If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434040403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.670862,"lon":-110.523107,"icon":""}]} |
Location: 00/03-04-043-04W4/0 | |
Location Alias: 00/03-04-43-04 W4M | |
Location Alias 2: 00/03-04-043-04 W4/00 | |
Province: Alberta | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TALISMAN 3D RIBSTONE 3-4-43-4 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0377204 | |
License Date: 2007-05-15 | |
License Status: Issued | |
Spud Date: 2007-07-21 | |
Final Drill Date: 2007-07-26 | |
Well Total Depth: 813 m | |
Surface Hole Latitude: 52.670862 | |
Surface Hole Longitude: -110.523107 |
Start Date | Depth (m) | Reason |
---|---|---|
2007-07-22 | 220 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-07-26 | Open Hole/Barefoot Completion | 770 | 813 | 0 |
2007-09-06 | Perforation | 273 | 273.5 | 26 |
2007-09-27 | Remedial Casing Cementing | 273 | 273.5 | 0 |
2007-10-17 | Acid Treatment | 770 | 785 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 984 | 1.7 | 0.0 | 748.6 |
2008 | 8329 | 70.4 | 0.0 | 4761.1 |
2009 | 8407 | 75.6 | 0.0 | 1330.7 |
2010 | 8676 | 55.6 | 0.0 | 382.6 |
2011 | 8745 | 53.9 | 0.0 | 399.8 |
2012 | 8543 | 29.5 | 0.0 | 324.5 |
2013 | 7573 | 35.4 | 0.0 | 411.3 |
2014 | 8759 | 27.2 | 0.0 | 266.7 |
2015 | 8733 | 17.0 | 0.0 | 176.2 |
2016 | 8772 | 20.1 | 0.0 | 119.4 |
2017 | 8655 | 24.5 | 0.0 | 174.9 |
2018 | 7999 | 17.7 | 0.0 | 201.4 |
2019 | 2159 | 3.7 | 0.0 | 40.7 |
For data sources see[5]