
 
| 1989-12-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1528
+
| style="text-align: right;" | 1528.00
| style="text-align: right;" | 1530
+
| style="text-align: right;" | 1530.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1992-12-29
 
| 1992-12-29
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1530
+
| style="text-align: right;" | 1530.00
| style="text-align: right;" | 1537
+
| style="text-align: right;" | 1537.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-12-30
 
| 1992-12-30
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1512
+
| style="text-align: right;" | 1512.00
| style="text-align: right;" | 1520
+
| style="text-align: right;" | 1520.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-12-30
 
| 1992-12-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1440
+
| style="text-align: right;" | 1440.00
| style="text-align: right;" | 1444
+
| style="text-align: right;" | 1444.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1992-12-31
 
| 1992-12-31
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1440
+
| style="text-align: right;" | 1440.00
| style="text-align: right;" | 1441
+
| style="text-align: right;" | 1441.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-01-02
 
| 1993-01-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1437.2
+
| style="text-align: right;" | 1437.20
| style="text-align: right;" | 1438.2
+
| style="text-align: right;" | 1438.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-01-05
 
| 1993-01-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1436.5
+
| style="text-align: right;" | 1436.50
| style="text-align: right;" | 1437.5
+
| style="text-align: right;" | 1437.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 1993-01-20
 
| 1993-01-20
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1436.5
+
| style="text-align: right;" | 1436.50
| style="text-align: right;" | 1444
+
| style="text-align: right;" | 1444.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-01-23
 
| 1993-01-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1435
+
| style="text-align: right;" | 1435.00
| style="text-align: right;" | 1436
+
| style="text-align: right;" | 1436.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-01-25
 
| 1993-01-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1435
+
| style="text-align: right;" | 1435.00
| style="text-align: right;" | 1436
+
| style="text-align: right;" | 1436.00
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 1993-01-26
 
| 1993-01-26
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1435
+
| style="text-align: right;" | 1435.00
| style="text-align: right;" | 1436
+
| style="text-align: right;" | 1436.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996-07-29
 
| 1996-07-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1430.7
+
| style="text-align: right;" | 1430.70
| style="text-align: right;" | 1433.7
+
| style="text-align: right;" | 1433.70
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2003-06-19
 
| 2003-06-19
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1420
+
| style="text-align: right;" | 1420.00
| style="text-align: right;" | 1428
+
| style="text-align: right;" | 1428.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003-06-20
 
| 2003-06-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1345.4
+
| style="text-align: right;" | 1345.40
| style="text-align: right;" | 1347.8
+
| style="text-align: right;" | 1347.80
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2003-06-21
 
| 2003-06-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1334
+
| style="text-align: right;" | 1334.00
| style="text-align: right;" | 1342
+
| style="text-align: right;" | 1342.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003-06-21
 
| 2003-06-21
 
| Perforation
 
| Perforation
| style="text-align: right;" | 164.5
+
| style="text-align: right;" | 164.50
| style="text-align: right;" | 165
+
| style="text-align: right;" | 165.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2003-06-21
 
| 2003-06-21
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 164.5
+
| style="text-align: right;" | 164.50
| style="text-align: right;" | 165
+
| style="text-align: right;" | 165.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003-06-21
 
| 2003-06-21
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 53
+
| style="text-align: right;" | 53.00
| style="text-align: right;" | 165
+
| style="text-align: right;" | 165.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 286: Line 515:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 319: Line 562:
 
| 1993
 
| 1993
 
| style="text-align: right;" | 7986
 
| style="text-align: right;" | 7986
| style="text-align: right;" | 337.9
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 6321.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1994
 
| 1994
 
| style="text-align: right;" | 8522
 
| style="text-align: right;" | 8522
| style="text-align: right;" | 222.0
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 8853.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1995
 
| 1995
 
| style="text-align: right;" | 8556
 
| style="text-align: right;" | 8556
| style="text-align: right;" | 126.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 9526.4
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1996
 
| 1996
 
| style="text-align: right;" | 8654
 
| style="text-align: right;" | 8654
| style="text-align: right;" | 83.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 10010.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1997
 
| 1997
 
| style="text-align: right;" | 1430
 
| style="text-align: right;" | 1430
| style="text-align: right;" | 14.2
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 1401.4
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 351: Line 594:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 00:35, 8 July 2020

Well Details

Well ID: 0444221412022
Loading map...
Location: 02/12-14-044-22W4/2
Location Alias: 02/12-14-44-22 W4M
Location Alias 2: 02/12-14-044-22 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL ET AL MALMO 12-14N-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0005250
License Date: 1952-09-04
License Status: RecCertified
Spud Date: 1952-09-10
Final Drill Date: 1952-09-28
Well Total Depth: 1563.00 m
Surface Hole Latitude: 52.794153
Surface Hole Longitude: -113.097719

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-04 Obtained License
1952-09-28 Finished Drilling
1952-09-28 Well Mode changed to Drilled and Cased
1952-09-30 Production Casing Operation Performed
1952-10-03 Drill Stem Test Performed
1952-10-03 Perforation Treatment Performed - Bullet Perforation
1952-10-04 Perforation Treatment Performed - Cement Squeeze
1952-10-06 Drill Stem Test Performed
1952-10-07 Perforation Treatment Performed - Cement Squeeze
1952-10-08 Drill Stem Test Performed
1952-10-09 Perforation Treatment Performed - Cement Squeeze
1952-10-11 Drill Stem Test Performed
1952-10-11 Perforation Treatment Performed - Cement Squeeze
1952-10-16 Perforation Treatment Performed - Bullet Perforation
1953-10-15 Drill Stem Test Performed
1956-03-24 Perforation Treatment Performed - Bullet Perforation
1956-03-25 Drill Stem Test Performed
1956-03-25 Perforation Treatment Performed - Cement Squeeze
1956-03-27 Drill Stem Test Performed
1956-03-30 Perforation Treatment Performed - Cement Squeeze
1956-04-29 Perforation Treatment Performed - Bullet Perforation
1956-04-29 Perforation Treatment Performed - Jet Perforation
1956-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-09 Perforation Treatment Performed - Cement Squeeze
1987-11-16 Perforation Treatment Performed - Jet Perforation
1987-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-26 Well Log Performed
1989-11-29 Perforation Treatment Performed - Jet Perforation
1989-12-02 Perforation Treatment Performed - Jet Perforation
1992-12-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-12-29 Plug Back Performed
1992-12-29 Well Log Performed
1992-12-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-12-30 Perforation Treatment Performed - Jet Perforation
1992-12-30 Well Log Performed
1992-12-31 Perforation Treatment Performed - Jet Perforation
1993-01-02 Perforation Treatment Performed - Jet Perforation
1993-01-02 Well Log Performed
1993-01-05 Perforation Treatment Performed - Jet Perforation
1993-01-07 Well Began Production
1993-01-07 Well Fluid changed to Crude Oil
1993-01-07 Well Mode changed to Pumping
1993-01-20 Perforation Treatment Performed - Cement Squeeze
1993-01-22 Well Log Performed
1993-01-23 Perforation Treatment Performed - Jet Perforation
1993-01-25 Perforation Treatment Performed - Jet Perforation
1993-01-25 Well Log Performed
1993-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-28 Well Log Performed
1996-07-29 Perforation Treatment Performed - Jet Perforation
2001-01-01 Well Fluid changed to Crude Oil
2001-01-01 Well Mode changed to Suspended
2003-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-19 Plug Back Performed
2003-06-19 Well Fluid changed to Crude Oil
2003-06-19 Well Log Performed
2003-06-19 Well Mode changed to Abandoned Zone
2003-06-20 Perforation Treatment Performed - Jet Perforation
2003-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-21 Perforation Treatment Performed - Cement Plug
2003-06-21 Perforation Treatment Performed - Jet Perforation
2003-06-21 Perforation Treatment Performed - Remedial Casing
2003-06-21 Plug Back Performed
2003-06-21 Well Log Performed
2003-07-09 Well Abandoned
2005-08-13 Well Log Performed
2005-08-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-03 Bullet Perforation 1441.70 1442.00 26
1952-10-04 Cement Squeeze 1441.70 1442.00 0
1952-10-07 Cement Squeeze 1441.70 1442.00 0
1952-10-09 Cement Squeeze 1441.70 1442.00 0
1952-10-11 Cement Squeeze 1441.70 1442.00 0
1952-10-16 Bullet Perforation 1559.70 1561.20 13
1956-03-24 Bullet Perforation 1552.00 1553.60 13
1956-03-25 Cement Squeeze 1552.00 1553.60 0
1956-03-30 Cement Squeeze 1559.70 1561.20 0
1956-04-29 Bullet Perforation 1559.70 1561.20 7
1956-04-29 Perforation 1559.70 1561.20 7
1956-04-30 Acid Treatment 1559.70 1561.20 0
1957-09-06 Acid Treatment 1559.70 1561.20 0
1987-11-09 Cement Squeeze 1559.70 1561.20 0
1987-11-16 Perforation 1553.90 1555.10 13
1987-11-17 Acid Treatment 1553.90 1555.10 0
1989-11-29 Perforation 1539.90 1541.70 13
1989-12-02 Perforation 1528.00 1530.00 13
1992-12-29 Packing Device Capped w/Cement 1530.00 1537.00 0
1992-12-30 Packing Device Capped w/Cement 1512.00 1520.00 0
1992-12-30 Perforation 1440.00 1444.00 13
1992-12-31 Perforation 1440.00 1441.00 13
1993-01-02 Perforation 1437.20 1438.20 13
1993-01-05 Perforation 1436.50 1437.50 14
1993-01-20 Cement Squeeze 1436.50 1444.00 0
1993-01-23 Perforation 1435.00 1436.00 13
1993-01-25 Perforation 1435.00 1436.00 18
1993-01-26 Acid Treatment 1435.00 1436.00 0
1996-07-29 Perforation 1430.70 1433.70 17
2003-06-19 Packing Device Capped w/Cement 1420.00 1428.00 0
2003-06-20 Perforation 1345.40 1347.80 20
2003-06-21 Packing Device Capped w/Cement 1334.00 1342.00 0
2003-06-21 Perforation 164.50 165.00 17
2003-06-21 Remedial Casing Cementing 164.50 165.00 0
2003-06-21 Cement Plug 53.00 165.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7986 0.0 0.0 0.0
1994 8522 0.0 0.0 0.0
1995 8556 0.0 0.0 0.0
1996 8654 0.0 0.0 0.0
1997 1430 0.0 0.0 0.0

For data sources see[5]

References